| Design and Construction of System Operating Control (soc) Building at Emkhiweni |
E3005NTCSAMWP |
2026-06-10 11:00 |
2026-07-17 10:00 |
| Re-issue: Technical Specification for Komati Power Station Ev Charging Power Supply Infrastructure. |
E1935GXMPKOMR |
- |
2026-04-09 10:00 |
| Provision for the Design, Engineering, Procurement, Construction, Construction Management, Start-up, Commissioning, Performance Testing, Operator and Maintenance Training of Up to 12.82mw Solar Photovoltaic System and 2 Years Maintenance and Operating at Arnot Power Station |
E2297GCDMWP |
2026-01-13 09:30 |
2026-01-30 10:00 |
| Technical Specification for Komati Power Station Ev Charging Power Supply Infrastructure. |
E1935GXMPKOM |
2025-10-09 10:00 |
2025-10-22 10:00 |
| Execution and Construction of Middelburg/bulhoek 22kv Strengthening
Phase 2 |
E1709DXEC |
2025-09-10 10:00 |
2025-09-25 10:00 |
| The Appointment of a Maximum of Five (05) Contractors on the Panel of the Maintenance of Water and Wastewater Treatment Works Infrastructure as and when Required for a Period of 36 Months |
BS09/07/2025 |
2025-08-19 10:00 |
2025-09-09 12:00 |
| Appointment of a Maximum of 2 (two) Service Providers for The
Installation, Supply, Repairs and Maintenance of Traffic Signals for a Period of 36 Months as and when Required |
BS03/07/2025 |
2025-08-05 10:00 |
2025-08-26 12:00 |
| Appointment of Additional(one) 01 Contractor to the Panel for the Refurbishment and Replacement of Civil Works, Mechanical and Electrical Equipments at Water, Waste Water Treatment Works as and when Required for 36 Months |
BS07/02/2025 |
2025-03-11 10:00 |
2025-04-01 12:00 |
| Appointment of a Panel of Electrical Contractors for Implementing Energy Efficiency and Demand Side Management Projects at Nkangala District Municipality for a Period Three (03) Years |
185541 |
2024-11-22 10:00 |
2025-01-22 12:00 |
| Komati Community Training Facility Establishment |
MPKOM11312GX |
- |
2024-10-17 10:00 |
| Design, Supply, Installation, Commissioning, Operation, and Maintenance of 150 Mw (600mwh) Battery Energy Storage System at Komati Power Station. |
MWP2572CX |
2024-09-13 10:00 |
2024-12-09 10:00 |
| Maintenance, Repairs and Supply of Transformers Installations as Well as Switch Gears Throughout Mpumalanga Province for a Period of Three (3) Years on as and when Required Basis |
PWRT/1635/24/MP |
2024-08-27 11:00 |
2024-09-11 12:00 |
| Appointment of a Suitable Service Provider for the Procurement and Installation of Renewable Energy Equipment for Smmes Affected by Load-shedding Effects Within Nkangala District Municipality (re-advert) |
176153 (RE-ADVERT) |
2024-08-22 10:00 |
2024-09-04 12:00 |
| Proffessional Services: Department of Justice and Constitutional Development: Mpumalanga Middelburg Local Seat: Repairs and Renovations: Electrical Engineering |
NST24-021 |
2024-05-08 10:00 |
2024-05-21 11:00 |