| Supply and Deliver Ups Batteries 12v, 22wpc/15min./1.30vpc/25degreesc |
TPL/2026/09/0622/11365/RFQ |
- |
2026-09-11 13:00 |
| Supply of Chemicals for the Test Centre @ Alrode Operations |
TPL/2026/09/0621/11364/RFQ |
- |
2026-09-11 13:00 |
| Service Provider to Calibrate Instruments |
TPL/2026/09/0620/11361/RFQ |
- |
2026-09-11 13:00 |
| Removal and Disposal of Waste at Transnet Pipelines Witbank Depot |
TPL/2026/05/0336/5660/RFQ |
- |
2026-09-15 16:00 |
| Removal of Bees at Great Fish Point Lighthouse, Tnpa Lighthouses and Navigational Systems, Port Alfred |
TNPA/2026/09/2042/11452/RFQ |
2026-09-14 10:00 |
2026-09-17 17:00 |
| Tanker Berth Fire Fighting System Condition Assessment |
TNPA/2026/08/1931/10816/RFQ |
2026-09-11 10:00 |
2026-09-30 16:00 |
| Supply and Delivery of Mechanical and Electrical Works |
TPT/2026/08/1079/11011/RFQ |
- |
2026-09-11 23:00 |
| Buoys Refurbishment and Maintenance to Support Lns System as Part of Maintenance and Emergency Operations. |
TNPA/2026/09/1970/11050/RFQ |
2026-09-15 10:00 |
2026-09-25 16:00 |
| Supply and Delivery of Pontoons (floating Breakwater) Connectors in the Port of Richards Bay for a Period of Six (6) Months |
TNPA/2026/03/0604/3541/RFP |
2026-09-04 11:00 |
2026-09-21 16:00 |
| Service Provision for Hydraulic Repairs and Maintenance for Dredging Services Fleet |
TNPA/2026/03/0514/2962/RFP |
2026-08-27 11:00 |
2026-09-15 14:00 |
| Sites Contamination Assessment |
TPL/2026/03/0178/3211/RFP |
2026-09-17 10:00 |
2026-09-28 12:00 |
| For the Supply and Delivery of Fibreglass Cabinets for Foam Trolley Firefighting Equipment |
TPL/2026/03/0211/3817/RFQ |
- |
2026-09-10 13:00 |
| Supply and Delivery of Exd Fan Cowls for Flame Proof Motors at Transnet Pipelines for a Once off Period. |
TPL/2026/05/0276/4992/RFQ |
- |
2026-09-14 13:00 |
| Installation Of The Smallbore Steel Pipe Wastewater System At The Alrode And Witbank Transnet Pipelines Petroleum Products Storage And Handling Facility. |
TPL/2026/08/0562/10316/RFP |
2026-09-04 10:30 |
2026-10-02 12:00 |
| Site Contamination Assessment at Transnet Pipelines Facilities (pipeline, Depots and Pump Stations) During Emergency Spills for a Period of Three Years, for Sites That Are Located in Gauteng, Mpumalanga, Free State and North-west Provinces on an “as and when Required Basis” |
TPL/2026/03/0178/3211/RFP |
2026-09-17 10:00 |
2026-10-08 12:00 |
| Construction of Reinforced Concrete Ramp at Uithoek Km 129 Under Ladysmith Depot |
TFR/2026/09/0002/114762/RFP |
2026-09-16 10:00 |
2026-09-25 12:00 |
| For the Inspection and Repairs of a Palisade Perimeter Wall at Transnet Pipelines Sasolburg Depot |
TPL/2026/07/0494/8915/RFQ |
2026-09-16 11:00 |
2026-09-23 12:00 |
| Supply, Delivery, Installation and Removal of 9x Air-conditioners in Upington, Groblershoop and Sishen Depots. |
TFR/2026/08/0004/114683/RFQ (TRIM) |
- |
2026-09-23 11:00 |
| Supply, Delivery, Installation and Removal of 9x Airconditioners
In Upington, Groblershoop and Sishen Depots. |
TFR/2026/08/0004/114683/RFQ (TRIM) |
- |
2026-09-23 11:00 |
| For The: Construction of Reinforced Concrete Ramp at Uithoek Km 129 Under Ladysmith Depot |
TFR/2026/09/0002/114762/RFP |
- |
2026-09-25 12:00 |
| A & B Charger Refurbishment |
TPT/2026/09/1155/11396/RFQ |
2026-09-10 10:00 |
2026-09-14 15:00 |
| Repair a Reclaimer Slew Gearbox (tanker Side) |
TPT/2026/09/1143/11322/RFQ |
2026-09-10 11:00 |
2026-09-14 15:00 |
| Waste Management |
TE/2026/04/1338/4420/RFP |
2026-09-15 10:00 |
2026-10-05 16:00 |
| Supply and Delivery of Electonic Controller Module for Noc Boom Gate and Metal Detector Over a Once off Period |
TPL/2026/09/0608/11163/RFQ |
- |
2026-09-10 14:00 |
| For the Provision of Hygiene Services and Pest Control Services at Cutler Site Office in Island View |
TPL/2026/08/0599/10990/RFQ |
2026-09-10 11:00 |
2026-09-16 13:00 |
| For the Provision of General and Hazardous Waste Management Services for Transnet Engineering, Uitenhage Plant and Cape Corridor Depots for a Period of Three (3) Years on an “as and when Required” Basis. |
TE/2026/04/1338/4420/RFP |
2026-09-15 10:00 |
2026-10-05 16:00 |
| Site Contamination Assessment at Transnet Pipelines Facilities (pipeline, Depots and Pump Stations) During Emergency Spills for a Period of Three Years, for Sites That Are Located in Kwazulu-natal Province on an “as and when Required Basis” |
TPL/2026/03/0179/3214/RFP |
2026-09-18 10:00 |
2026-10-09 12:00 |
| Site Contamination Assessment at Transnet Pipelines Facilities (pipeline, Depots and Pump Stations) During Emergency Spills for a Period of Three Years, for Sites That Are Located in Kwazulu-natal Province on an “as and when Required Basis”. |
TPL/2026/03/0179/3214/RFP |
2026-09-18 10:00 |
2026-09-28 12:00 |
| For the Appointment of a Service Provider to Provide Positive Material Identification (pmi) at Germiston Depot Once Off. |
TE/2026/06/2041/6476/RFQ |
2026-09-15 10:00 |
2026-09-22 16:00 |
| Refurbishment of Two Rescue Cage |
TPT/2026/08/1072/10962/RFQ |
2026-09-11 10:00 |
2026-09-17 14:00 |
| Request For The Provision Of Services For The Development Of A Biodiversity Offset Plan For Transnet National Ports Authority (Tnpa), Port Of Saldanha |
TNPA/2026/08/1820/10074/RFQ |
2026-09-11 10:00 |
2026-09-25 12:00 |
| Supply and Delivery of Mechanical and Electrical Works |
TPT/2026/08/1079/11011/RFQ |
- |
2026-09-11 23:00 |
| Supply and Delivery of Electonic Controller Module for Noc Boom Gate and Metal Detector Over a Once off Period |
TPL/2026/09/0608/11163/RFQ |
- |
2026-09-10 14:00 |
| Supply and Delivery of Exd Fan Cowls for Flame Proof Motors at Transnet Pipelines for a Once off Period. |
TPL/2026/05/0276/4992/RFQ |
- |
2026-09-14 13:00 |
| Rental for the 3 X 18-ton and 3 X 32-ton Forklifts |
TPT/2026/08/0980/10362/RFP |
- |
2026-09-11 13:00 |
| Implementation of Strategic Workforce Planning |
TNPA/2026/08/1797/9954/RFP |
2026-08-26 10:00 |
2026-09-10 16:00 |
| For the Appointment of a Service Provider to Provide Positive Material Identification (pmi) at Germiston Depot Once Off. |
TE/2026/06/2041/6476/RFQ |
2026-09-15 10:00 |
2026-09-22 16:00 |
| Rfp for the Provision of Specialised Material Handling Equipment (mhe) Fleet Management Services, to Transnet, Nationally, for a Period of Eight (8) Years |
TCC/2023/08/0001/40193/RFP |
2026-09-22 10:00 |
2026-10-09 15:00 |
| Refurbishment of Oil Storage Tanks for Transnet Engineering Saldanha Depot. |
TE/2026/09/3699/11093/RFQ |
2026-09-18 10:30 |
2026-10-02 12:00 |
| Bienneal Dry Docking of Tugboats Orca and Lizibuko in the Port of East London, for a Once off Period |
TNPA/2026/09/0002/114760/RFP |
2026-09-14 13:30 |
2026-09-22 12:00 |
| The Provision of Hosted Pbx Nationally for a Period of Five (5) Years |
TCC/2026/03/0049/3368/RFP |
2026-09-15 12:30 |
2026-10-06 17:00 |
| Provision of Materials Handling Services for Transnet Soc Ltd Operating as Transnet Port Terminals at Pendoring for a Contract of Two (2) Months at Wet Rate. |
TPT/2026/09/1141/11320/RFQ |
- |
2026-09-09 16:00 |
| Laser alignment services for PEMPT Bulk Plant |
TPT/2026/09/1138/11311/RFQ |
- |
2026-09-11 10:00 |
| Draining, Replacement, Testing and Commissioning of Transformer Oil for B Ship Loader |
TPT/2026/09/1130/11260/RFQ |
2026-09-10 10:00 |
2026-09-14 10:00 |
| Office Cleaning, Hygiene and Gardening for Beaufort West, Laingsburg and Worcester |
TP/2026/03/0041/3121/RFP |
2026-09-15 09:00 |
2026-09-22 16:00 |
| Tanker Berth Fire Fighting System Condition Assessment |
TNPA/2026/08/1931/10816/RFQ |
2026-09-11 11:00 |
2026-09-30 16:00 |
| The Provision of Hosted Pbx Nationally for a Period of Five (5) Years |
TCC/2026/03/0049/3368/RFP |
2026-09-15 12:30 |
2026-10-06 17:00 |
| For the Supply and Delivery of Fibreglass Cabinets for Foam Trolley Firefighting Equipment |
TPL/2026/03/0211/3817/RFQ |
- |
2026-09-09 13:00 |
| Rental for the 3 X 18-ton and 3 X 32-ton Forklifts |
TPT/2026/08/0980/10362/RFP |
- |
2026-09-09 10:00 |
| The Provision of Office Cleaning, Hygiene and Gardening Services at Worcester, Laingsburg and Beaufort West and Surrounding Areas for a Period of Thirty-six (36) Months |
TP/2026/03/0041/3121/RFP |
2026-09-15 09:00 |
2026-09-22 16:00 |