The Provision of Supervision, Labour, Equipment, Material and Transport Required for the Upgrade of Electrical, Civil and Building Works in Umkomaas 88/22/11kv Substation in the Centraleast Cluster, Kwazulu-natal Operating Unit, for a Period of One (1) Year. |
KZN133 |
- |
2024-06-03 11:00 |
Provision of Professional Team to Conduct
Feasibility and Detailed Planning Studies,
Including Obtaining Tranche 1 Approval from
Dohs, Environmental Approvals (eia &
Wula) and Spluma Approval for
Ntshongweni Phase 2 Rural Settlement |
1H-25745 |
2024-03-25 11:00 |
2024-04-19 11:00 |
19/1/9/1/43TB(23) |
19/1/9/1/43TB(23) |
- |
2023-09-05 11:00 |
Appointment of a Contractor for Design, Supply, Delivery, Installation, Maintenance, Testing and Commissioning of Water Borehole System in Kwazulu Natal Province for the Period of Two (02) Years. |
19/1/9/1/43TB(23) |
2023-08-22 14:00 |
2023-09-05 11:00 |
An Enquiry Process in Order to Establish an Enabling Agreement
With a Pre-qualified Panel of Six (6) Contractors for the Construction Of
Hv Lines, Within the Sub Transmission Portfolio in the Kwazulu Natal and the Free State Operating Units (centraleast |
KZN082. |
2023-07-12 09:00 |
2023-08-24 10:00 |
An Enquiry Process in Order to Establish an Enabling Agreement with a Pre-qualified Panel of Ten (10) Contractors for Civil Works Performed Within the Sub Transmission Portfolio in the Kwazulu Natal (kzn), and Free State (fs) Operating Units (centraleast |
KZN080 |
2023-07-10 09:00 |
2023-07-27 10:00 |
Avon/driefontein 132kv Compensation Tee Line 1&2: Permanent Line Restoration, in the Empangeni Area of the Kzn Operating Unit, for Eme, Qse and Lme Level 1 â?? 4 Companies, for a Period of Nine Months. |
KZN059 |
2023-01-23 09:00 |
2023-04-24 10:00 |
Avon/driefontein 132kv Compensation Tee Line 1&2: Permanent Line Restoration, in the Empangeni Area of the Kzn Operating Unit, for Eme, Qse and Lme Level 1 â?? 4 Companies, for a Period of Nine Months. |
KZN059 |
2023-01-23 09:00 |
2023-04-17 10:00 |
Avon/driefontein 132kv Compensation Tee Line 1&2: Permanent Line Restoration, in the Empangeni Area of the Kzn Operating Unit, for Eme, Qse and Lme Level 1 â?? 4 Companies, for a Period of Nine Months. |
KZN059 |
2023-01-23 09:00 |
2023-03-31 10:00 |
To Establish a Contract for the Civil Works, Upgrade at Klipspruit Substation in the Newcastle Area of the Kzn Operating Unit with Companies with B-bbee Level 1-4 Status Level of Contributor. |
KZN006 |
2022-03-29 10:00 |
2022-04-11 10:00 |
Rehabilitation to Aqueduct No.4 Siphon 6 |
2022/005 |
2021-09-07 11:00 |
2021-09-16 12:00 |
The Design, Construction of the Homesteads and Infrastructure, to Relocate Six (6) Families at Ingula Pumped Storage Scheme (ipss |
KZN0099/TM |
2020-12-15 10:00 |
2021-01-28 10:00 |
The Provision of Supervision, Labour, Equipment and Material Required to Carry Out General Building Maintenance for Transmission in the Kzn Operating Unit on an as and when Required Basis, for a Period of 36 Months. |
KZN0074/PM |
- |
2020-09-30 10:00 |
Sitilo 132/11/22kv Capacity Increase Project, in the Empangeni Area of the Kzn Operating Unit |
KZN0066/CS |
2020-08-21 10:00 |
2020-09-08 10:00 |
Madungela 132/11/22kv Capacity Increase Project, in the Empangeni Area of the Kzn Operating Unit |
KZN0065/CS |
2020-08-21 10:00 |
2020-09-08 10:00 |
The Provision of Supervision, Labour, Equipment, Material Except the “big Five Material” and Transport (as it Will Be Required and Authorized) for the Electrical and Civil Works Required for the Refurbishment of Nkandla Substation |
KZN0061/YH |
- |
2020-08-28 10:00 |
The Supply and Installation of 132kv Line Between Mtubatuba Nseleni Substations (approx 42km), in the Empangeni Area of the Kzn Operating Unit |
KZN0055/CS |
2020-07-15 10:00 |
2020-07-30 10:00 |
The Supply and Installation of 132kv Line Between Mtubatuba Nseleni Substations (approx 42km), in the Empangeni Area of the Kzn Operating Unit |
KZN0055/CS |
2020-07-15 10:00 |
2020-07-30 10:00 |