Appointment of Professional Service Provider for the Design and Construction of 20mva, 88/11kv Transformer in Ermelo 88kv Substation. (turnkey) |
8/3-31/2023A |
- |
2024-04-30 11:00 |
Appointment of a Panel of Service Providers for the Supply and Delivery of Cables, Transformers and Miniature Substations at Govan Mbeki Municipality for a Period of 36 Months, as and when Required |
8/3/1-34/2023 |
- |
2024-03-20 12:00 |
Supply and Delivery of Transformer. |
MWP1535TX-R-1 |
- |
2024-04-02 10:00 |
Appointment of a Panel of Ten (10) Service Providers for the Supply and Delivery of Cables, Transformers and Mini-subststions at Govan Mbeki Municipality for Period of 36 Months, on an as and when Required Basis |
BID NO: 8/3/1-34/2023 |
- |
2024-02-23 12:00 |
Cancellation Letter for Supply and Delivery of a Transformer in the North East Grid. |
Cancellation letter for MWP1535TX-R |
- |
2023-12-22 10:00 |
The Provision of Replacement of Four Damaged Temperature Transducers in the Marshalling Kiosk on Transformer 6 at Vulcan Substation North East Grid. |
MWP2273TX |
2023-11-15 10:00 |
2023-11-28 10:00 |
Panel of Contractors for the Supply, Maintenance and Repairs of Transformers as and when Required for a Period of 36 Months |
ELM 55/2023 |
2023-11-02 12:00 |
2023-11-24 11:00 |
Invitation to Tender for the Manufacture, Testing, Supply, Delivery, Off-loading and Erection (if Required) of Estimated Quantities of Voltage Transformers on an “as and when Required” Basis for Period of Five (5) Years for Transmission Division. |
MWP2223TX |
2023-11-01 10:00 |
2024-02-05 10:00 |
Invitation to Tender for the Manufacture, Testing, Supply, Delivery, Off-loading and Erection (if Required) of Estimated Quantities of 132kv and Below Current Transformers on an “as and when Required” Basis for Period of Five (5) Years for Transmission Division |
MWP2222TX |
2023-11-01 10:00 |
2024-02-05 10:00 |
Triennial Tender for Supply, Delivery and Off-loading of Electrical Transformers and Mini-substations for City of Mbombela |
COM68/2023 |
- |
2023-11-24 11:00 |
Purchase, Collection and Removal of 1 X Scrap 1.25 Mva Transformer;
Serial Number T791/4; from Eskom in Balmoral Substation In
Mpumalanga Operating Unit |
OLT2090988 |
2023-10-13 10:00 |
2023-10-16 10:00 |
The Refurbishment of Spares Holding and Maintenance of Small Power Transformers Up to 2mva for a Period of 60 Months at Camden Power Station. |
MPCAM10839GX |
2023-10-13 11:00 |
2023-11-13 10:00 |
Design, Manufacture, Supply and Deliver of 40 Mva 15/11.5 Kv Power Transformer. |
MPARN10821GX |
- |
2023-10-30 10:00 |
The Provision for Replacement of Four Damaged Temperature Transducers in the Marshalling Kiosk on Transformer 6 at Vulcan Substation North East Grid. |
MWP2190TX |
2023-09-19 10:00 |
2023-10-05 10:00 |
Supply, Install, Test and Commission 132kv Transformer Capacitive Bushings at Witbank Depot |
TFR/2023/08/0007/40160/RFQ |
2023-08-29 10:00 |
2023-09-08 10:00 |
Supply, Install, Test and Commission 132kv Transformer Capacitive Bushings at Witbank Depot |
ERACMJ-WGO-41789 |
2023-08-29 10:00 |
2023-09-11 10:00 |
Supply, Install, Test and Commission 132kv Transformer Capacitive Bushings at Witbank Substation |
ERACMJ-WGO-41789 |
2023-08-29 10:00 |
2023-09-08 10:00 |
Mv switchgear, transformer and mini substation maintenance and training |
14S/2023/24 |
- |
2023-08-28 10:00 |
Full Refurbishment, Testing and Delivery of Medium Voltage Transformers for Arnot Power Station on a Once off Purchase |
MPARN10759GX |
- |
2023-08-28 10:00 |
For the Transportation, Installation and Commissioning of Three (3) Transformers at 3k Substation Ermelo for Period of 3 Months |
TFR/2023/05/0046/31421/RFQ |
2023-05-09 11:00 |
2023-06-19 10:00 |
For the Supply and Installation of Anode Ground-beds, Transformer Rectifier Units and Forced Drainage Units in the Mpumalanga Province |
TPL/2023/02/0003/22733/RFP |
2023-06-13 10:00 |
2023-07-05 12:00 |
For the Dismantle, Removal and Transportation of 132kv Ac Main Traction Transformer from Palmloop 3kv Dc Subsatation and Installation, Testing and Commissioning of 132kv Ac Main Traction Transformer to Arnot 3kv Dc Traction Substation |
TFR/2023/05/0042/31417/RFP |
2023-05-13 00:00 |
2023-06-21 10:00 |
For the Transportation, Installation and Commissioning of 3 Transformers at 3kv Station Ermelo for the Per Iod of 3 Months |
ERACAM-FDT-39378 |
2023-06-09 11:00 |
2023-06-19 10:00 |
For the Dismantle, Removal and Transportation of 132kv Ac Main Traction Transformer from Palmloop 3kv Dc Subsatation And
Installation, Testing and Commissioning of 132kv Ac Main Traction Transformer to Arnot 3kv Dc Traction Substation |
ERACSM-WGO-38840 |
2023-06-13 11:00 |
2023-06-21 10:00 |
Transformer Installation |
ERACSM-WGO-38840 |
2023-06-13 11:00 |
2023-06-21 10:00 |
Installation and Commissioning |
ERACAM FDT 39378 |
- |
2023-06-19 10:00 |
For The: Drain, Flush, Retro-fill, Test, and Re-classify Polychlorinated Biphenyls (pcb) Contaminated, Oil-immersed Traction and Distribution Transfomers on an “as and when Required” Contract for a Period of 24 Months, Countrywide. |
TFR/2023/05/0011/29774/RFP |
2023-05-23 10:00 |
2023-05-31 12:00 |
For the Refurbishment of Transformers at Bothashoek 3kv, Nooitgedacht 3kv, Saaiwater 3kv, Grootlagte 3kv and Overvaal 25kv Substations |
TFR/2023/05/0005/29087/RFP |
2023-05-18 11:00 |
2023-05-25 10:00 |
For the Refurbishment of Transformers at Bothashoek 3kv, Nooitgedacht 3kv, Saaiwater 3kv, Grootlagte 3kv and Overvaal 25kv
Substations |
ERACES PRC 40577 |
2023-05-18 11:00 |
2023-05-25 10:00 |
Refurbishment of Transformers at Various Substations in Ermelo |
RFP ERACES PRC 40577 |
2023-05-18 11:00 |
2023-05-25 10:00 |
Engineering, Manufacture, Supply, Site Delivery, Installation and Commissioning of 64 High Frequency Power Supplies (hfps) and 12 Upstream Precipitator Transformers Including Upgrading Precipitator Plant Management System (ppms). |
MPTUT10664GX |
- |
2023-08-03 10:00 |
For The: Refurbishment of Traction Transformer at Balfour for a Period of Four (4) Months. |
TFR/2023/03/0003/26459/RFP |
2023-04-12 10:00 |
2023-04-25 10:00 |
Transnet Freight Rail Parktown Supply Chain Services Invites Tenders For Refurbishment Of Traction Transformer At Balfour For A Period Of Four (4) Months |
SIE22016CIDB/HOAC-HO-39759 |
2023-04-12 10:00 |
2023-04-25 10:00 |
For The: Refurbishment of Traction Transformer at Balfour for a Period of Four (4) Months |
SIE 22016 CIDB |
2023-04-12 10:00 |
2023-04-25 10:00 |
The Manufacture, Testing at Contractors Works, Supply, Directory Access Protocol (dap), Delivery (ddp), Installation, Testing at Site And
Commissioning of One Complete Fully Functional Three Phase 20 Mva 33 /11kv Power Transformer for Lekwa Local Municipality’s A-sub Substation. |
DTS 10/2022/2023 |
2023-03-13 11:00 |
2023-03-22 12:00 |
Identification of Local to Site Enterprise Development Beneficiaries to Be Linked to Contracted Suppliers' Subcontracting Commitment for : Installation of All Materials and Equipment Necessary to Provide a Complete Lighting and Small Power System for the Turbine, Boiler and Common Plant Areas Including Lighting Distribution Boards, Transformers, Cabling, Racking, Conduits, Fixtures, Sockets, and Supports at Kusile P20a Units. |
EOI/ERI/2023/CS/01 |
2023-03-10 10:00 |
2023-03-30 10:00 |
Design, Supply, Install, Test and Commission Current Transformer, Configuration of Rectifier, Collection and Installation of Main Transformer from Durban to Sunbury and Supply All Associated Cables at Sunbury 3kv Dc Sub Station Under Witbank Depot |
HOAC-PRC-39586 |
2023-02-27 09:00 |
2023-03-07 10:00 |
Design, Supply, Install, Test and Commission Current Transformer,configuration of Rectifier, Collection and Installation of Main Transformer from Durban to Sunbury and Supply All Associated Cables at Sunbury 3kv Dc
Sub Station Under the Witbank Depot |
TFR/2023/02/0012/23085/RFP |
2023-02-27 09:00 |
2023-03-07 10:00 |
Design, Supply, Install, Test and Commission Current Transformer, Configuration of Rectifier, Collection and Installation of Main Transformer from Durban to Sunbury and Supply All Associated Cables at Sunbury 3kv Dc Sub Station Under the Witbank Depot |
HOAC-PRC-39586 |
2023-02-27 09:00 |
2023-03-07 10:00 |
The Assessment, Design, Detailed Engineering, Manufacture, Testing at Works,
Supply, Delivery, Removal of Existing Transformers, Placement on Foundation,
Installation, Erection, Testing, Commissioning, and Storage of Class 1, 3a, 3b
And 4 Power Transformers on an “as and When” Required Basis for a Period Of
Five Years. |
MWP1375GX |
2023-01-26 10:00 |
2023-05-09 10:00 |
Upgrading of 200kva Transformers to 315kva Transformers in Victor Khanye Local Municipality Re-advert |
154171(2) |
2022-12-01 10:00 |
2022-12-12 12:00 |
The Services of the Full Refurbishment, Testing and Delivery of Medium Voltage
Transformers for Arnot Power Station for Once – off Order |
MPARN10521GX |
- |
2022-12-12 10:00 |
For The: Workshop Repairs and Maintenance of Oil-immersed Traction Transformers on an “as and When” Required Contract Basis for a Period of 36 Months at Various Substations Country Wide. |
SIE 22000 CIDB |
2022-11-22 10:00 |
2022-12-13 10:00 |
Upgrading of 200kva Transformers to 315kva Transformers in Victor Khanye Local Municipality (re-advert) |
154171 |
2022-11-17 09:00 |
2022-11-25 12:00 |
For the Repair of Oil–immersed Distribution Transformers on an “as and When” Required Basis for a Period of 36 Months Nationally. |
SIE 22000 CIDB |
2022-11-11 10:00 |
2022-11-29 10:00 |
Ger-sibande District: Transformer Scheduled Maintenance Contract for 12 Months |
NST22/039 |
2022-10-25 11:00 |
2022-11-02 11:00 |
Nkangala District: Transformer Scheduled Maintenance Contract for 12 Months |
NST22/038 |
2022-10-25 11:00 |
2022-11-02 11:00 |
Ehlanzeni District: Transformer Scheduled Maintenance Contract for 12 Months |
NST22/037 |
2022-10-25 11:00 |
2022-11-02 11:00 |
Appointment of a Panel of Service Providers for the Supply, Delivery, Off-loading and Distribution of Transformers and Refurbishment of Transformers and Mini-substation for the Period of 36 Months |
8/3-28/2022 |
- |
2022-10-17 12:00 |
Appointment of a Panel of Service Providers for the Stripping, Assesment, Repair and Testing of Mv Distribution Overhead and Miniature Substation, Power Transformers and Ring Sub-units, Refurbishment of Miniature Subsation Enclosures, Distribution Boxes and Metering Enclosures for a Period of 36 Months. |
8/3/1-14/2022 |
2022-09-22 11:00 |
2022-10-14 12:00 |