| Supply, Delivery, Installation and Commissioning of Chlorine Tablets Dosing Equipment and Supply and Delivery of Chlorine Tablets at Various City of Cape Town Facilities |
35G/2022/23 |
2022-07-29 10:00 |
2022-08-25 10:00 |
| The Appointment of a Panel of Service Providers for Mechanical Maintenance which Include the Supply and Repair of the Sedimentation Tanks and Settling Tank Valves, Stop Logs, Screens and Buoyancy Gates at Magalies Water Areas of Operations for the Period of Three(3) Years |
RFB/MW/252/2021-22 |
2022-07-08 12:00 |
2022-07-22 12:00 |
| Supply and Delivery of Polyelectrolytes for use in Drinking Water Treatment for Flocculation and Water Treatment Residue Centrifugation |
379G/2021/22 |
2022-07-01 10:00 |
2022-07-19 10:00 |
| Provision of Professional Services, Technical Support and Implementation in Respect of the Design and Construction Monitoring of Treated Effluent Infrastructure and other Alternative Water Sources Infrastructure |
370C/2021/22 |
2022-06-23 10:00 |
2022-07-13 10:00 |
| Sampling and Testing of Potable and Waste Water Samples in the Drakenstein Municipal Area from 01 July 2022 until 30 June 2024 |
CES 01/2022 |
2022-02-23 00:00 |
2022-03-03 10:00 |
| Establishment of Panel of Suppliers for the Supply and Delivery of Water and Sewer Stores Related Material Over a 3 Year Period |
SCM/19/2022 |
2022-02-18 10:00 |
2022-03-14 12:00 |
| Water Purification Chemicals (Panel of Two(2) Duration of Three(3) Years) |
9/3/1/335 |
- |
2022-03-04 12:00 |
| Panel of 20 for Supply, Delivery and Offloading of Water Treatment Chemicals (Panel for 36 Months) |
LIM74/1/163 |
- |
2022-02-22 11:00 |
| Supply and Install Chip Dosers Wastewater Treatment |
VDM/TECH/10/03/2021/01 |
2022-02-03 10:30 |
2022-02-18 12:00 |
| Sandfontein Water Supply |
027/MKLM/2021/2022 |
2021-12-06 12:00 |
2022-01-10 10:00 |
| Lossmytjerie/Goedehoop Water Supply |
026/MKLM/2021/2022 |
2021-12-06 12:00 |
2021-12-20 10:00 |
| Supply and Delivery of Flucculants for Water Purification |
INFRA/CE/T7/2021 |
- |
2022-01-31 10:00 |
| Supply and Delivery of Chemicals for Water Purification |
INFRA/CE/T6/2021 |
- |
2022-01-31 10:00 |
| Tender are Hereby Invited for the Chlorine Off-Gas Handling at the Old Water Treatment Works and New Water Treatment Works- Multi Year Project |
T/ING/016/2021 |
2021-11-29 10:00 |
2022-01-19 12:00 |
| Supply, Delivery and Off-Loading of Hydrate Lime for use in Water Treatment |
157G/2021/22 |
2021-11-26 10:00 |
2022-01-19 10:00 |
| The Supply, Delivery , Installation and Commissioning of Mechanical Inlet Screens at the Paarl Wastewater Treatment Works |
CES 15/2021 |
2021-11-25 11:00 |
2022-01-15 10:00 |
| Maologane Water Supply |
020/MKLM/2021/2022 |
2021-11-05 10:00 |
2021-11-17 10:00 |
| Supply and Deliver Wastewater Treatment Chemicals |
118G/2021/22 |
- |
2021-12-01 10:00 |
| The Appointment of a Service Provider for the Supply, Delivery, Installation, Commissioning of Two(2) De-Ionised and Reverse Osmosis (Type 2) Water System for the Laboratory |
ERW202107/TNDR-002 |
2021-11-11 09:30 |
2021-12-03 12:00 |
| Tender for the Supply, Delivery and Offloading of White Hydrated Lime for Various Waste Water Treatment Works and Water Purification Works of the City of Tshwane: Three-Year Period, as and when Required |
USD WS 11-2021/22 |
- |
2021-12-06 10:00 |
| Tender for the Supply, Delivery and Offloading of Cationic Polyelectrolyte Blends and Polyacrylamides for Potable Water Purification and Sewage Sludge Conditioning Respectively at Various Water and Waste Water Treatment Works of the City of Tshwane: Three-Year Period, as and when Required |
USD WS 07-2021/22 |
- |
2021-12-03 10:00 |
| Tenders are Invited for: Skeyfontein 3: Rural Water Supply Project: Phase 2: Water Reticulation |
TM 012/2021/2022 |
2021-10-14 10:00 |
2021-10-29 12:00 |
| Water Conservation and Water Demand Management Support Programme for the Period of 12 Months |
2021/124 |
2021-10-22 10:00 |
2021-11-18 12:00 |
| Supply, Delivery and Offload of Polymeric Coagulants to King Cetshwayo District Municipality Water Treatment Plants for the Period of Five Years |
2022/001 |
- |
2021-11-11 12:00 |
| Appointment of Contractors for Operation and Maintenance of Water and Sewer Pump Stations, Reservoir and Towers as well as all Associated Components within the South-West and North-East Districts of the City of Ekurhuleni on an as and when Required Basis from Date of Appointment to 30 June 2024 |
A-WS 06-2021 |
- |
2021-11-15 10:00 |
| Water Upgrade Phase 2 at Univen (Including Installation of Tanks per Student Residence) |
IN/022/2021 |
2021-09-29 11:00 |
2021-10-21 12:00 |
| Erratum- Tweelagte Water Supply Phase 2 |
011/MKLM/2021/2022 |
- |
2021-10-01 10:00 |
| Supply, Install, Repairs, Upgrade, Maintenance for all instrument Infrastructures, Telemetry and Operating Systems, Which Includes Water/Sewer Treatment Plants, Reservoirs, Pump Stations and Substations for the Period of Three Years |
8/2/1/UMH706-20/21 |
2021-09-28 10:00 |
2021-10-27 12:00 |
| Supply of Membrane Modules to Fit into the Existing Zeeweed 500 D Cassettes Being Used at the Malmesbury Wastewater Treatment Works (WWTW) |
T21/21/22 |
- |
2021-10-01 12:00 |
| Supply, Delivery, Installation and Maintenance of Water Dispensing Devices with Supporting Software, Citywide |
46S/2021/22 |
2021-09-28 11:00 |
2021-10-11 10:00 |
| Panel of Suppliers for Provision of Water Tanker Services for Mopani District Municipality for a Period of 36 Months |
MDM 2021/22-013 |
- |
2021-09-27 12:00 |
| Supply and Delivery for Water and Wastewater Laboratory Portable/Field Scientific Equipments as and when Required for Period of Three(3) Years |
NMMDM 19/20/03 PWBS |
- |
2021-09-13 11:00 |
| Rietvlei Water Supply |
NMMDM 20/21/23 PMU |
2021-09-07 10:00 |
2021-09-27 11:00 |
| Water Supply at Matloding |
NMMDM 20/21/01 PMU |
2021-09-09 11:00 |
2021-09-27 11:00 |
| Installation of new Scrubber Units for Various Plants of Umgeni Water |
2021/117 |
- |
2021-09-30 12:00 |
| Professional Services for the Upgrading of the Carolina Water Treatment Plant to 6ML/D: Phase 4B |
ALMP04/2021 |
- |
2021-09-23 12:00 |
| Design, Supply, Delivery, Installation, Commissioning and Putting into Service a New Liquid Chlorine Withdrawal System to Replace the Existing Gaseous Chlorine Dosing System at Magalies Water's Vaalkop Chlorine Plant |
RFB/MW/217/2021-22 |
2021-08-31 10:00 |
2021-09-09 12:00 |
| Ixopo Wastewater Works Rehabilitation of Disinfection System |
2021/089 |
2021-08-30 11:00 |
2021-09-09 12:00 |
| Erratum- Transportation and Delivery of Potable Water on an as and when Required Basis for a Period of 36 Months |
JW OPS 003/21 |
- |
2021-08-23 10:30 |
| Installation of Stilling Wells in Clarifiers 1 and 2 at Ixopo Water Works and the Construction of a Sludge Pipe form Ixopo Water Works to Ixopo Wastewater Works |
2021/110 |
2021-08-25 11:00 |
2021-09-23 12:00 |
| Appointment of a Service Provider to Perform Water Services Function Take Over From Local Municipalities |
MDM 2021/22-007 |
- |
2021-09-13 12:00 |
| Erratum- Northern Wastewater Treatment Works (NWWTW): Expansion of Capacity Unit 5-Phase 2 (Civil) |
JW 13896 RR |
- |
2021-09-03 10:30 |
| Upgrading of Riverlands/Chatsworth Water Supply System |
T64/20/21 |
2021-08-24 10:00 |
2021-09-03 12:00 |
| Supply and Installation of Chlorine Dioxide Generator and the Supply of Precursor Chemicals for Wallmansthal WTW for a Period of Five(5) Years |
RFB/MW/220/2021-22 |
2021-08-23 11:00 |
2021-09-02 12:00 |
| Supply, Delivery, Installation, Commissioning and Setup of a SBSE and SPME Sample Introduction System on an Existing GC-MS System for Trace Analyses of Organics in Drinking, Raw, Waste, Saline, Boiler and Soil/Sludge |
RFB/MW/219/2021-22 |
2021-08-24 11:00 |
2021-09-01 12:00 |
| A New Liquid Chlorine Withdrawal System at Vaalkop Chlorine Plant |
RFB/MW/217/2021-22 |
2021-08-18 11:00 |
2021-09-03 12:00 |
| Appointment of a Contractor for the Installation of Internal Water and Sewer at Meloding Unit 3 and 7 in Virginia, Free State |
HDA/FS/2021/003 |
- |
2021-08-31 11:00 |
| Refurbishment and Automation of the Bela-Bela Waste Water Treatment Works (WWTW)- Phase 1B |
8/3/1/326 |
- |
2021-09-06 12:00 |
| Procurement of a Service Provider for Refurbishment of Wastewater Treatment Technology at Botleng Wastewater Treatment Works at VKLM |
T/TECH/03/08/2021/2022 |
- |
2021-08-23 10:00 |
| Transportation and Delivery of Potable Water on an as and when Required Basis for a Period of 36 Months |
JW OPS 003/21 |
- |
2021-08-22 10:30 |