| Duvha Power Station Cooling Water Pumps Control System Plc Upgrade |
E2157GXMPDUVR |
2026-07-15 10:00 |
2026-08-03 10:00 |
| The Replacement of the Existing Dpi (dip Proof Inverters) with Control Uninterruptable Power
Supplies (upss) for Kriel Power Station 6 Units for a Period of 2 Years. |
E2828GXMPKRIR |
- |
2026-06-03 10:00 |
| Tender Cancellation: Technical Specification for Komati Power Station Ev Charging Power Supply Infrastructure. |
E1935GXMPKOMCancel |
- |
2026-04-30 10:00 |
| Re-issue: Technical Specification for Komati Power Station Ev Charging Power Supply Infrastructure. |
E1935GXMPKOMR |
- |
2026-04-09 10:00 |
| The Maintenance & Servicing of the Electronics Notice Board for 36 Months |
E2532GXMPKRI |
- |
2026-03-30 10:00 |
| Supply & Install Lockout Unit for 11kva at Arc Bethlehem Branch |
SGI012511RFQ00000009 |
2025-12-03 10:00 |
2025-12-10 12:00 |
| Technical Specification for Komati Power Station Ev Charging Power Supply Infrastructure. |
E1935GXMPKOM |
2025-10-09 10:00 |
2025-10-22 10:00 |
| The Provision of Supply, Delivery, Installation, Commissioning and Perform Faulty Finding
On Electrical Cable on “as and When” Required Basis for a Period of 24 Months. |
E1567GXMPKOMa |
- |
2025-10-01 10:00 |
| The Provision of Supply, Delivery, Installation, Commissioning and Perform Faulty Finding
On Electrical Cable on “as and When” Required Basis for a Period of 24 Months. |
E1567GXMPKOMa |
- |
2025-10-01 10:00 |
| The Kriel Power Station 11 Kv Overhead Line Replacement for a Period of 18 Months |
E1691GXMPKRI |
2025-09-09 10:00 |
2026-09-18 10:00 |
| Refurbishment of Medium Voltage Circuit Breakers on an “as and When” Required Basis at Kriel Power Station for a Period of Five Years. |
E1704GXMPKRI |
2025-09-04 10:00 |
2025-09-23 10:00 |
| Cable Maintenance at Kriel Power Station for a Period of (5) Five Years |
E1692GXMPKRI |
2025-08-19 11:00 |
2025-10-13 10:00 |
| The Provision of Supply, Delivery, Installation, Commissioning and Perform Faulty Finding
On Electrical Cable on “as and When” Required Basis for a Period of 24 Months. |
E1567GXMPKOM |
2025-08-04 10:00 |
2025-08-14 10:00 |
| Kriel Power Station Lighting Installation for a Period of 3 Years. |
E1552GXMPKRI |
2025-08-01 10:00 |
2025-10-21 10:00 |
| Refurbishment of Low Voltage Motors, as Stock Items on an “as and When” Required Basis for a Period of Five Years at Kriel Power Station. |
E1434GXMPKRI |
2025-07-10 10:00 |
2025-08-22 10:00 |
| Replacement of Kriel Power Station Non-lethal Energised Perimeter Detection System (nlepds) for a Period of One Year |
MPKRI11386GX |
2024-11-26 10:00 |
2025-01-30 10:00 |
| The Replacement of the Existing Dpi (dip Proof Inverters) with Control
Uninterruptable Power Supplies (upss) for Kriel Power Station Unit 1 to 6 for A
Period of 2 Years. |
MPKRI11346GX |
2024-11-13 10:00 |
2025-02-12 10:00 |
| For the Supply, Deliver, Install, and Commission Substation Equipment at Blinkpan 3kv Dc Traction Substation Under the Control of Ermelo Depot |
HOACMM-HO-45230 |
- |
2024-10-01 10:00 |
| Design, Supply, Installation, Commissioning, Operation, and Maintenance of 150 Mw (600mwh) Battery Energy Storage System at Komati Power Station. |
MWP2572CX |
2024-09-13 10:00 |
2024-12-09 10:00 |
| Decommissioning of the Old Oil Ring Main Units, Transportation, Installation, Cabling, Testing and Commissioning of the New Ring Main Units at Kriel Power Station for a Period of 6 Months |
MPKRI11187GX |
2024-06-28 09:00 |
2024-07-08 10:00 |
| Mv and Lv Switchgear Maintenance Service Outage Contract from Unit 1 to 6 on an as and when Required Basis for Period of Five (5) Years at Kriel Power Station |
MPKRI11097GX |
- |
2024-05-20 10:00 |