| Concrete Storm Water Pipes and Wingwalls Material03-16-2026-142914 |
RFQTECH25/2025/2026 |
- |
2026-03-24 12:00 |
| Design and Reconstruction of a 2.0km Municipal Access Road in Ga-lekgwara and Stormwater Control (turnkey Project) |
bm23/25/26 |
- |
2026-03-13 11:00 |
| Panel of Roads and Stormwater Contractors for Supply and Installation of Roads and Stormwater Materials as and when Required for a Period of 36 Months -3ce or Higher |
BM15/25/26 |
2026-02-09 11:00 |
2026-03-03 11:00 |
| Erratum- Construction of Blouberg Stormwater Retention Ponds (AVON) |
BM25/24/25 |
- |
2025-02-20 12:00 |
| Design and Re-gravelling of Dantzig Access Road, Reconstruction of Storm-water Retention Pond and Storm-water Control (turnkey Project) |
BM09/24/25 |
2024-09-17 11:00 |
2024-09-30 11:00 |
| Construction of Bosehla to Thalane Access Road and Stormwater Control |
BM22/22/23-02 |
2024-07-04 11:00 |
2024-07-30 11:00 |
| Rehabilitation of Senwabarwana Internal Streer and Control Phase 1 |
BM05/23/24 |
- |
2024-07-26 11:00 |
| Construction of Kwarung Internal Streets and Stormwater Control |
BM22/22/23 |
- |
2024-07-26 11:00 |
| Design and Re-graveling of Ga-kgatla Access Road and Stormwater Control-turnkey Project |
BM09/23/24 |
- |
2024-02-27 11:00 |