Specifications for Procurement of Emissions Monitoring Equipment |
BPDM/HES/MONITORING EQUIPMENT/15/2021/22 |
- |
2022-02-28 11:00 |
Supply and Delivery of Esp Spares for Stock Replenishment |
MWP1152GX |
- |
2022-03-09 10:00 |
Tender for the Supply of Parts, Spares and Repairs of Air Quality Ambient Analysers for the Eskom Air Quality Monitoring Network and Continuous Emission Monitoring on an “as and when Required’’ for a Period of 36 Months |
MWP1131CX |
- |
2022-03-04 10:00 |
Sootblower Maintenance Services, Inspections and Repairs During Normal Maintenance and Outages at Tutuka Power for a Period of 5 Years |
MPTUTJ10097GX |
- |
2022-03-23 10:00 |
The Supply, Delivery and Installation of In-situ Object Counting System, Continuous Air Monitor with Remote Head, Floor Monitor and Turbo Units for the Steam Generator Replacement Project. |
KBG2115R |
- |
2022-02-10 10:00 |
Provision of Soot Blower System Maintenance for Outages and Routine Maintenance |
LPMED0003GX |
2022-02-03 10:00 |
2022-02-17 14:00 |
Fugitive Emission Monitoring at Majuba Power Station for a Period of Five (5) Years. |
MPGXC006159R1 |
- |
2022-02-07 10:00 |
Refurbishment, Supply and Delivery of Electro Precipitator Hammers at Duvha Power Station |
MPDUV10059GX |
- |
2022-02-22 10:00 |
Provision of Operating Resources for Mill Reject Box Cleaning, Ashing and Dusting and Coaling on Unit 1 – 6 for the Period of 60 Months at Matla Power Station. |
MPMAT10070GX |
2022-02-03 10:00 |
2022-03-02 10:00 |
The Provision Ash Handling Plant Maintenance at Tutuka Power Station for a Period of 6 Months |
MPTUT10046GX |
- |
2022-01-15 10:00 |
Detail Design, Engineering, Procurement, Manufacture, and Installation of the Dust Handling Plant Dhp, Hopper Aeration Systems, Conditioning Plant and Associated System Including but Not Limited to Electrical, C&i, Mechanical and Civil Structures on Two (2) Units and Ash Conditioning Common Plant at Tutuka Power Station |
MWP1079PS |
2022-01-25 10:00 |
2022-02-23 10:00 |
Refurbishment of the Electrostatic Precipitators (ESP) Project for Two Units at Tutuka Power Station. |
MWP1067PS |
2022-01-17 10:00 |
2022-02-10 10:00 |
Tender for the Supply, Operation, Reporting and Maintenance of an Air Quality Monitoring System for the City of Tshwane: Three-year Period, Renewable Annually Based on Performance |
EAM 09-2021-22 |
2021-12-09 10:00 |
2022-01-26 10:00 |
Lethabo Mechanical Maintenance for Ash Plant for a Period of Five (5) Years. |
GEN3415 |
- |
2021-12-01 10:00 |
Kendal Power Station Continuous Ash Disposal Facility (ADF) Project Scope of Work for Dust and Noise Monitoring |
MPPPSC001227 |
- |
2021-12-13 10:00 |
The Provision of Dust Handling Plant Maintenance Services as and when Required for a Period of 36 Months at Various Sites |
ERI/2021/BMS/17 |
2021-11-24 11:00 |
2021-12-10 10:00 |
Design, Supply, Fabrication, Installation, Commissioning and Testing of the Dust Suppression System Complete System |
MPGXC006885 |
2021-11-16 10:00 |
2021-11-29 10:00 |
Supply and Delivery of Filter Air:pre Bag;sq 592 X Wd 200 Mm to Ankerlig Power Station and Gourikwa Power Station, Respectively |
OLT1286094 |
- |
2021-11-22 17:00 |
Provision of Dust Handling Plant Inspections and Repairs During Outages at Kusile Power Station for Period of Five (05) Years. |
MPGXC006868 |
- |
2021-12-02 11:00 |
Fabric Filter Plant Online Maintenance at Hendrina Power Station |
MPGXC006849 |
- |
2021-11-23 11:00 |
To Establish a Contract with Various Suppliers for the Provision of Multi-disciplinary Services, for Dhp Unit 1 Maintenance and Ash Silo 3 Construction, at Medupi Power Station on an as and when Required Bases, for a Period of 12 Months (using Reverse E-auction Process). |
ERI/2021/BMS/15 |
- |
2021-11-08 10:00 |
Provision of a Full Mechanical Maintenance Service for Duvha Power Station Units 1, 2 and 3 Fabric Filter Plant for a Period of 5 Years |
MPGXC006851 |
- |
2021-11-16 10:00 |
Provision of Services for PM Correlations and Gaseous Parallel Tests for Units 1 to 6 at Kendal Power Station |
MPGXC006840 |
- |
2021-11-10 10:00 |
Re-advertised Formal Quotation: Rfq 01/06/2021 Request for Quotation for the Supply of One (1) Portable Continuous Ambient Air Quality Monitoring Analyzer (a Single Instrument Measuring NOx, SO3, CO, CO2, H2S, PM10, PM2.5, and O3 with Standard Meteorological Parameters (Temperature, Humidity). |
RE-ADVERTISED FORMAL QUOTATION: RFQ 01/06/2021 |
- |
2021-10-29 12:00 |
Ash and Dust Plant High Pressure Cleaning Service During Unit 4 Outage at Duvha Power Station. |
MPGXC006834 |
- |
2021-10-18 10:00 |
The Supply and Delivery of Greenhouse Gas Emissions Equipment |
ARC/08/09/2021 |
- |
2021-11-08 11:00 |
Provision of Maintenance on Dust Handling Plant And
Precipitators at Matimba Power Station for a Period of Twelve
(12) Months |
MAT00478 |
2021-10-18 11:00 |
2021-10-27 14:00 |
Fugitive Dust Monitoring at Lethabo Power Station for the Period of 3 Years |
GEN3404 |
2021-10-18 11:30 |
2021-11-09 10:00 |
Air Emission Testing Services |
JCPZ/CEM01/2021 |
2021-09-27 11:00 |
2021-10-22 12:00 |
Maintenance Services of the Precipitators for Units 1 to 6 at Matla Power
Station for the Period of 5 Years (excluding Outages) |
MPGXC006794 |
2021-09-13 10:00 |
2021-10-06 10:00 |
Appointment of a Service Provider for the Preparation and Development of Air Quality Management Plan |
ZNT 03 EDTEA 21/22 |
- |
2021-09-09 11:00 |
Air Emission Testing Services |
JCPZ/RM03/2020 |
2021-05-27 10:00 |
2021-06-18 12:00 |
Provision of Continuous Emission and Monitoring System Calibration at Medupi Power Station |
MED00201GX |
- |
2021-03-23 14:00 |
The Manufacture and Supply of Cages for Unit 2 Fabric Filter Plant |
MPGXC006542 |
- |
2021-04-06 10:00 |
Manufacture, Assemble, Supply, Delivery and Off-loading of Various Flue Gas Cleaning Plants Spares on as and when Required Basis During a Period of Five (5) Years. |
GEN3347 |
- |
2021-02-12 10:00 |
Supply and Delivery of Soot Blower Spares to Kriel Power Station on an “as and When” Required for the Period of 5 Years |
MPGXC006505 |
2021-01-28 08:00 |
2021-02-22 10:00 |
Pulse Jet Fabric Filter Plant (pjff) Inspection, Repairs and Bags |
MPGXC006460 |
- |
2021-01-26 10:00 |
Supply and Delivery Pulse Jet Fabric Filter Plant (pjffp) Blow Tube Spares During the Planned Outages, Unplanned Outages |
MPGXC006463 |
- |
2021-02-01 10:00 |
Supply and Delivery Pulse Jet Fabric Filter Plant (pjffp) Cages Spares During the Planned Outages, Unplanned Outages |
MPGXC006462 |
- |
2021-01-28 10:00 |
Design, Manufacturing, Supply, Delivery, Off-loading, Installation and Commissioning of Electrostatic Precipitator (esp), Sulphur Trioxide (so3) Plant and Dust Handling Plant (dhp) Compressors on Units 1 to 6 at Kriel Power Station |
MPPPSC001186 |
2021-02-02 10:00 |
2021-03-02 10:00 |
Various Flue Gas Cleaning Plants Spares on as and when Required Basis |
MPGCX006458 |
- |
2021-02-10 10:00 |
Dust Handling During Unit 3 & 4 Unplanned Outages at Kendal Power Station |
MPGXC006478 |
- |
2020-12-15 10:00 |
Inspections and Services on So3 Plant During Unit 5,6, 3 and 4 at Kendal Power Station (once Off) |
MPGXC006476 |
- |
2020-12-15 10:00 |
Inspection and Services on SO3 Plant During Unit 5,6,3 &4 at Kendal Power Station |
MPGXC006476 |
- |
2020-12-15 10:00 |
The Provision of Dust Handling Plant During Unit 3 & 4 Unplanned Outages at Kendal Power Station |
MPGXC006478 |
- |
2020-12-15 10:00 |
The Complete Inspection, Supply of Spares and Refurbishment of All the Chain and Coarse Ash Conveyors Including the Degrit Sumps on Unit 5 and 6 Dust Handling Plant (dhp) Kendal Power Station |
MPGXC006449 |
2020-11-26 11:00 |
2020-12-14 10:00 |
The Refurbishment of Unit 4 Electrostatic Precipitator at Matla Power Station |
MPGXC006303R1 |
- |
2020-12-11 10:00 |
The Procurement, Design, Manufacturing, Shipping, Transportation, Decommissioning, Installation, Commissioning, Documentation and Handover of Unit 1 to 6 SO3 Plants at Lethabo. |
PSCED0369 |
2020-11-23 10:00 |
2021-02-16 10:00 |
Majuba Continuous Ash Disposal Facility Project - Mechanical, Electrical and C&i Package 3 |
MPPPSC001139R1 |
2020-11-23 10:30 |
2021-01-21 10:00 |
Manufacture, Supply and Installation of ESP G-spring Discharge 316 Ss Wire Electrode in U3 ESP Casings During U3go Outage |
GEN3342 |
- |
2020-11-06 10:00 |