| Provision of the Appointment of Rand Water Professorial Chairs at Universities to Conduct Rand Water Scientific and Engineering Related Work for a 5 Year Period. |
RW10411156-25 |
2025-07-03 10:30 |
2025-07-25 12:00 |
| Appointment of Engineering Firm/consultant for Conducting a Feasibility Study and the Detailed Engineering Design of the Midvaal Regional Wastewater Treatment Works at Rand Water for a Period of 5 Years. |
RW10412286/24 |
- |
2025-02-28 12:00 |
| The Appointment of the Engineering Firm/consultant to Do a Detailed Engineering Design of Borehole and Acid Mine Drained Water Treatment Plants for Potable Water Supply at Rand Water for the Period of 5 Years. |
RW10412065-24 |
- |
2025-02-28 12:00 |
| Appointment of Engineering Firm/consultant for the Design Engineering of Northern Works Water Reclamation Plants at Rand Water for a Period of 5 Years. |
RW10412064-24 |
- |
2025-02-28 12:00 |
| Appointment of Engineering Firm/consultant for the Design Engineering of Water Reclamation Plant in the Barrage at Rand Water for a Period of 5 Years. |
RW10412062/24 |
- |
2025-02-26 12:00 |
| Appointment of Engineering Firm/consultant for the Design Engineering of Midvaal Water Reclamation Plants (meyerton and Glen Douglas Dolomite) at Rand Water for a Period of 5 Years. |
RW10412061/24 |
- |
2025-02-26 12:00 |