For the Routine Testing and Commission of 3kv Dc Traction, 6,6kv and 11kv Distribution Substations ‘on an as and when Required Basis’ at Witbank for a Period of Twelve Months |
ERACMM4938-31809 |
2020-09-30 10:00 |
2020-10-08 10:00 |
Actuator Repairs of Siemens; Hopkinson, Lewa and Emg Actuators |
MPGXC006142R1 |
- |
2020-09-30 10:00 |
Boiler Ducting Repairs on Outages on an “as and when Required” Based at Tutuka Power Station for a Period of 5 Years |
MPGXC006363 |
- |
2020-10-13 10:00 |
For the Design, Supply and Installation of Safe Doors at Pretoria, Witbank and Polokwane Substations |
ERACES 5048-33259 |
2020-09-29 00:00 |
2020-10-06 10:00 |
Supply and Delivery Brush Electrical Type Generator Rotor Earth Width 28mm, Length 120mm, Thickness 30 Mm, Connection Bolt, Material, Cu Gold Finish, Current |
MPGXC006353 |
- |
2020-10-29 10:00 |
The Provision of Collecting, Dismantling, Repairing, Overhauling, Rewinding, Assembling , Painting , Testing, Supply of Spares , Delivering as Well as Replacing of Existing Electrical Motors on as and when Required Basis at Komati Power Station |
MPGXC006322 |
- |
2020-10-12 10:00 |
Supply of Yellow Plant with Operators to Kriel Power Station on an “as and when Required” Basis for a Period of Three (3) Years |
MPGXC006361 |
- |
2020-11-03 10:00 |
The Provision of Geotechnical Testing and Stability Assessment for a Period of 4 Months at Camden Power Station. |
MPGXC006350 |
- |
2020-09-23 10:00 |
The Provision of Telephone Management System for a Period of 36 Months at Camden Power Station |
MPGXC006360 |
- |
2020-11-02 10:00 |
Manufacture, Supply, Delivery and Replacement of Awr Pipe Lines from Lld to the Station to Duvha Power Station for a Twelve (12) Months Period |
MPGXC006051 |
2020-09-29 10:00 |
2020-09-29 10:00 |
Provision of Sandblasting and Surface Preparation Services on an “as and When” Required Basis at Kriel Power Station for a Period of 5 Years |
MPGXC006352 |
- |
2020-10-20 22:00 |
The Provision of Labour, Tools, Equipment, Consumable, Supervision, Management, Logistics, Storage and Support Services for the Grit Blasting of Turbine Valve Chest Components at Kendal Power Station |
MPGXC006335 |
- |
2020-10-21 10:00 |
Transport Employees from Home, Kendal to Bronkspruit |
OLT1223328 |
- |
2020-09-23 23:00 |
Provison for Professional Services Required for Safe Operation of the Ash Dam for a Period of 5 Years at Matla Power Station. |
MPGXC006120R1 |
2020-09-18 10:00 |
2020-09-28 10:00 |
Once off Provision of Dam Safety Evaluation |
MPG006337 |
- |
2020-09-30 10:00 |
The Provision of Horticulture Services for a Period of 36 Months at Camden Power Station. |
MPGXC006348 |
- |
2020-10-28 10:00 |
Design, Manufacture, Supply, Install and Commission of Lifts at Matla Power Station |
MPGXC006341 |
- |
2020-10-20 10:00 |
Transformer Maintenance at Arnot Power Station Over a Period of 36 Months |
MPGXC006333 |
- |
2020-10-19 10:00 |
Co-ordination and Controlling Quality Control / Inspection Activities and Performance of Physical Inspections on Maintenance / Projects and Outage Activities at Matla Power Station for a Period of 5 Years |
MPGXC006340 |
- |
2020-10-20 22:00 |
The Provision of Fire and Emergency Service |
MPGXC006266R1 |
- |
2020-09-28 10:00 |
The Maintenance & Calibration of Coal Mass Meters for a Period of 36 Months at Camden Power Station. |
MPGXC006170R1 |
- |
2020-10-13 10:00 |
Supply and Delivery of 2 X Gearbox: 749251; Epicyclic Vertical Shaft at Camden Power Station |
MPGXC006325 |
- |
2020-10-13 10:00 |
Supply and Delivery of Masks at Majuba Power Station(once Off) |
MPGXC006300 |
- |
2020-09-29 10:00 |
Majuba Soot Blower Maintenance for 3 Years |
MPGXC006344 |
- |
2020-10-27 10:00 |
Supply and Deliver Efp Lube Oil Coolers and Efp Working Oil Coolers for Duvha Power Station. |
MPGXC006339 |
- |
2020-09-15 10:00 |
Request for Proposal : Boiler Auxiliary Steam Valve Line Stopping |
MPGXC006342 |
2020-09-22 13:30 |
2020-10-26 10:00 |
The Supply, Delivery and Dosing of the Cooling Water Chemical to Kriel Power Station for Six Months Period “as and when Required” (re-issue) |
MPGXC006026R1 |
2020-09-15 11:00 |
2020-09-17 10:00 |
Provision of Physical Security Service for Eskom Rotek Industries at Kusile Power Station P20a |
ERI/2020/STR/10 |
2020-09-04 22:15 |
2020-09-28 10:00 |
The Provision of Safe and Reliable Transportation for Generation Kusile Power Station Generation Employees in and Around Emalahleni (witbank), Ogies, Bronkhorstspruit, Delmas, Pretoria, Benoni and Middleburg from Home to Work and from Work to Home for Pe |
MPGXC006312 |
- |
2020-09-23 10:00 |
Kusile Power Station Smoke Stackers (chimneys) Inspection and Repairs During Outages at Kusile Power Station on an “as and when Required” Basis for a Period of 36 Months |
MPGXC006313 |
- |
2020-09-23 10:00 |
Precipitator Mechanical Maintenance During Maintenance Opportunities and Outages on an “as and When” Required Basis |
MPGXC006141R1 |
- |
2020-09-16 10:00 |
Supply and Delivery of 9 Booster Pumps at Majuba Power Station. |
MPGXC006336 |
- |
2020-10-22 10:00 |
The Supply of Nine (9) Servitudes Gates and Installation of One Hundred and Eighty (180) Servitudes Gates in Eleven (11) Lines in the North East Grid and in One (1) Line in the North Grid. |
PSCED0345 |
- |
2020-10-06 10:00 |
The Provision of Pipe Freezing Services at Kriel Power Station on an “as and When” Required Basis for a Period of 5 Years. |
MPGXC006338 |
2020-09-16 13:30 |
2020-09-28 10:00 |
Supply and Delivery of Mobile and Lifting Equipment |
MPPPSC001036R |
- |
2020-10-15 10:00 |
Refurbishment of Pf Burners and Distribution Boxes at Kriel Power Station for 5 Years |
MPGXC006321 |
2020-09-16 10:30 |
2020-10-08 10:00 |
Supply and Delivery of Rack Equipment: Module Chassis B1 Vm 600 |
MPGXC006327 |
- |
2020-10-14 10:00 |
The Provision of On-site Actuators Maintenance, Repairs and Overhaul of All Actuators Including the Supply of a Test Bench on an “as and when Required Basis” at Kriel Power Station for a Period of Five (5) Years |
MPGXC005773R1 |
2020-09-15 10:30 |
2020-10-07 10:00 |
Appointment of a Service Provider/s to Provide Physical Security Services for Four CCMA Offices; Polokwane, Emalahleni, Port Shepstone and Pietermaritzburg |
CCMA/2020/07-SEC |
- |
2020-09-18 11:00 |
Appointment of a Design Consultant to Perform Construction Oversight & Take Design Accountability for Buildings and Services at Kusile Power Station Project |
MPPPSC001172 |
- |
2020-10-14 10:00 |
Provision of SPU Meter Reading Services in Mpumalanga Operating Unit – Emalahleni Zone for 36 Months on and “as and when Required” Basis. |
PTATEN 2556 |
- |
2020-09-29 10:00 |
The Design, Manufacture, Supply, Delivery, Removal, and Installation of 4 (four) Cooling Towers Fills at Kriel Power Station for a Period of 2 Years |
MPGXC006323 |
- |
2020-11-30 10:00 |
Coal Hopper Facility Materials Handling |
MPPPSC001103R |
2020-09-03 09:00 |
2020-09-30 10:00 |
Refurbishment of Seal Air Fans as and when Required for Five Years at Kriel Power Station |
MPGXC006269 |
- |
2020-09-10 10:00 |
Kruispunt Sub-station NLPEF Upgrade in Witbank Customer Load Network |
MPDX001045 |
2020-09-08 10:00 |
2020-09-25 10:00 |
Eskom Grootvlei Power Station Additional Human Resources for Various departments on " as and when" required basis |
MPGXC006294R1 |
- |
2020-09-11 10:00 |
The Provision for Control and Instrumentation Maintenance Units and Outages Services at Kendal Power Station |
MPGXC006309 |
- |
2020-10-12 10:00 |
Ikageng Sewage Treatment Plant Refurbishment for a Period of Eighteen (18) Months at Duvha Power Station |
MPGXC006318 |
- |
2020-10-08 10:00 |
Ikageng Sewage Treatment Plant Refurbishment for a Period of Eighteen (18) Months at Duvha Power Station |
MPGXC006318 |
- |
2020-10-08 10:00 |
The Supply and Delivery of Milling Plant Rotating Parts Spares |
MPGXC006316 |
- |
2020-10-07 10:00 |