| Design, Manufacture, Supply, Delivery,Installation, Commissioning and Testing of Witkop 132 Kv Shunt Capacitor for a Period of Twenty (20) Months |
LP00198AB |
2025-03-19 10:00 |
2025-05-28 10:00 |
| Appointment of a Service Provider for Supply, Delivery, Off-loading and Installation of NER (Neutral Earthing Resistor) |
33-2024/2025 |
- |
2025-03-12 12:00 |
| Supply, Delivery and Installation of Electric Stoves and Appliances at Masebe Nature Reserve |
EDET/QUOTE 0567/2025 |
- |
2025-03-03 11:00 |
| Supply and Delivery of 11kv and 22kv Indoor Transformer Breakers, Feeder Breaker and Battery Charger at Boom Substation |
12 OF 2025 |
- |
2025-03-04 12:00 |
| Appointment of a Service Provider for Ring Main Unit Maintenance |
EPMLM/8/3/510 |
- |
2025-02-27 12:00 |
| Appointment of Four (04) Service Providers to Supply and Deliver Electrical Material for a Period of Three (03) Years. |
PM58-24/25 |
- |
2025-03-12 10:00 |
| Appointment of Three (03) Service Providers to Supply and Deliver Electrical Meters for a Period of Three (03) Years (re-advert) |
PM49 /2023 |
- |
2025-03-07 10:00 |
| Appointment of a Service Provider for Supply, Delivery and Installation of Substation Battery Tripping Units |
30-2024/2025 |
- |
2025-02-24 12:00 |
| Supply and Installation of Solar Power Backup Solutions at the Lephalale and Alkantpan Lightning Detection Network (ldn) Sites. |
RFQ 3610/24 |
2025-02-11 10:00 |
2025-02-18 11:00 |
| Provision of Fluorescent Tube Boxes and Containers, as Well as a Recycling
Facility of Fluorescent Tubes on an “as and When” Required Basis for a Period
Of 60 Months |
ERI/2025/LS/02 |
2025-02-10 10:00 |
2025-02-20 10:00 |
| Manufacture, Supply and Delivery of Guy Wires, Fittings and Assemblies
Nationally on an as and when Required Basis for 36 Months |
ERI/2025/CS/01 |
- |
2025-02-20 10:00 |
| Supply and Delivery of Magnet: Oil Cooled Self-cleaner; Wd 1.2 M At
Matimba Power Station Once off Purchase |
LPMAT00116GX |
2025-02-12 10:00 |
2025-03-04 14:00 |
| Supply, Delivery and Installation of Energy Efficiency and Demand Side Management for Three (3) Years |
08/2024/2025A |
2025-02-07 11:00 |
2025-02-25 11:00 |
| Supply, Delivery and Installation of 11kv and 22kv Outdoor Transformer Breakers at Emmarentia Substation |
47 of 2024 |
- |
2025-02-18 12:00 |
| Supply and Delivery of 100 Kwh Meter |
EPMLM/8/3/508 |
- |
2025-02-06 12:00 |
| Appointment of a Service Provider to Replace a Mini Substation at 338 Mopanie Street |
EPMLM/8/3/504 |
2025-01-29 10:00 |
2025-02-13 12:00 |
| Provision to Supply, Deliver, Install, Commission and Maintain Electric Vehicle Charging Stations for Fleet Electric Vehicle (ev) Pilot Project at Eskom Various Power Stations, Generation Division |
MWP2991GX |
2025-01-24 11:00 |
2025-03-06 10:00 |
| Fosphb-rfp-31-24/25 Request for Proposal for the Design, Manufacture Supply, Installation and Commissioning of the 22kv Swithgear. |
FOSPHB-RFP-31-24/25 |
- |
2025-02-04 12:00 |
| Extension of Closing Date |
- |
- |
2025-01-30 10:00 |
| Fosphb-rfp-30-24/25 Request for Proposal for the Design, Manufacture,supply, Installation and Commissioning of the 22kv Switchgear at the Return Water Pump Station (rwps). |
FOSPHB-RFP-30-24/25 |
- |
2025-02-04 12:00 |
| Erratum for Line and Lighting Materials |
26-2024/2025 |
- |
2025-01-30 12:00 |
| Extension of Closing Date-12102024191656 |
25-2024/2025, 26-2024/2025 |
- |
2025-01-30 12:00 |
| Supply and Delivery of Cables 9-2-172 |
9/2/172 |
- |
2024-12-12 12:00 |
| Bid 26-2024_2025 for Lighting Materials |
26-2024/2025 |
- |
2025-01-07 12:00 |
| Bid 25-2024_2025 for Line Materials |
25-2024/2025 |
- |
2025-01-07 12:00 |
| Appointment of a Service Provider for Supply and Delivery of Three-phase Power Quality Recorders |
SCMU 55/2024 |
- |
2024-12-12 12:00 |
| The Supply of Braced Line Post and Long Rod Insulators to Uchoba Substation Within Limlanga Cluster on a Once-ff Basis. |
LP00189EK |
2024-11-28 14:00 |
2024-12-09 10:00 |
| Terms of Reference for Supplying and Installing the Powerbackup of 5kw Inverter with Battery to Gcis Polokwane Office. |
RFQ 033-2024/2025 |
2024-12-05 13:00 |
2024-12-12 11:00 |
| Supply and Installation of 11kv Switchgear at Polokwane Substation |
TFR/2024/11/0020/83812/RFQ |
2024-11-28 11:00 |
2024-12-05 10:00 |
| Appointment of a Panel of Four (04) Service Providers for Supply, Delivery and Off-loading of Lighting Materials and Accessories for Stores |
26-2024/2025 |
- |
2025-01-30 12:00 |
| Appointment of a Panel of Four (04) Service Providers for Supply, Delivery and Off-loading of Line Materials and Accessories for Stores |
25-2024/2025 |
- |
2025-01-30 12:00 |
| Supply and Delivery of Generator Protection Spares for 5 Years |
LPMED00129GX |
- |
2025-01-28 14:00 |
| Fosphb-rfp-19-24/25 Request for Proposal for the Design, Manufacture,supply, Installation and Commissioning of the 22kv Switchgear at the Return Water Pump Station (rwps). |
FOSPHB-RFP-19-24/25 |
2024-11-20 11:00 |
2024-12-03 12:00 |
| Fosphb-rfp-21-24/25 Request for Proposal for the Design, Supply,install and Commission of Led Lights for Foskor Phalaborwa. |
FOSPHB-RFP-21-24/25 |
- |
2024-12-03 12:00 |
| Fosphb-rfp-20-24/25 Request for Proposal for the Design, Supply,installation and Commissioning of Solar Power System at Moshate Complex for Foskor Phalaborwa. |
FOSPHB-RFP-20-24/25 |
2024-11-21 11:00 |
2024-12-03 12:00 |
| Request for Electrical Equipments (spares) (re-advert) |
RFQ/VDM/CORP/23/08/2024/01 |
2024-11-08 10:00 |
2024-11-14 12:00 |
| Supply and Delivery of Relays and Contactors for a Period of 5 Years at Generation Medupi Power Station. |
LPMED00126GX |
- |
2024-11-21 14:00 |
| The Provision of Lv Variable Frequency Drives, Soft Starters and Thyristor Bank Controller.repair Services for Medupi Power Station for a Period of 60 Months |
LPMED0066GXRR3 |
- |
2024-12-05 14:00 |
| Electrical Contractor to Provide Service for Closing Span and Transformer for Malale Electrification Project |
RFQ 22/2024-2025 |
- |
2024-11-07 11:00 |
| Repairs of Ctm Switch House |
Q30-2024/2025 |
2024-10-22 10:00 |
2024-10-25 12:00 |
| Supply and Installation of Accessories Associated with the Connection of 50kva Transformer at Letaba Ranch Nature Reserve |
EDET/QUOT 0264/2024 |
2024-10-25 11:00 |
2024-11-01 11:00 |
| Supply and Delivery of Transformer 9-2-158 |
9/2/158 |
- |
2024-10-23 12:00 |
| Specification for Supply and Delivery of 35mm Aerial Bundle Conductor |
Q28-2024/2025 |
- |
2024-10-22 12:00 |
| Manufacture And/or Supply of Various Line Hardware Material Required Within
The Limlanga Cluster, on an “as and When” Required Basis, for a Period of 5
Years - Distribution Division |
LP00182HR |
2024-10-24 10:00 |
2024-11-28 10:00 |
| Specification for Supply and Delivery of 70mm Aerial Bundle Conductor |
Q25-2024/2025 |
- |
2024-10-17 12:00 |
| Supply, Delivery and Installation of Energy Efficiency and Demand Side Management for Three (3) Years |
08/2024/2025 |
2024-10-23 11:00 |
2024-11-08 11:00 |
| Supply, Delivery and Installation of Solar Power System at Singo Camp,makuya
Nature Reserve |
EDET/QUOTE 0015/2024 |
2024-10-11 11:00 |
2024-10-21 11:00 |
| Fosphb-rfp-10-24/25 Request for Proposal for the Electrical Infrastructure for the South Pit Relocation Project |
FOSPHB-RFP-10-24/25 |
- |
2024-10-22 12:00 |
| Fosphb-rfp-09-24/25 Request for Proposal for the Design, Manufacture,supply, Installation and Commissioning of the 11kv Switchboard for the Foskor Phalaborwa Main Sub 1 (ms-1) Substation. |
FOSPHB-RFP-09-24/25 |
2024-10-10 11:00 |
2024-10-22 12:00 |
| Construction of 132/11kv 2 X 20mva Bela Bela Substation (phase 1) |
9/3/1/394 |
2024-10-04 10:00 |
2024-11-01 12:00 |