| General Service and Overhaul of Auxiliary and Secondary Cooling Water Valves on Unit 1-6 During Outages Over a Period of Five (5) Years at Lethabo Power Station. |
E1217GXGPLET |
- |
2025-07-07 10:00 |
| Supply and Installation of Turbine Control System Hydraulic Accumulator for 36 Months at Lethabo Power Station (re-issue for Mwp2649gx) |
E1126GXGPLET |
2025-04-14 09:00 |
2025-05-05 10:00 |
| Main Condensers Coating and Rubber Lining
Repairs (tubesheet, Waterbox, Waterbox
Cross-over Piping) on Units 1 - 6 at Lethabo
Power Station for Period of 5 Years During
Outages. |
MWP2960GX |
- |
2025-03-03 10:00 |
| Supply, Delivery and Refurbishment of Pulleys for a Period of Five (5) Years to Lethabo Power Station on as and when Required Basis. |
MWP2882GX |
- |
2025-04-07 10:00 |
| Tube (solo) Steam Oxide Life Optimisation Measurement and Sampling Of
The Platen Super Heater, Final Super Heater and Secondary Reheater
And Surface Preparation / Sandblasting as and when Required During
Outages and Opportunity Maintenance for the Period of 5 Years. |
MWP2926GX |
2025-02-19 10:00 |
2025-03-05 10:00 |
| Sandblast and Coat Various Turbine Plant Auxiliaries Equipment(s) as and when Required for Period of Five (5) Years at Lethabo Power Station |
MWP2801GX |
- |
2024-11-14 10:00 |