| Re-advertisement: Appointment of a Panel of Maximum of Five (5) Service Providers for Supply and Delivery of Roads, Stormwater Material, Manhole Cover and Building Material for on an As-and- when Required Basis for a Period of Three Year. |
MLM 19/2025/26 |
- |
2026-04-20 11:00 |
| Sewer Manholes |
SCM/WS 55/25/26 |
- |
2026-03-09 12:00 |
| Panel of Contractors for the Maintenance of Sewer Manholes and Sewer Pumpstations Sump and Associated Infrastructure as and when Required Basis |
BID/17/2025-26 |
- |
2026-03-16 14:00 |
| Appointment of a Panel of a Minimum of Two (2) and a Maximum of Six (6) Service Providers for the Supply and Delivery of a Bulk Material for Water and Sewer Maintenance Over a Period of Three (3) Years. |
TS012/2025 |
- |
2026-01-12 12:00 |
| Re-advertisement: Appointment of a Panel of Maximum Five (5) Service Providers for Supply and Delivery of Roads, Stormwater Material, Manhole Cover and Building Material for as and when Required Basis for a Period of Three (3) Years |
MLM 03/2025/26 |
2025-10-17 10:00 |
2025-11-07 11:00 |
| Supply and delivery of manhole covers and frames, gully gratings and frames (cast iron, ductile iron, mild steel, polymer concrete, reinforced concrete and fibreglass reinforced composite material) |
212S/2025/26 |
- |
2026-06-10 10:00 |
| Appointment of a Panel of Maximum Five (5) Service Providers for Supply and Delivery of Roads, Stormwater Material, Manhole Cover and Building Material for as and when Required Basis for a Period of Three Years |
MLM 24/2024/25 |
2025-03-12 10:00 |
2025-04-01 11:00 |
| Emergency Unblocking, Maintenance and Replacement of Manholes and Sewer Pipes Around Mangaung Metropolitan Municipality, as and when Required. |
MMM/BID 722: 2023/2024 |
2024-03-18 10:00 |
2024-04-11 11:30 |
| Panel for the Supply and Delivery of Barrier Road Kerbs, Paving Slabs, Catch Pits, Square Manhole Covers, Erosion Protection Blocks, Hot Asphalt, Pothole Patching with Cold Asphalt, Pre-fabricated Speed Bumps, Cement, Crusher Run and Aggregates for Concrete and Road Surfacing, Stormwater Pipes and Culverts for a Period of Three Years |
3/2/18/2023-24 |
- |
2024-03-27 12:00 |