| After Service Repairs |
Cbh137-25-26 |
- |
2025-11-20 11:00 |
| After Service Repairs |
Cbh138-25-26 |
- |
2025-11-20 11:00 |
| Service Compressors and Air Dryers |
HOH0316-25-26 |
2025-11-18 10:00 |
2025-11-24 11:00 |
| Supply and Install Left Hand Panel Multisurge Regulator of Medical Oxygen Bank |
DGW175-26. |
2025-11-18 11:00 |
2025-11-25 11:00 |
| Rfq-pump3 Installation and Pipe Work at Esikhawini Wtw-by 18 November 2025 |
7000015684– (SC10100743) |
- |
2025-11-18 12:00 |
| Service and Repairs of Hvac
Equipment for Butterworth Magistrate Court for A
Duration of 4 Months |
MTHQ224/25 |
- |
2025-11-20 11:00 |
| Service and Repairs of Hvac
Equipment for Mthatha High Court for a Duration of 4
Months |
MTHQ223/25 |
- |
2025-11-20 11:00 |
| Service and Repairs of Hvac
Equipment for Dordrecht Magistrate for a Duration of 4
Months |
MTHQ220/25 |
- |
2025-11-20 11:00 |
| Service and Repairs of Hvac
Equipment for Lusikisiki Saps & Magistrate Court for A
Duration of 4 Months |
MTHQ215/25 |
- |
2025-11-20 11:00 |
| Provision of Tube Manipulation/bending for Planned and Unplanned Outages for a 5 Year Period at Kusile Power Station |
E2180GXMPKUS |
- |
2025-12-09 10:00 |
| Appointment of a Contractor for Wet Services: Mechanical and Plumbing Works to Existing 1st Floor Offices at the 29 South Building in Support Zone 1 for Dube Tradeport |
RFQ46/DPI/2025 |
2025-11-21 13:00 |
2025-12-02 15:00 |
| Servicing and Repair High Prssure Washer Machines at Dundee Ems Bases, Nquthu Ems Base, Umvoti /greytown Ems Base and Msinga Ems Base |
UMZ 290-2025-26 |
- |
2025-11-18 11:00 |
| Major Service of Air-conditioners |
OTH-132-25-26 |
- |
2025-11-18 11:00 |
| Repair to Borehole,redirect Water and Electrical Cable Supply |
VRH-365-25-26 |
2025-11-17 11:30 |
2025-11-20 11:00 |
| Major Service to Water Cooled Chillers X 3 Units |
NEH-385-25-26 |
2025-11-18 11:00 |
2025-11-21 11:00 |
| Supply and Install Plant Room One Extraction Fan and Attenuators and Plant Room Three Attenuators. |
LD 794 |
2025-11-20 09:00 |
2025-11-25 11:00 |
| Doj: Port Shepstone Magistrate Court:repairs to Main Gate Electrical Motor Which is Faulty |
DBNQ/ID-3231147 |
- |
2025-11-26 11:00 |
| Rfq Supply, Deliver and Commissioning of Two (2) Foam/ Water Monitors |
SANPC/157/09/2025 |
2025-11-13 11:00 |
2025-11-21 16:00 |
| Repairs to Aerator at Brenton Wastewater Treatment Works: Closing Date: 28 November 2025 |
RFQ 144/2025/26 |
2025-11-21 09:00 |
2025-11-28 12:00 |
| Appointment of a Suitable Cidb Grade 2me or Higher Qualified and Experienced Hvac Service Providers to Submit Quotations for the Inspection, Diagnosis, Repair and 12 Months Maintenance of an Lg Multi V 5 Heat Pump (50/60hz, R410a) Installed at Didacta Building in Pretoria Central. |
RFQ/SAEON/HEADOFFICE/REPAIR OF AIRCONS/140/2025 |
2025-11-21 11:00 |
2025-11-28 11:00 |
| Free State: Saps: Repair and Maintenance of Lcrc in Bloemfontein, Phuthaditjhaba, Bethlehem, Thaba Nchu, Welkom, Sasolburg |
Q25/062 |
- |
2025-11-26 11:00 |
| Riverton Wtw Refurbishment of the Raw Water Abstraction Works and Pipeline |
BFI01/25/MWTWSC3 |
2025-11-24 14:00 |
2026-02-20 10:00 |
| Free State: Saps: Repair and Maintenance of LCRC in Bloemfontein, Phuthaditjhaba, Bethlehem, Thaba Nchu, Welkom, Sasol Burg |
Q25/062 |
- |
2025-11-26 11:00 |
| Bfi01/25/mwtwsc3 - Riverton Wtw Refurbishment of the Raw Water Abstraction Works and Pipeline |
BFI01/25/MWTWSC3 |
2025-11-24 14:00 |
2025-12-15 10:00 |
| Mechanical housing rotating machinery mo |
GE12600287 |
- |
2025-11-14 16:00 |
| Upgrade and Refurbishment of 4 X Buildings for Paraplegic Access & Provision of 4 X Paraplegic Lifts in the Port of Durban for a Period of Eleven (11) Months. |
TNPA/2025/05/0005/94989/RFP |
2025-11-19 10:00 |
2025-12-12 10:00 |
| Supply and Install Split, Under Ceiling and Shift One Fan Coil Unit for Air Conditioning. |
LD 792 |
2025-11-19 09:00 |
2025-11-21 11:00 |
| Service of Waste Discharge Units Stations Equipments and Maintanance. |
LD 793 |
2025-11-19 10:00 |
2025-11-21 11:00 |
| Repairs of Ixopo Clinic Generator |
ctk116-2025-26 |
- |
2025-11-18 11:00 |
| After Service Repair for Central Airconditioner (hvac) |
HLB 130 25-26 |
- |
2025-11-19 11:00 |
| After Service Repair for Aircondition at Nkundusi Clinic |
HLB 131 25-26 |
- |
2025-11-19 11:00 |
| After Service Repair for Ventilation |
HLB 128 25-26 |
- |
2025-11-19 11:00 |
| Supply, Install, Replace, Commision of Heat Pumps at Qnrh |
QNR535.25.26 |
2025-11-19 10:00 |
2025-11-27 11:00 |
| Servicing and Repairs of Atlas Filter Units at Ushaka Marine World. |
LD 789 |
2025-11-17 10:00 |
2025-11-19 11:00 |
| Supply and Install Condensor for Dolphin Freezer Room. |
LD 790 |
2025-11-18 09:00 |
2025-11-20 11:00 |
| Bityi Magistrate Office â Service
and Repair of Hvac Equipment for Period of 04 Months |
MTHQ259/25 |
- |
2025-11-18 11:00 |
| Change Hollow Shaft Coupling Configuration Project for a Period of Six (06) Months at Matimba Power Station |
E2036GXMPMAT |
2025-11-05 10:00 |
2025-11-27 10:00 |
| Day to Day Emergency Repair Within the Region of Bloemfontein Regional Works Unit Free State |
DWF/CIDB REF/116/2025/2026/FS |
2025-11-24 10:00 |
2025-12-01 11:00 |
| Service to Medical Gas Plants and Outlets Oxygen, Nitrous, Med Air and Vacuum |
KEV594-25 |
2025-11-13 11:00 |
2025-11-17 11:00 |
| Supply Labour and Sabs Approved Materials to Do Major Service on 31 Air-con |
dgw172-26 |
- |
2025-11-17 11:00 |
| Reguest for Quotation from Service Providers with Cidb Grading of 1si or 1me or Higher to Repair Three(3) Lifts at Metro Centre, Braamfonatin |
RFQ96/2026FY/JPC |
2025-11-19 10:00 |
2025-11-26 10:30 |
| Refurbishment of Passengers Loading Bridges for a Period of 24 Months at O.r. Tambo International Airport |
ORTIA7993/2025/RFP |
- |
2026-02-09 11:00 |
| Reguest for Quotation from Service Providers with Cidb Grading of 1si or 1me or Higher to Repair Three(3) Lifts at Metro Centre, Braamfonatin |
RFQ78/2026FY/JPC |
2025-11-19 10:00 |
2025-11-26 10:30 |
| The Appointment of a Construction Professional Services Provider Multi Disciplinary Team with the Architect as Principal Agent /leader of the Bidding Entity for Design, Construction and Close Out of the Project (stage 1-7 of Fidpm). Manguzi Hospital Psp Contract Period is Seventy Nine (79) Calendar Months |
ZNTU04266W |
- |
2025-12-11 11:00 |
| The Appointment of a Construction Professional Service Provider Multi Disciplinary Team with the Architect as Principal Agent Leader of the Bidding Entity for Design, Construction and Close Out of the Project (stage 1-7 Fidpm) : Benedictine District Hospital |
ZNTU04252W |
- |
2025-12-11 11:00 |
| Major Service to Mseleni Hospital Hvac at Theatre ,female, Therapy |
MSH261-25-26H |
- |
2025-11-13 11:00 |
| Urgent Repairs to Heat Pump |
KEV597-25 |
2025-11-12 11:00 |
2025-11-17 11:00 |
| Reguest for Quotation from Service Providers with Cidb Grading of 1si or 1me or Higher to Repair Three(3) Lifts at Metro Centre, Braamfonatin |
RFQ78/2026FY/JPC |
2025-11-19 10:00 |
2025-11-26 10:30 |
| Kroonstad Prison: Various Steam Leaks on the Lines as Well as Leaks Inside the Kitchen. Steam Leaks on the Equipment as Well |
ID-3197363 |
- |
2025-11-13 11:00 |
| Maintenance, Calibration and Spares Supply of Inlet and Outlet Oxygen Analysers on Boiler Gas Air Heater for Medupi Power Station as in when is Required for Five (5) Years |
E1775LPMEDR |
2025-11-18 11:00 |
2025-12-04 10:00 |