| Rehabilitation of Industrial Street (ward 6) |
9/3/1/438 |
2026-06-23 10:00 |
2026-07-01 12:00 |
| Rehabilitation of Paul Sauer Street (ward 6) |
9/3/1/439 |
2026-06-23 10:00 |
2026-07-03 12:00 |
| Water Supply Source Augmentation Using Sassa Borehole and the Construction of Water Treatment Package Plant (ward 1) |
9/3/1/434 |
2026-06-19 10:00 |
2026-07-10 12:00 |
| Replacement of Ac Water Pipes in Bela-bela Town -gilfillan, Botha, Van Der Merwe, Pretoria, Voortrekker, Sutter, Marx, Crockery and Potgieter Streets (ward 1) Phase 1 |
9/3/1/431 |
2026-06-15 10:00 |
2026-07-13 12:00 |
| Rehabilitation of Meininger Street (ward 1) |
9/3/1/437 |
2026-06-15 10:00 |
2026-06-29 12:00 |
| Repair of Masemola-moloto Street (pavement) (ward 2) |
9/3/1/436 |
2026-06-15 10:00 |
2026-06-26 12:00 |
| Upgrading of Pienaarsriver Sewer Pump Station (ward 8 |
9/3/1/432 |
2026-06-19 10:00 |
2026-07-15 12:00 |
| Construction of Road Paving and Stormwater in Rapotokwane Phase 1 |
9/3/1/424 |
2026-03-06 10:00 |
2026-04-10 12:00 |
| Construction of Road Paving and Stormwater in Rapotokwane Phase 1 |
9/3/1/424 |
2026-03-06 10:00 |
2026-04-10 12:00 |
| Appointment of a Service Provider to Develop a Roads and Stormwater Master Plan for Bela-bela Local Municipality |
9/3/1/422 |
- |
2026-03-20 12:00 |
| Supply, Installation and Delivery of Borehole Drilling and Installation of Two (2) X Solar Powered-pumps, in Bela Bela Farm, Limpopo Province |
AEI01REQ000595 |
2026-03-06 12:00 |
2026-03-11 11:00 |
| Moretele North (klipvoor) Bulk Water Supply Work Package 6: Pipeline from Bela-bela Reservoir to Modimolle Including Booster Pump Station |
RFB/MW/312/2025-26 |
2025-09-29 10:00 |
2025-11-13 12:00 |
| Moretele North (klipvoor) Bulk Water Supply Work Package 6: Pipeline from Bela-bela Reservoir to Modimolle Including Booster Pump Station |
RFB/MW/312/2025-26 |
2025-09-29 10:00 |
2025-10-24 12:00 |
| Repairs and Maintenance of Water Purification Plant 9-2-258 |
9/2/258 |
- |
2025-09-26 12:00 |
| Refurbishment of Roads and Stormwater in Limpopo Road and Mabunda Street (ward 5&7) |
9/1/3/415 |
2025-07-04 10:00 |
2025-07-25 12:00 |
| Refurbishment of Roads and Stormwater in Limpopo Road and Mabunda Street (ward 5&7) |
9/1/3/415 |
2025-07-04 10:00 |
2025-07-25 12:00 |
| Errutum Panel of Thirty Consulting Engineering Firms |
9/1/3/409 |
2025-04-17 10:00 |
2025-05-09 12:00 |
| Refurbishment of Switching Stations |
9/3/1/406 |
- |
2025-04-23 12:00 |
| Construction of Road Paving and Bulk Stormwater in Bela Bela X8 - Phase 4 |
9/1/3/410 |
2025-04-15 10:00 |
2025-05-09 12:00 |
| Panel of Thirty (30) Consulting Engineering Firms (20 Civil Engineering, 5 Electrical Engineering & 5 Mechanical Engineering) for the Implementation of Infrastructure Development Projects Planned for a Period of Thirty-six (36) Months |
9/1/3/409 |
2025-04-17 10:00 |
2025-05-09 12:00 |
| Replacement of Bulk Raw Water Ac Pipeline from Lapa Pump Station to Bela-bela Water Treatment Works (ward 1 and 9) |
9/1/3/403 |
2025-04-16 10:00 |
2025-05-09 12:00 |
| Refurbishment of Switching Stations |
9/3/1/406 |
- |
2025-04-23 12:00 |
| Construction of Road Paving and Bulk Stormwater in Bela Bela X8 - Phase 4 |
9/1/3/410 |
2025-04-15 10:00 |
2025-05-09 12:00 |
| Replacement of Bulk Raw Water AC Pipeline from Lapa Pump Station to Bela-Bela Water Treatment Works (Ward 1 and 9) |
9/1/3/403 |
2025-04-16 10:00 |
2025-05-09 12:00 |
| Water Supply Source Augmentation and the Construction of Water Reticulation Network in Tsakane (ward 7) |
9/1/3/402 |
2025-02-25 10:00 |
2025-03-20 12:00 |
| Upgrading of the Industrial Sewer Outfall Line (ward 2). |
9/1/3/401 |
2025-02-25 10:00 |
2025-03-20 12:00 |
| Construction of Water Pump Booster Station and Upgrading of a Steel Elevated Water Tank in Ext. 8 (ward 4) |
9/1/3/400 |
2025-02-25 10:00 |
2025-03-20 12:00 |
| Construction of Water Pump Booster Station and Upgrading of a Steel Elevated Water Tank in Ext. 8 (ward 4). |
9/1/3/400 |
2025-02-25 10:00 |
2025-03-20 12:00 |
| Water Supply Source Augmentation and the Construction of Water Reticulation Network in Tsakane (Ward 7) |
9/1/3/402 |
2025-02-25 10:00 |
2025-03-20 12:00 |
| Upgrading of the Industrial Sewer Outfall Line (Ward 2) |
9/1/3/401 |
2025-02-25 10:00 |
2025-03-20 12:00 |
| Errutum Repair and Maintenance of Damaged Pavements |
9/3/1/398 |
- |
2024-11-28 12:00 |
| Repair and Maintenance of Damaged Pavement Structures at Tambo Drive |
9/3/1/398 |
- |
2024-11-28 12:00 |
| Erratum- Construction of Road Paving and Stormwater in Bela Bela X5- Phase 1 |
9/3/1/389 |
2024-08-08 10:00 |
2024-09-06 12:00 |
| Construction of Road Paving and Stormwater in Bela Bela X5 - Phase 1 |
9/3/1/389 |
2024-08-08 10:00 |
2024-09-06 12:00 |
| Construction of Road Paving and Stormwater in Bela Bela X5- Phase 1 |
9/3/1/389 |
2024-08-09 10:00 |
2024-09-06 12:00 |
| Upgrading of the Settlers Sewer Pump Station (ward 2) |
9/3/1/388 |
2024-05-14 10:00 |
2024-06-14 12:00 |
| Upgrading of the Sewer Rising Main from Leseding Pump Station to the Wwtw (ward 2&6) |
9/3/1/351 |
2024-05-15 10:00 |
2024-06-14 12:00 |
| Construction of Paved Roads and Stormwater in Bela-Bela Township Kgosana, Mashapa and Street 49 (Ward 5) |
9/3/1/342 |
- |
2022-03-11 12:00 |
| Refurbishment of the Sewer Outfall from Aventura Pump Station (PS) to Bela-Bela Waste Water Treatment Works (WWTW) |
8/3/1/327 |
- |
2021-09-06 12:00 |