Upgrade of a 100 Ton Lever Type Static Weighbridge to a 120 Ton Digital System at Postmasburg for a Period of Two Months
- Tenderers Are Required to Ensure That Electronic Bid Submissions Are Done at Least a Day Before the Closing Date to Prevent Issues Which They May Encounter Due to Their Internet Speed, Bandwidth or the Size of the Number of Uploads They Are Submitting. Transnet Will Not Be Held Liable for Any Challenges Experienced by Bidders as a Result of the Technical Challenges. Please Do Not Wait for the Last Hour to Submit. a Tenderer Can Upload 30mb Per Upload and Multiple Uploads Are Permitted |
WRAC-KBC-37069 |
2023-07-06 09:00 |
2023-07-14 11:00 |
Upgrade of a 100 Ton Lever Type Static Weighbridge to a 120 Ton Digital System at Postmasburg for a Period of Two Months
Tenderers Are Required to Ensure That Electronic Bid Submissions Are Done at Least a Day Before the Closing Date to Prevent Issues Which They May Encounter Due to Their Internet Speed, Bandwidth or the Size of the Number of Uploads They Are Submitting. Transnet Will Not Be Held Liable for Any Challenges Experienced by Bidders as a Result of the Technical Challenges. Please Do Not Wait for the Last Hour to Submit. a Tenderer Can Upload 30mb Per Upload and Multiple Uploads Are Permitted |
TFR/2023/06/0002/34204/RFQ |
2023-07-06 09:00 |
2023-07-14 11:00 |
For the Upgrade of a 100 Ton Lever Type Static Weighbridge to a 120 Ton Digital System at Postmasburg for a Period of Two Months |
WRAC-KBC-37069 |
2023-07-06 09:00 |
2023-07-14 11:00 |
Bid Document: Design, Construction, Supply, Delivery, Installation, Configuring, Testing, Commissioning and Verification of a Completely Static Landfill Weighbridge with Site Office and Intake Pit |
MATAT/2022/20223-132 |
- |
2023-06-30 10:00 |
Design, Construction, Supply, Delivery, Installion, Configuring, Testing, Commissioning, Verification of a Completely Static Landfill Weighbridge with Site Office and Intake Pit |
MATAT/2022/2023-00132 |
- |
2023-06-30 10:00 |
Design, Construction, Supply, Delivery, Installion, Configuring, Testing, Commissioning, Verification of a Completely Static Landfill Weighbridge with Site Office and Intake Pit |
MATAT/2022/2023-00132 |
- |
2023-06-30 11:00 |
Servicing and Maintenance of Weighbridges for Dsw. |
WS.7077 |
2023-06-09 11:00 |
2023-07-07 11:00 |
C1236.16: Swellendam Weighbridge Services |
S020/23 |
2023-06-14 09:00 |
2023-07-04 11:00 |
C1236.15: Rawsonville Weighbridge Services |
S019/23 |
2023-06-14 13:30 |
2023-07-04 11:00 |
C1236.14: Joostenbergvlakte Weighbridge Services |
S018/23 |
2023-06-12 12:00 |
2023-07-04 11:00 |
C1236.13: Vissershok Weighbridge Services |
S017/23 |
2023-06-12 09:00 |
2023-07-04 11:00 |
C2136.12: Moorreesburg Weighbridge Services |
S016/23 |
2023-06-13 13:30 |
2023-07-04 11:00 |
C1236.11: Klawer Weighbridge Services |
S015/23 |
2023-06-13 09:00 |
2023-07-04 11:00 |
C1236.10: Somerset West Weighbridge Services |
S014/23 |
2023-06-08 09:00 |
2023-07-04 11:00 |
C1236.09: Beaufort West Weighbridge Services |
S013/23 |
2023-06-15 11:00 |
2023-07-04 11:00 |
Servicing and Maintenance of Weighbridges for Dsw |
WS-7077 |
2023-06-09 11:00 |
2023-07-07 11:00 |
Rfq Pik061-2022-23 Appointment of Service Provider for Weighbridge Software Support, Hardware Repairs and Maintenance for Six (06) Months |
PIK 061-2022-23 |
- |
202306-08 10:00 |
Upgrading of Umjindi Solid Waste Disposal Site and Ancillary Services |
COM44/2023 |
2023-06-09 12:00 |
2023-07-05 11:00 |
Servicing and Maintenance of Weighbridges for Dsw
2023 |
WS-7077 |
- |
2023-07-07 11:00 |
Provision of Maintenance Service for Weighbridges at Port of Richards Bay for the Duration of Twenty Four (24) Months |
TPT/2023/05/0058/30865/RFQ |
2023-06-01 10:00 |
2023-06-12 12:00 |
Calibration of Cattle Scale at Vryburg 1x1 Ea
Model: Camry Dial Scale (hang Scale)
Range and Resolution: 100kg X 50g
Calibration of Cattle Scale at Vryburg 1x1 Ea
Model: Camry Dial Scale
Range and Resolution: 3000kg X 1
Documents and Pictures Attached. |
RFQ-053963 |
- |
2023-06-01 10:00 |
Pik 060- Service Provider for the Weighbridge Software Support, Hardware Repairs and Maintenance for a Period of Thirty-six (36 Months) |
PIK 060/2022-23 |
- |
2023-05-29 11:00 |
For the Supply & Installation Static Rail Weighbridge to Transnet Soc Ltd (reg.no.1990/000900/30) Operating as Transnet Port Terminals Herein After Referred to as “tpt” at the Bulk Terminal of Saldanha, as a Once off Supplyport Terminals Hereinafter Referred to as “tpt” |
TPT/2022/09/1103/12750/RFP |
2023-05-26 10:00 |
2023-06-09 12:00 |
For the Supply & Installation of Static Rail Weighbridge to Transnet Soc Ltd (reg.no.1990/000900/30) Operating as Transnet Port Terminals Hereinafter Referred to as “tpt” at the Bulk Terminal of Saldanha |
TPT/2022/09/1103/12750/RFP |
2023-05-26 10:00 |
2023-06-09 12:00 |
Repairs and Maintenance at Shedwell Weighbridge
A Supplier is Required to Repair and Maintain Shedwell Weighbridge
A Scope is Attached; for More Info Contact Lunga Luthuli 031 361 3145 or 0605798449 |
TPT/2023/04/0026/27690/RFQ |
- |
2023-05-05 12:00 |
Operations and Maintenance of Tekwane West Central Waste Disposal Site Weighbridge for City of Mbombela for a Period of 36 Months |
COM36-2023 |
- |
2023-04-25 11:00 |
B/sm: 63/23 Provision of Waste Management Software and Maintenance of Weighbridges for the Stellenbosch Municipality from 01 July 2023 until 30 June 2026. |
BSM 63/23 |
2023-03-30 12:00 |
2023-04-17 12:00 |
For the Provision of Repairing and Painting Weigh Bridge for Transnet Soc Ltd (reg. No. 1990/000900/30) Operating as Transnet Port Terminals (hereinafter Referred to as “tpt”) at the Port of Richards Bay. |
TPT/2023/02/0028/21844/RFQ |
2023-02-13 09:00 |
2023-02-17 12:00 |
For the Provision of Repairing and Painting Weigh Bridge for Transnet Soc Ltd (reg. No. 1990/000900/30) Operating as Transnet Port Terminals (hereinafter Referred to as “tpt”) at the Port of Richards Bay. |
TPT/2023/02/0026/21629/RFQ |
2023-02-08 00:00 |
2023-02-16 12:00 |
Repairs and Maint at Shedwell Weighbridge
A Supplier is Required to Repair and Maintain Shedwell Weighbridge
Please See Attached Scope of Work
For More Info Contact Lunga Luthuli 0313613145/0605798449 |
TPT/2023/01/0038/21083/RFQ |
- |
2023-02-06 12:00 |
Professional Services for the Testing and Verifying of a 80 Ton Toledo Road Weighbridge |
COM/TR02/2022 |
- |
2023-02-20 10:00 |
Appointment of a Service Provider to Repair Existing Weighbridge at Makhado Landfill Site (vondelling) |
85 OF 2022 |
2022-12-09 12:00 |
2022-12-19 12:00 |
Management, Operations and Maintenance of Traffic Control Centres Located on the N4 Maputo Corridor Toll Route and Adjoining Provincial Roads. |
CONTRACT SANRAL N.004-018-2017/1 |
- |
2023-01-31 11:00 |
Appointment of a Service Provider to Repair Existing Weighbridge at Makhado Landfill Site (Vondelling) |
85 of 2022 |
- |
2022-12-19 12:00 |
Supply and Installation of Hardware Infrastructure for the New England Road Landfill Site Weighbridge as Per the General Controls |
CONTRACT No. SCM 18R OF 22/23 |
- |
2023-01-19 12:00 |
Design, Construction, Supply, Delivery, Installion, Configuring, Testing, Commissioning, Verification of a Completely Static Solar Powered Landfill Weighbridge (turnkey) |
MATAT/2022/2023-132 |
- |
2022-12-19 10:00 |
Com045 of 2022 : Appointment of a Service Provider for the Maintenance and Calibration of Weighbridge and Upgrade of Existing Hardware and Software at the George Transfer Station for a Period of One (1) Year (if and when Required |
COM045 OF 2022 |
2022-09-02 11:00 |
2022-09-09 12:00 |
Re-advertising: Request for Proposal for Appointment of a Transactional Advisor Services to Conduct Assessment Feasibility Study and Implementation of the Management and Construction of Weighbridges in the Northern Cape Province |
NCDTSL 01/2022 |
2022-09-08 11:00 |
2022-09-20 11:00 |
Supply and Installation of Hardware Infrastructure for the New Englad Road Landfill Site Weighbridge as Per the General Controls |
CONTRACT No. SCM 18 OF 22/23 |
- |
2022-09-21 12:00 |
Calibration of Assized Weighbridges (asw) at Km 804 and Km 6. Remove, Install and Testing of Wim Wim and Bridge Monitoring System Sensor. |
TFR/2022/08/1211/9517/RFQ |
- |
2022-08-30 10:00 |
Maintenance Services for the Weigh Bridge at Lethabo Power Station for the Period of 5 Years. |
MWP1524GX |
2022-08-15 11:00 |
2022-09-06 10:00 |
Landfill Weighbridge |
MATAT/2022/2023-44 |
- |
2022-08-16 10:00 |
Maintenance and Calibration of Weigh bridges and Ancillary Equipment in the City of Cape Town |
361S/2021/22 |
2022-06-14 12:30 |
2022-07-05 10:00 |
Maintenance and Calibration of Weighbridges and Ancillary Equipment in the City of Cape Town |
361S/2021/22 |
2022-06-14 12:30 |
2022-07-05 10:00 |
Maintenance and Calibration of Weighbridge Scales at Kriel Power Station for a Period of Five (5) Years on an “as and When” Required Basis |
MPKRI10279GX |
2022-06-14 11:00 |
2022-07-04 10:00 |
The Calibration of Seven (07) X Road-weighbridges (60 000kg X 20kh) and 4 X Rail-weighbridges (80 000kg X 20kg) at Various Areas for a Period of One (01) Month. |
CRAC-VAR-36762 |
- |
2021-12-14 10:00 |
The Appointment of a Contractor to Complete the Construction of Makholokoeng Mechanisation Centre (implements Store) and Construction of a Weighbridge Under Maluti a Phofung Local Municipality Within Thabo Mofutsanyana District Municipality in the Free State Province: a Tender for Category 4gb or Higher Cidb Registered Contractors |
DALRRD-RID-FS 003 (2021/2022) |
2021-11-19 11:00 |
2021-12-03 11:00 |
The Calibration Verification and Maintenance of Provincial Weigh Bridges and Vehicle Testing Station for a Period of 36 Months |
DRT 14/08/2018 |
2021-11-19 10:00 |
2021-12-08 11:00 |
The Calibration Verification and Maintenance of Provincial Weigh Bridges and Vehicle Testing Station for a Period of 36 Months. |
DRT 14/05/2018 |
2021-11-19 10:00 |
2021-12-08 11:00 |
Everest-makalu 275kv Line Tower 237 Restoration Work. |
CORP5621 |
2021-11-10 10:00 |
2021-11-24 10:00 |