Installation or Replacement of Damaged Electrical Works to Various Property of Mossel Bay Municipality |
TDR70/2023/2024 |
2023-12-06 11:00 |
2024-01-19 12:00 |
Mossel Bay: Upgrade 11kV Switchgear at Pinnacle Point Substation |
TDR35/2023/2024 |
2023-12-06 11:00 |
2024-01-19 12:00 |
Mossel Bay: Upgrade 11kv Switchgear at Pinnacle Point Substation |
TDR35/2022/2023 |
2023-12-06 11:00 |
2024-01-19 12:00 |
Engineering, Procurement, Construction and Commissioning of Hybrid Photovoltaic (pv) System with Integrated Battery Energy Storage at the Hartenbos Wastewater Treatment Works, Mossel Bay |
TDR41/2023/2024 |
2023-11-09 11:00 |
2024-02-02 12:00 |
Engineering, Procurement, Construction and Commissioning of Hybrid Photovoltaic (pv) System with Integrated Battery Energy Storage at the Hartenbos Wastewater Treatment Works, Mossel Bay |
TDR41/2023/2024 |
2023-11-09 11:00 |
2024-02-02 12:00 |
Engineering, Procurement and Construction of a Small-scale Solar Pv Plant with Battery Storage at the Thusong Centre |
TDR11/2023/2024 |
2023-08-03 11:00 |
2023-08-25 12:00 |
Bulk & Electrification of Low Cost Housing Projects for a Period of 3 Years |
TDR428/2022/2023 |
2023-06-21 11:00 |
2023-07-07 12:00 |
Bulk & Electrification of Low Cost Housing Projects for a Period of 3 Years |
TDR428/2022/2023 |
2023-06-21 11:00 |
2023-07-07 12:00 |
Mossel Bay: Main Sewer Network Between Glentana and Greatbrak: Mechanical and Electrical Equipment for Four Sewage Pump Stations Installed in Existing Conservancy Tanks and Auxiliary Works |
TDR442/2022/2023 |
2023-05-17 11:00 |
2023-06-09 12:00 |
Main Sewer Network Between Glentana and Greatbrak: Mechanical and Electrical Equipment for Four Sewage Pump Stations Installed in Existing Conservancy Tanks and Auxiliary Works |
TDR442/2022/2023 |
2023-05-17 11:00 |
2023-06-09 12:00 |
Engineering, Procurement and Construction of a Small-scale Solar Pv Plant with Battery Storage at the Thusong Centre |
TDR405/2022/2023 |
2023-04-11 11:00 |
2023-04-21 12:00 |
Engineering, Procurement and Construction of a Small-scale Solar Pv Plant with Battery Storage at the Thusong Centre |
TDR405/2022/2023: |
2023-04-11 11:00 |
2023-04-21 12:00 |
Engineering, Procurement and Construction of a Small-Scale Solar PV Plant with Battery Storage at the Thusong Centre |
TDR405/2022/2023 |
2023-04-11 11:00 |
2023-04-21 12:00 |
Installation of Replacement of Damaged Electrical Works to Various Property of Mossel Bay Municipality |
TDR412/2022/2023 |
- |
2023-05-05 12:00 |
High Mast Floodlighting at Kwanonqaba in Mossel Bay |
TDR427/2022/2023 |
2023-03-29 11:00 |
2023-04-21 12:00 |
High Mast Floodlighting at Kwanonqaba in Mossel Bay |
TDR427/2022/2023 |
2023-03-29 11:00 |
2023-04-21 12:00 |
Electrical Bulk Supply to Vaale Vallei Pump Station |
TDR394/2022/2023 |
2023-03-14 11:00 |
2023-04-06 12:00 |
Electrical Bulk Supply to Vaale Vallei Pump Station |
TDR394/2022/2023 |
2023-03-14 11:00 |
2023-04-06 12:00 |
Construction of the New Aalwyndal (11/11kV) Switching Station |
TDR327/2021/2022 |
- |
2022-07-15 12:00 |
Construction of the New Aalwyndal (11/11kv) Switching Station |
TDR327/2021/2022 |
2022-06-22 11:00 |
2022-07-15 12:00 |
Supply, Installation, Commissioning and Maintenance of the Mossel Bay Telemetry System |
TDR282/2021/2022 |
- |
2022-04-29 12:00 |
Maintenance, Testing and Inspection of Electrical Equipment |
TDR275/2021/2022 |
- |
2022-03-11 12:00 |
Upgrade of the Scada (supervisory Control and Data Acquisition) at the Desalination Plant, Mossel Bay |
TDR280/2021/2022 |
2022-01-24 14:00 |
2022-01-28 12:00 |
Beach Street Sewer Pump Station Upgrade |
TDR253/2021/2022 |
2021-11-24 11:00 |
2021-12-17 12:00 |
Mossel Bay: Great Brak: Main Sewer Network Phase 03: Mechanical and Electrical Equipment for the Raw Sewage Pump Stations H3, P17 and P17.1 and Auxiliary Works |
TDR218/2021/2022 |
2021-11-16 11:00 |
2021-12-10 12:00 |
Installation of Electrical Pre-Paid Meters/Smart Meters and Installation and Management of Electricity Meters with Automatic Meter Reading Function(AMR) |
TDR234/2021/2022 |
- |
2021-11-26 12:00 |
Mossel Bay: Great Brak: Main Sewer Network Phase 03: Mechanical and Electrical Equipment for the Raw Sewage Pump Stations H3, P17 and P17.1 and Auxiliary Works |
TDR218/2021/2022: |
2021-11-16 11:00 |
2021-12-10 12:00 |
Bulk Infrastructure to New Seester & Dolphin Crescent Sewer Pump Stations |
TDR206/2021/2022: |
2021-11-17 11:00 |
2021-12-10 12:00 |
Upgrade of 66 kV Overhead Line Between Duinzicht-and Ockert Bothma Substations on Behalf of the Mossel Bay Municipality |
TDR233/2021/2022 |
2021-10-14 11:00 |
2021-11-05 12:00 |
Upgrade of 66 Kv Overhead Line Between Duinzicht- and Ockert Bothma Substations on Behalf of the Mossel Bay Municipality |
TDR233/2021/2022 |
2021-10-14 11:00 |
2021-11-05 12:00 |
TDR 61/2019: Hartenbos 11kv Substation |
TDR 61/2019 |
2020-01-15 11:00 |
2020-01-31 12:00 |