Upgrade Power Factor Correction |
TPT/2023/05/0032/29297/RFQ |
- |
2023-05-17 12:00 |
Upgrade Power Factor Correction |
TPT/2023/05/0008/28979/RFQ |
- |
2023-05-12 12:00 |
Refurbishment of Transnet Pipeline Flame Proof Medium Voltage
Mainline Motors for a Period of Three Years |
TPL/2022/03/0002/25813/RFP |
- |
2023-05-26 12:00 |
Upgrade Power Factor Correction |
TPT/2023/04/0054/28117/RFQ |
- |
2023-05-03 12:00 |
Upgrade Power Factor Correction |
TPT/2023/04/0028/27695/RFQ |
- |
2023-04-25 12:00 |
For the Supply and Installation of Anode Ground-beds, Transformer Rectifier Units and Forced Drainage Units in the Kwazulu-natal Province |
TPL/2023/02/0004/22740/RFP |
2023-05-02 11:00 |
2023-05-26 12:00 |
Expression of Interest for Professional Service Providers for the Period of Three (3) Years (panel of Psps) |
IDTKZN-PANEL-2024-2027 |
- |
2023-05-25 11:00 |
Provision of Multi-disciplinary Engineering Consulting Services for the Southern Wastewater Treatment Works: Electro-mechanical Upgrades |
PSC-2022/018 |
2023-04-13 10:00 |
2023-05-12 11:00 |
Provision of Multi-disciplinary Engineering Consulting Services for the Southern Wastewater Treatment Works: Electro-mechanical Upgrades. |
PSC 2022/018 |
2023-04-13 10:00 |
2023-05-12 11:00 |
Upgrade Power Factor Correction |
TPT/2023/03/0039/26392/RFQ |
- |
2023-04-04 12:00 |
Lightning Protection and Earthing Design Concept for Thatch Structures at Ushaka Marine World. |
BS.479 |
2023-04-03 10:00 |
2023-04-06 11:00 |
Supply, Installation, Testing and Commissioning of Damaged Equipement at Quail Subststation |
CRAC-LSE-41009 |
2023-04-03 10:00 |
2023-04-11 10:00 |
Upgrade Power Factor Correction |
TPT/2023/03/0010/25483/RFQ |
- |
2023-03-24 12:00 |
Electrical Modification and Intergration H104 |
TPT/2023/03/0006/25347/RFQ |
- |
2023-03-23 13:00 |
Multidisciplinary Panel for Various Infrastructure Works |
G454/2022 |
- |
2023-04-13 11:00 |
Upgrade Power Factor Correct |
TPT/2023/03/0036/24470/RFQ |
- |
2023-03-13 12:00 |
For the Provision of Installation and Commissioning of Miniature Subs for Transnet Soc Ltd (reg. No. 1990/000900/30) Operating as Transnet Port Terminals (hereinafter Referred to as “tpt”) at the Port of Richards Bay. |
TPT/2023/03/0016/24270/RFQ |
- |
2023-03-10 12:00 |
Upgrade Power Factor Correction |
TPT/2023/02/0006/23751/RFQ |
- |
2023-03-03 12:00 |
Lightning Protection and Earthing Design Concept for Thatch Structures. |
RFQ BS 447 |
2023-02-27 10:00 |
2023-03-02 11:00 |
Bulk electrical services upgrade at MUT |
RFB MUT 37/2022 |
2023-01-24 12:00 |
2023-02-07 11:00 |
Avon/driefontein 132kv Compensation Tee Line 1&2: Permanent Line Restoration, in the Empangeni Area of the Kzn Operating Unit, for Eme, Qse and Lme
Level 1 – 4 Companies, for a Period of Nine Months. |
KZN059 |
2023-01-23 09:00 |
2023-04-24 10:00 |
Request for Quotations from Qualifying and Experienced Entities for the Provision of Professional Electronics Engineering Services for the Completion of the Durban Westville Correctional Facility |
IDTKNQT23DCSPSP006-ELECTRONICS ENGINEER |
- |
2022-12-09 11:00 |
Wiggins Water Works Main Substation Mv Switchgear Upgrade |
2023/026 |
2022-12-06 10:00 |
2023-01-26 12:00 |
Buffelsdraai Landfill Leachate Management Improvements –
Mechanical and Electrical Works |
WS-7410 |
2022-11-24 10:30 |
2022-12-15 11:00 |
Rfp: Energy Management Systems Solution
Installation in Ethekwini Municipality Facilities |
1X-3868 (Ext) |
- |
2022-11-18 11:00 |
For the Maintenance of Substation Protection Systems in the Port of Durban for a Period of Thirty-six (36) Months. |
TNPA/2022/08/0843/9349/RFQ |
2022-11-22 10:00 |
2022-12-09 12:00 |
Replacement of Instrument Landing System (ils) at King Shaka International Airport (ksia) |
KSIA6895/2022/RFP |
2022-11-29 10:00 |
2023-02-15 12:00 |
Purchasing Agreement for Reinstating 5mw Rectifier Unit in Durban Substation for Six Months |
KZN/RAIL/10/2022/15/Q |
2022-11-17 10:00 |
2022-11-17 12:00 |
Construction of the Stockville 132kv Cut-in Lines and the Stockville-mahogany Ridge 132kv Line |
E-9406D |
2022-11-04 10:00 |
2022-12-02 11:00 |
Supply, Design, Installation and Commissioning of the 1mva, 11kv/400v Mini Substation and Free Standing Low-voltage Panel, Re-routing of Medium-voltage and Low-voltage Cables from Old Substation into New Mini Sub and Distribution Board |
TE/2022/10/0045/15246/RFP |
2022-11-03 11:00 |
2022-11-18 10:00 |
Repair and Replacement of High Mast Lights at Durban Bbc Terminals (durban Mpt, Durban Car, Maydon Wharf) for Transnet Soc Ltd (reg. No 1990/000900/30) Operating as Transnet Port Terminals (hereinafter Referred to as “tpt”) |
TPT/2022/05/0171/3688/RFP |
2022-11-01 10:00 |
2022-12-02 12:00 |
Appointment of a Multidisciplinary Professional Team for the Kwazulu Central Provincial Laundry: Installation of Hvac |
ZNB 5037/2022-H |
2022-11-08 11:00 |
2022-11-28 11:00 |
For the Prefeasibility Design for the New Administration Facility at B-berth in the Port of Durban for a Period of Three (3) Months. |
TNPA/2022/08/0824/9132/RFP |
2022-10-18 10:00 |
2022-10-31 12:00 |
Supply, Replacing Wiring and Components for the Existing Mini
Subs (1mva and 1.6mva) for Transnet Engineering Rotating Machines Depot
150 Eel Road Umbilo Industrial for a Once Period |
TE/2022/09/0003/13077/RFP |
2022-10-06 11:00 |
2022-10-25 10:00 |
Supply, Replacing Wiring and Components for the Existing Mini Subs (1MVA and 1.6MVA) for Transnet Engineering Rotating Machines Depot 150 Eel Road Umbilo Industrial for a Once Period |
TE/2022/09/0047/12390/RFP |
2022-09-20 11:00 |
2022-10-14 10:00 |
Request for Quotation: Re-instate High Mast Lights, 500w, 230v Led Lights at Durban Yard, Springfield Yard and Clairwood Depot for Metrorail Kzn |
KZN/RAIL/08/17/2022/007/Q-1 |
2022-09-13 10:00 |
2022-09-19 12:00 |
Provision of Electrical Engineering Services -infrastructure That Includes the Inspection, Reporting, Removal of Illegal Services and Restoring of Legal Supply During a 36-month Period |
E-9784 |
- |
2022-10-07 11:00 |
Request for Quotation for Supply and Install Battery Banks and Interconnectors for Metrorail Kzn |
KZN/RAIL/08/17/2022/008/Q |
2022-09-05 10:00 |
2022-09-12 12:00 |
Installation of New Generator Sets in 2 Central Laundries |
ZNB 5026/2022-H |
2022-08-23 10:00 |
2022-09-06 11:00 |
Appointment of a Service Provider for the Supply, Installation and Commissioning of Signalling Cables from Durban to Congella for the Signal Department in the Kwa Zulu Natal Region (kznr) for a Period of 8 Months |
DBN/CAP (BAC) 001 |
2022-08-12 10:00 |
2022-08-25 12:00 |
Appointment of a Service Provider to Provide Electrical Systems Maintenance, Servicing and Support at Atns King Shaka International Airport and for All Atns Sites in the Kzn Region for a Period of Five (05) Years. |
ATNS/FALE/RFP020/FY22.23/ELECTRICAL SERVICES |
2022-08-03 11:00 |
2022-08-22 13:00 |
The Provision for the Design, Manufacture, Testing, Supply, Delivery, Off-loading, Installation and Commissioning, (including Spares and Training) of Mv Indoor Primary Metal- Enclosed Switchgear, of the Estimated Quantities on an “as and When” Required Basis for the Central East Cluster, Kwa-zulu Natal and Free State Operating Units for a Period of 36 Months. |
KZN027 |
2022-07-19 09:00 |
2022-09-30 10:00 |
B09-2021-22-re-advertisment Electrification of Mtshilwane |
B09/2021-22 |
- |
2022-06-30 14:00 |
Request for Proposals for the Appointment of Multi-disciplinary Professional Engineering Consultants for the Completion of the Bravo Taxiway and Remote Apron Stands at King Shaka International Airport |
KSIA6881/2022/RFP |
2022-06-22 11:00 |
2022-07-18 11:00 |
Appointment of a Service Provider/s for the Electrical Infrastructure Upgrade at the Midlands Campuses |
DUT 2022/479 |
2022-04-21 11:00 |
2022-05-17 11:00 |
Three (3) Year Energy Efficiency Demand Side Management Framework Contract Within Ethekwini Municipality Buildings - Extension of Closing Date to 08-04-2022 |
CSA-3267 EXTENSION OF CLOSING DATE |
- |
2022-04-08 11:00 |
36-month Repairs, Maintenance & Installation of Electrical Systems in Ethekwini Municipality Buildings - Extension of Closing Date to 08-04-2022 |
CSA-3263 EXTENSION OF CLOSING DATE |
- |
2022-04-08 11:00 |
Technical Support and Maintenance Services of the Municipality’s Intelligent Transport System (its) for a 36-month Period |
1T-48691 |
2022-04-08 10:00 |
2022-05-06 11:00 |
Professional Service for the Refurbishment and Construction of Various 275kv and 132kv Overhead Power Lines and Related Substation Assets |
E.9788 |
- |
2022-05-06 11:00 |
Provision of Professional Consulting Services for the Design and Construction Monitoring of Upgrades to Tongaat Central Wastewater Treatment Works -72-month Contract |
PSC. 2021-005 |
2022-03-30 10:00 |
2022-04-22 11:00 |