| Kriel Power Station Boilers Apertures and Bottom Ash Hoppers Refractory Supply and Services for a Period of Five Years on an As-and-when Required Basis |
E2964GXMPKRI |
2026-06-09 10:00 |
2026-06-26 10:00 |
| Removal of Clinkers Inside the Boiler and Cleaning of Boiler
Inaccessible Areas Using Rope Access During Outages and on an "as
And When" Required Basis at Kriel Power Station for a Period of 5
Years |
E2301GXMPKRI |
2025-12-18 14:30 |
2026-01-28 10:00 |
| Boiler Thick Wall Components and High-pressure Pipework Metallographic Replication During Outages at Kriel Power Station for a Period of (5) Five Years |
E2190GXMPKRI |
2025-11-24 10:00 |
2025-12-11 10:00 |
| Turbine and Boiler Pressure Safety Valves Refurbishment from Unit 1 to 6 at Kriel Power Station for a Period of Five Years |
E1520GXMPKRI |
2025-07-22 09:00 |
2025-07-31 10:00 |
| Provision of Boiler and Turbine Auxiliary Valves Refurbishment for the Period of 5 Years on an as and when Required Basis at Matla Power Station |
E1336GXMPMAT-R |
- |
2025-10-16 10:00 |
| Turbine and Boiler High Pressure Valves Stellite from Unit 1 to 6 for a Period of 5yrs at Kriel Power Station. |
E1237GXMPKRI |
2025-06-23 10:00 |
2025-08-20 10:00 |
| Provide Heat Exchanger Chemical Cleaning During Various Outages and Maintenance for a Period of Five Years on an as and when Required Bases at Kriel Power Station. |
MPKRI11492GX |
2025-03-18 10:00 |
2025-04-01 10:00 |
| The Procurement and Installation of 3x Lp Heaters 4 for a Period of 5 Years on an as and when Required Basis at Kriel Power Station. |
MPKRI11468GX |
2025-02-13 10:00 |
2025-03-31 10:00 |
| Provision of Boiler and Turbine Auxiliary Valves Refurbishment for the Period of 5 Years on an as and when Required Basis at Matla Power Station. |
MPMAT11169GX |
- |
2024-07-22 10:00 |