| Appointment of Service Provider for the Supply, Installation, and Upgrading of an Electric Motor Lab Transformer at the Lightning Laboratory |
RFQ 201363 |
2024-05-24 10:00 |
2024-05-31 11:00 |
| For The: Supply, Install, Test and Commission Sf6 Gas Filled Primary Circuit Breakers and Repair Transformer Oil Leaks for 3kv Traction
Substation. |
CRAC-KGG-45446 |
- |
2024-06-12 10:00 |
| Rfq 201346: Appointment of Service Provider for the Maintenance of Oil Sampling and Testing of Transformers. |
RFQ 201346 |
2024-05-21 11:00 |
2024-05-28 11:00 |
| Supply and Delivery of Pressure Relief Devices for Power Transformers for a Period of 4 Years |
ERI/2024/TSS/05 |
2024-05-17 10:00 |
2024-05-24 10:00 |
| Supply and Delivery of Miniature Substation and Distribution Transformers for a Period Ending 30 June 2027. |
SCM/2024/93/ENG |
- |
2024-06-14 12:00 |
| The Appointment of Service Providers for the Repairs, Maintenance and Reconditioning of Up to 2MVA Distribution Transformers on an as and when Required Basis from Date of Award until 30 June 2027 |
A-EE 13-2024 |
- |
2024-06-11 10:00 |
| For the Engineering, Procurement and Construction of Mercury 3rd 400/132 Kv Transformer |
MWP2518TX |
2024-05-16 10:00 |
2024-06-17 10:00 |
| The Establishment of an Enabling Agreement with a Maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “big Five” Material Which Include Meters, Poles/cross Arms, Transformers, Cable and Conductor), Transport (as it Will Be Required and Authorised) for Electrification of New Household Connections (above R3 000 000,00 Per Project) for a Period of Thirty (30) Months (twenty-four (24) Months for Allocation of Task Orders and Six (6) Months for the Close-out of Projects and Finalisation of the Payment Process) for Distribution Division in the Kzn Operating Unit, Central East Cluster as and when Required. |
KZN132 |
2024-05-07 09:00 |
2024-05-31 10:00 |
| Electrical Servicing, Maintenance And/or Repairs of Switchgear, Protection Relays, Dc Battery Chargers, and Instrument Transformers for a Period of Eighteen (18) Months at Cape Town International Airport |
CTIA7477/2024/RFP |
2024-05-07 11:00 |
2024-06-04 10:00 |
| Appointment of Ten(10) Service Providers for Maintenance of Transformers for a Period of 36 Months as and when Required |
LIM74/1/226 |
2024-04-25 09:00 |
2024-05-23 11:00 |
| Addendum Nr. 1 - Supply and Delivery of Distribution Transformers |
ADDENDUM- RFQ 53/2024 |
- |
2024-04-26 12:00 |
| Supply and Delivery of Distribution Transformers (re-advertisement of Rfq 38/2024) |
RFQ 53 OF 2024 |
- |
2024-04-26 12:00 |
| Appointment of Professional Service Provider for the Design and Construction of 20mva, 88/11kv Transformer in Ermelo 88kv Substation. (turnkey) |
8/3-31/2023A |
- |
2024-04-30 11:00 |
| Appointment of a Panel of Suppliers for Supply, Delivery and Offloading of Voltage Transformers, 1000kva, 800kva, 500kva, 315kva, 200kva, 100kva, 50kva Transformers and 200kva, 315kva, 500kva Minisub, 11kv Ringmain Unit and Transformer Oil for a Period of Thirty-Six(36) Months on as and when Required Basis |
11/2024/62 N63/2024 |
- |
2024-05-10 10:00 |
| The Refurbishment Service of Traction Transformer and Rehabilitation of Transformer Oil Spillage on the Ground, at Transnet Freight Rail Wesselsnek, Colworth, Cayingubo and Brankwal Substations, for a Service Period of 4 Months. |
HOAC-LSE-45687_RFP |
2024-04-10 10:00 |
2024-04-25 10:00 |
| Replace 66kv Transformers at Robertson Main Substation |
TE 20/2024 |
2024-04-16 10:00 |
2024-05-03 12:00 |
| Ndpwi : Repair, Maintenance, Service, Replacement of Ht Transformers, Mini-substations, Switchgears, Ht Cables and ( a Supply of 1 Mobile Transformer, 1 Mobile Switchgear (workshop) ) to Various Areas Within the Jurisdiction of Johannesburg Regional Office for a Period of 24 Months . a Detailed Responsiveness Criteria is Stipulated on the Tender Document.
Cidb Grading Required : 6 Ep or Higher |
JHB 23/51 |
2024-04-04 10:00 |
2024-04-16 11:00 |
| Supply and Delivery of 25kva 22kv/400v and 200kva 22kv/400v Distribution Transformers |
RFQ 38 OF 2024 |
- |
2024-04-05 12:00 |
| Supply, Delivery and Offloading of Ring Main Units Coupled with Metering Current Transformer Unit for a Period of 36 Months as and When
Required. |
8/1/2/UMH1428-23/24 |
2024-04-02 10:00 |
2024-05-07 12:00 |
| Bi-ennial Contract for the Supply, Testing, Treatment of Transformer Oil and Repairs to Distribution Transformers |
INF/CEE07/2023 |
- |
2024-04-15 10:00 |
| Supply and Installation of Bulk Electrical Supply Including
Transformers, Switchgears, Mcc and Sub-station Buildings At
Saldanha Bulk Terminal for Transnet Soc Ltd (reg.no.1990/000900/30)
Operating as Transnet Port Terminals, (hereinafter Referred to As
“tpt”) |
iCLM HQ 847/TPT |
2024-03-19 10:00 |
2024-05-17 12:00 |
| Engineer, Procure and Construct of Gumeni 2nd Transformer Project for a Duration of 36 Months |
MWP2431TX |
2024-03-12 10:00 |
2024-04-12 10:00 |
| Term Tender for Design, Manufacture, Delivery, Installation and Commissioning of Power Transformers (supplementary) |
173Q/2023/24 |
2024-03-08 12:00 |
2024-05-17 10:00 |
| Panel of Service Providers for the Provision of Electrical Store Items, Transformers and other Related Works |
KLM2023/24/007 |
- |
2024-03-25 12:00 |
| Transportation and Installation of 11kv Distribution Transformer at Cordelfos Traction Substation |
RFQ NUMBER: 10347673 |
2024-02-29 11:00 |
2024-03-07 10:00 |
| Appointment of a Panel of Service Providers for the Supply and Delivery of Cables, Transformers and Miniature Substations at Govan Mbeki Municipality for a Period of 36 Months, as and when Required |
8/3/1-34/2023 |
- |
2024-03-20 12:00 |
| Transformer Maintenance- Oil Purification |
EPMLM/8/3/490 |
- |
2024-02-28 12:00 |
| Epmlm/8/3/490- Transformer Maintenance -oil Purification |
EPMLM/8/3/490 |
2024-02-19 10:30 |
2024-02-28 12:00 |
| Tender Bsm 63/24: Supply, Delivery and Off-loading of Type B Miniature Substations and Distribution Transformers with Rating Up to 1000kva Period Ending 30 June 2026. |
BSM 63/24 |
- |
2024-03-04 12:00 |
| The Design, Manufacture, Testing and Supply (ex-works) of Neutral Electromagnetic Coupler Combined with Neutral Earthing Resistor and Auxiliary Transformers (necrt) on an “as and when Required” for Eskom Distribution |
MWP2418DX |
- |
2024-03-13 10:00 |
| The Panel Appointment of Twenty (20) Contractors for the Provision of Supervision, Labour, Equipment, Material (except the Big Five (poles, Transformers, Meters, Conductor and Cable) and Transport (as it Will Be Required and Authorized in Specific Circumstance) for Reticulation Projects in the Kwa-zulu Natal Operating Unit, on an “as and When” Required Basis for a Period of Thirty -six (36) Months. |
KZN120 |
2024-02-09 10:00 |
2024-03-15 10:00 |
| Supply and Delivery of Transformer. |
MWP1535TX-R-1 |
- |
2024-04-02 10:00 |
| Appointment of a Panel of Ten (10) Service Providers for the Supply and Delivery of Cables, Transformers and Mini-subststions at Govan Mbeki Municipality for Period of 36 Months, on an as and when Required Basis |
BID NO: 8/3/1-34/2023 |
- |
2024-02-23 12:00 |
| Request for Quotation (rfq) for the Appointment of a Service Provider for the Repair of Fp04 Relays, Supply and Installation of Auxiliary Transformer, Rectifier Fans and Wall Fans. |
10345852 |
2024-01-29 11:00 |
2024-02-05 10:00 |
| Transformer Glass String Insulators Washing at Matimba Power Station. |
LPMAT0052GX_R |
2024-01-25 10:00 |
2024-02-12 14:00 |
| Maintenance and Refurbishment of Transformer
Radiator Cooling Fans for T&ss for a Period of 4 |
ERI /2024/TSS/01 |
- |
2024-02-08 11:00 |
| Maintenance and Refurbishment of Transformer
Radiator Cooling Fans for T&ss for a Period of 4 |
ERI/2024/TSS/01 |
2024-01-25 13:00 |
2024-02-08 10:00 |
| Centlec (soc) Ltd (hereafter Centlec), a Municipal Entity Distributing Electricity in Mangaung, and Other Municipalities Invites Competent and Experienced Electrical Professional Engineering Consultants and Their Professional Teams for a Period of Thirty-six (36) Months, For:
The Design, Manufacture, Supply, Delivery, Installation, Erection, and Commissioning of Various Sizes of High and Medium Voltage Power Transformers with All Their Related Equipment. Design and Install Neutral Earth Compensators (nec), Neutral Earth Resister (ner) or Neutral Earth Compensator Resistor Transformer (necrt). This Must Be Monitored by a Reactor, Single Phase 5kva and Neutral Earth Resistor Monitor Relay (nerm). |
CD51/2023 |
- |
2024-02-13 11:00 |
| Supply, Installation and Commissioning of 5mva Electrical Transformer |
OPS2024-BID/006 |
2024-01-18 10:00 |
2024-02-16 12:00 |
| The Supply and Delivery of Ring Current Transformers |
107G/2023/24 |
- |
2024-01-23 10:00 |
| MV Switchgear, Transformer and Mini Substation Maintenance and Training |
14S/2023/24 |
2023-08-10 10:00 |
2023-08-28 10:00 |
| Tenders are Hereby Invited from a Service Provider/s for the Supply, Delivery and Off-Loading of Electrical Power Transformers on an as and when Required Basis for a Three(3) Year Period for Mogale City Local Municipality |
UMS (E) 01/2023 |
2023-04-11 10:00 |
2023-05-09 11:00 |
| Panel of 10 for Supply and Delivery of Transformers for a Period of 36 Months as and when Required Basis |
LIM74/1/205 |
- |
2023-04-26 11:00 |
| Supply and Delivery of Miniature Substations for Mossel Bay Municipality |
TDR400/2022/2023 |
- |
2023-03-31 12:00 |
| Term Tender for Maintenance, Repair, Refurbishment and Testing of Power Transformers, On-Load Tap Changers , Neutral Earthing Resistors and Neutral Earthing Compensator Resistor Transformers |
248S/2022/23 |
2023-02-28 10:00 |
2023-04-17 10:00 |
| Upgrading of 4x 5MVA Transformers of 22/11kV for Makhado Park, Rodevaal, Cricket Club and Eltivillas East Substations |
83 of 2022 |
- |
2022-12-19 12:00 |
| Appointment of Service Providers for the Supply, Delivery and Off-Loading of Miniature Substations on an as and when Required Basis for a Period with Effect from Date of Award until 30 June 2025 |
A-EE 13-2022 |
- |
2023-01-20 10:00 |
| Upgrade Pretorius Substation 2x 2MVA Transformers (22000/11000V) and Housing |
77 of 2022 |
- |
2022-12-09 12:00 |
| Transformer Maintenance - Oil Purification |
EPMLM/8/3/437 |
2022-11-28 11:00 |
2022-12-08 12:00 |
| Term Tender for Design, Manufacture, Delivery, Installation and Commissioning of Power Transformers |
127Q/2022/23 |
2022-09-30 11:00 |
2022-11-11 10:00 |