| The Procurement and Refurbishment of Deashing System Components at Medupi
Power Station for a Period of 5 Years. |
E3298GXLPMED |
- |
2026-08-25 10:00 |
| The Inspection and Repairs of Coal Bunker Plant During Outages for a Period of Five (5) Years. |
E1804GXLPMATcan |
2026-07-23 11:00 |
2026-07-31 10:00 |
| E3230gxlpmat Invitation to Tender (itt) - Refurbish Tubular Air Heaters Phase 1 Supply of Material for First Unit 4 |
E3230GXLPMAT |
2026-07-22 10:00 |
2026-08-07 10:00 |
| Unique Identifier: 240-143499237: the Refurbishment of 90 Mills, Including the Raw Coal Feeder and Other Mill Peripheral Systems, Over the Period of 5 Years. |
E2511GXLPMED |
2026-02-11 10:00 |
2026-02-26 10:00 |
| Provision of the Coal Chute Optimization at Medupi Power Station for a Period of 2 Years |
E2322GXLPMED |
2026-01-14 10:00 |
2026-02-20 10:00 |
| Provision of Supply and Refurbishment of Blowers for a Period of 5 Years as and when Required |
E2375GXLPMED |
2026-01-14 11:00 |
2026-02-24 10:00 |
| The Refurbishment of Medupi Power Station Vertical Spindle Mill Gearbox (kpv 1750 S) for a Period of Five (5) Years |
E2340GXLPMED |
2026-01-14 10:00 |
2026-02-05 10:00 |
| Excitation System Replacement for Medupi & Kusile Power Station for a Period of Five (5) Years |
E1587GXMPKUSR |
2025-11-18 11:00 |
2025-12-05 10:00 |
| Refurbishment of Mill Cylinders to Medupi Power Station for a Period of 5 Years on an as and when Required Basis. |
E1210GXLPMEDR |
2025-11-19 11:00 |
2025-11-27 10:00 |
| Change Hollow Shaft Coupling Configuration Project for a Period of Six (06) Months at Matimba Power Station. |
E2036GXMPMAT |
- |
2025-11-27 10:00 |
| Medupi Power Station Submerged Scraper Conveyor Service During Philosophy Outages for a Period of 5 Years |
E2001GXLPMED |
- |
2025-11-07 10:00 |
| Supply and Delivery of Gear Oil Pumps on an as and when Required Basis for a Period of Five Years |
E1908GXLPMAT |
2025-10-08 13:30 |
2025-10-20 10:00 |
| Supply and Delivery of Mills Coupling on an as and when Required Basis for a Period of Five Years |
E1909GXLPMAT |
2025-10-07 13:30 |
2025-11-20 10:00 |
| Inspections and Repairs of Coal Bunker Plant During Outages for a Period of Five (5) Years |
E1804GXLPMAT |
- |
2025-10-15 10:00 |
| Provision of Industrial Station Chutes Cleaning at Matimba Power Station for the Period of 5 Years. |
E1694GXLPMAT_ |
2025-08-18 10:00 |
2025-09-11 11:00 |
| Provision of Chutes Cleaning at Matimba Power Station for Period of 5 Years E1694gxlpmat |
E1694GXMAT - MEMO |
2025-08-18 11:00 |
2025-09-11 11:00 |
| The Medupi Power Station Flue Gas Desulphurization (fgd) Retrofit Engineer, Procure, Construct (epc) Project |
MWP2577PS |
2024-10-02 09:00 |
2026-02-02 10:00 |
| Maintenance of Soot Blower and Boiler Fans for a Period of Five (5) Years at Matimba Power Station - Extended as Per Addendum |
LPMAT0093GX-R. |
- |
2025-05-05 14:00 |
| The Scope is for the Refurbishment of Mill Hydraulic Cylinders to Medupi Power Station for a Period of 60 Months on an as and when Required Basis. Refer to 241-2022652 for Full Scope of Work. |
E1210GXLPMED |
2025-05-07 10:00 |
2025-05-26 10:00 |
| Maintenance of Soot Blower and Boiler Fans for a Period of Five (5) Years at Matimba Power Station |
LPMAT0093GX-R |
- |
2025-04-28 14:00 |
| The Manufacture, Supply and Delivery of Pulse Jet Fabric Filter High Filtration Area Trial Bags for Medupi and Kusile Power Stations. |
E1101CXMWP |
2025-04-17 11:00 |
2025-05-02 10:00 |
| Invitation to Tender for the Manufacturing and Supply of Boiler Protection Shields and Associated Components for a Period of 5 Years on as and when Required |
LPMAT00114GX. |
2025-02-10 10:00 |
2025-03-10 14:00 |
| Refurbishment of Cpp Regeneration Acid Mixing Station |
LPMAT00103GX |
2024-10-24 10:00 |
2024-12-12 14:00 |
| Refurbishment of Cpp Regeneration Acid Mixing Station |
LPMAT00103GX |
2024-10-24 10:00 |
2024-11-07 14:00 |
| The Cancellation of Provision of Air-cooled Condenser Industrial Cleaning, Inspection, Refurbishment and Coating. at Matimba Power Station for the Period of Sixty Months (5 Years) at Matimba Power Station |
CANCELLATION - LPMAT0095GX |
- |
2024-10-09 14:00 |
| The Medupi Power Station Flue Gas Desulphurization (fgd) Retrofit Engineer, Procure, Construct (epc) Project for an Estimated Contract Period of Eight (8) Years. |
MWP2577PS |
2024-10-02 09:00 |
2025-05-29 10:00 |
| Supply and Delivery of Transmitters for a Period of 5 Years. |
LPMED00123GX |
- |
2024-09-30 14:00 |
| Fire Protection Installation and Commissioning |
LPPS0025GCD-R |
2024-08-19 10:00 |
2024-09-12 14:00 |
| Supply and Delivery of Boiler Tubes to Matimba Power Station Over a Period of Five Years on as and when Required Basis |
LPMAT0094GX |
2024-07-31 10:00 |
2024-09-26 14:00 |
| Matimba Power Station Unit 1 to 6 Dhp Refurbishment |
LPMAT0096GX |
- |
2024-07-24 14:00 |
| Provision of Air Cooled Condenser Industrial Cleaning, Inspection, Refurbishment and Coating. at Matimba Power Station for the Period of Sixty Months (5 Years) at Matimba Power Station |
LPMAT0095GX |
- |
2024-06-27 14:00 |
| Tender Cancellation: Matimba Power Station On-site Gearbox Refurbishment for a Period of 05 Years |
LPMAT0043GX TENDER CANCELLATION |
- |
2024-06-28 11:00 |
| The Provision of Owner’s Engineer and Project Management Services for the Medupi Power Station Flue Gas Desulphurization (fgd)'s Engineer, Procure and Construct (epc) Project for an Estimated Contract Period of Eight (8) Years. |
MWP2456PS |
2024-06-04 10:00 |
2024-07-16 10:00 |
| Hazardous Location Repairs for Compliance Certification at Matimba Power Station |
LPMAT0092GX |
- |
2024-06-24 11:00 |
| Maintenance of Soot Blower and Boiler Fans at Matimba Power Station for a Period of 5 Years |
LPMAT0093GX |
2024-05-22 10:00 |
2024-06-24 14:00 |
| Lpmed00113gx the Provision of Calibration and Refurbishment of Safety Valves at Medupi Power Station for a Period of 60 Months |
LPMED00113GX |
2024-05-14 13:00 |
2024-06-03 14:00 |
| The Supply and Refurbishment of Burner Fuel Oil Pneumatic Cylinders to Medupi Power Station for a Period of 5 Years on an as and when Required Basis. |
LPMED00107GX |
2024-04-04 13:00 |
2024-04-04 14:00 |