| Vessel and Piping Rubber Services for Wtp and Slurry Plant for a Period of 5 Years at Matla Power Station |
E3138GXMPMAT |
2026-07-28 11:00 |
2026-08-31 10:00 |
| Supply and Delivery of Outside Plant Pipes and Water Plant Pipes for a Period of Five (05) Years at Matla Power Station on an “as and when Required Basis” |
E3130GXMPMAT |
- |
2026-07-30 10:00 |
| The Refurbishment and Spares Supply of Seal Oil Vacuum Pumps for Matla Power Station for a Period of Five (5) Years |
E3125GXMPMAT |
2026-07-29 12:00 |
2026-08-25 10:00 |
| Draw, Fabricate, Supply, Deliver, Replace, and Install New Pipework with Fittings Inside the Cable Tunnels and Pipe Trenches at Kriel Power Station for a Period Of
Six Months |
E2902GXMPKRI |
2026-06-10 14:00 |
2026-08-28 10:00 |
| Repairs of Ash Dam Filter Drains and Piezometer to Improve Ash Dam Stability at Matla Power Station for a Period of Twelve (12) Months. |
E2933GXMPMAT |
2026-06-08 14:00 |
2026-06-19 10:00 |
| Open, Inspect, Issue Inspection Report, Refurbish or Replace Non-return, Globe, Ball, Amot, Butterfly, Wedge, Gate, Parallel Slide and Diaphragm Valves of the Boiler and Turbine Auxiliary Systems at Kriel Power Station for a Period of Five
Years |
E2737GXMPKRI |
2026-04-13 13:00 |
2026-08-13 10:00 |
| The Supply and Installation of Cooling Water Pump Discharge Hydraulic Operated Weight Assisted/ Auto Close Valves System Spares and Maintenance Services for a Period of 10 Months |
MPKRI11460GX - Cancellation |
- |
2026-03-20 11:00 |
| Supply of Pump Shop Personnel Resources at Kriel Power Station for a Period of 3 Years. |
E1191GXMPKRI |
2025-08-12 10:00 |
2025-10-01 10:00 |
| Turbine and Boiler Pressure Safety Valves Refurbishment from Unit 1 to 6 at Kriel Power Station for a Period of Five Years |
E1520GXMPKRI |
2025-07-22 09:00 |
2025-07-31 10:00 |
| Turbine and Boiler Pressure Safety Valves Refurbishment from Unit 1 to 6 at Kriel Power Station for a Period of Five Years |
E1520GXMPKRI |
2025-07-22 09:00 |
2025-07-31 10:00 |
| Supply and Delivery of Steel Pipes, Tubes, Sheets, Bars, Reducers, Adaptors and Plates At
Kriel Power Station on an “as and When” Required Basis for the Period of 5 Years |
E1451GXMPKRI |
2025-07-15 10:00 |
2025-09-11 10:00 |
| Provision of Boiler and Turbine Auxiliary Valves Refurbishment for the Period of 5 Years on an as and when Required Basis at Matla Power Station |
E1336GXMPMAT-R |
- |
2025-10-16 10:00 |
| The Supply and Delivery of Outside Plant Spares at Kriel Power Station Over for 5
Years |
E1386GXMPKRI |
2025-07-01 13:00 |
2025-07-25 10:00 |
| Turbine and Boiler High Pressure Valves Stellite Repairs
From Unit 1 to 6 for a Period of Five Years at Kriel Power Station |
E1237GXMPKRI |
2025-06-23 08:00 |
2025-07-04 10:00 |
| Turbine and Boiler High Pressure Valves Stellite from Unit 1 to 6 for a Period of 5yrs at Kriel Power Station. |
E1237GXMPKRI |
2025-06-23 10:00 |
2025-08-20 10:00 |
| The Supply and Installation of Cooling Water Pump Discharge Hydraulic Operated Weight Assisted/ Auto Close Valves System Spares and Maintenance Services for a Period of 10 Months. |
MPKRI11460GX |
2025-02-26 10:00 |
2025-03-18 10:00 |
| Eskom Kriel Power Station for Resin Transfer and Auxiliary Demin Supply Piping Replacement for a Period of 12 Months |
MPKRI11461GX |
2025-02-12 10:00 |
2025-03-05 10:00 |
| Supply, Delivery & Refurbishment of Mill Lube Oil Pumps. |
MPMAT11379GX |
2024-12-02 10:00 |
2024-12-11 10:00 |
| Supply and Delivery of Bearings, Pumps and Consumables at Kriel Power Station on a Once off Basis. |
MPKRI11250GX |
2024-09-03 10:00 |
2024-11-26 10:00 |
| Cancellation of Tender Mpkri10277gx: Kriel Power Station Hot Tapping and Line Stopping for Water Treatment Plant Pipes as and when Required for 3 Years |
MPKRI10277GX Cancellation |
- |
2024-08-02 10:00 |
| Provision of Boiler and Turbine Auxiliary Valves Refurbishment for the Period of 5 Years on an as and when Required Basis at Matla Power Station. |
MPMAT11169GX |
- |
2024-07-22 10:00 |
| Refurbishment of Steam Traps Valves on Unit 1-6 During Planned (go, Mgo & Ir’s) and Unplanned (opportunity Maintenance) Outages on an as and when Required Bases for a Period of Five (5) Years at Matla Power Station. |
MPMAT11120GX |
2024-05-23 10:00 |
2024-06-10 10:00 |
| Provision of Secondary Cooling Pipework Replacement for Outages for Unit 1-6 at Kriel Power Station for a Period of 5 Years |
MPKRI11116GX |
2024-05-15 09:00 |
2024-06-05 10:00 |
| Design, Locally Manufacturing (south Africa Manufactured) and Delivery of Replacement Tube Bundle for the Main Turbine (mt) (6 Off) and Boiler Feed Pump Turbine (bfpt) (6 Off) Lube Oil Coolers. |
MPKRI11092GX |
2024-04-18 08:00 |
2024-05-13 10:00 |
| Refurbishment of Turbine Safety Valves on Unit 1-6 During Planned (go, Mgo & Ir’s) and Unplanned (opportunity Maintenance) Outages on an as and when Required Bases for a Period of 5 Years at Matla Power Station. |
MPMAT11041GX |
- |
2024-04-09 11:00 |
| Maintenance Services and Repairs of Unit 1 to 6 Valves (boiler and Turbine), Pipe/heat Exchanger Flanges as Well as Hp Heater Leak Testing and Plugging at Matla Power Station for a Period of (05) Five Years. |
MPMAT10677GXR |
2024-03-07 12:00:00 |
2024-04-30 10:00 |