The Manufacturing, Supply, and Delivery of Pulse Jet Fabric Filter Bags for Arnot Power Station |
MPARN10247GX |
- |
2022-06-09 11:00 |
The Supply Resources for Services, Replacement of Components and Commissioning of Tube Mills and Vertical Spindle Mills During Normal Maintenance on Full Time Basis and Outages on an “as- And- When” Required Basis for U1-u6 Mills on for a Period of 36 Months at Arnot Power Station. |
MPARN10238GX |
- |
2022-06-21 00:00 |
Refurbishment of Rocker Arms for Vertical Spindle Mills for U2 – U6, on an “as and when Required Basis” for a Period of 36 Months at Arnot Power Station |
MPARN10136GX |
- |
2022-03-28 10:00 |
The Design, Supply and Installation of Water Based Fixed Automatic Fire Protection System for All Incline Conveyors and Hydrant System for Coal Plant at Arnot Power Station for the Period of 18 Months (turnkey Project). |
MPARN10092GX |
2022-02-14 10:00 |
2022-03-17 10:00 |
The Supply and Installation of Wear Resisting Material Known as Tiling on an “as- And- When” Required Basis for the Period of 60 Months |
MPGXC006824 |
- |
2021-11-02 10:00 |
The Maintenance of Secondary Air Dampers, Core Air Dampers and Burner Tilts Actuators at Arnot Power Station for a Period of Three (3) Years |
MPGXC006556 |
- |
2021-04-15 10:00 |
The Unit 1 Stein Industries Mills - Replacement and Rotation of Mill Liners on an “as- And-when” Required Basis” for a Period of 5 Years at Arnot Power Station |
MPGXC006408 |
- |
2020-11-25 10:00 |
The Provision on Main Condenser, Moc Coolers, H2 Coolers, Bsfpt Coolers, Efp Cooler Tubes, Water Boxes Cleaning and Other Heat Exchangers During Outages for Unit 1-6 at Arnot Power Station for a Period of Three (3) Years |
MPGXC006371 |
- |
2020-11-10 10:00 |
The Unit 1-6 Iso Pulverized Fuel Sampling on Coal Pipes and Air in Leakage Test Service at Arnot Power Station for the Period of Five (5) Years |
MPGXC006262 |
- |
2020-08-14 10:00 |
Extension of Enquiry Closing Date from 18 June 2020@04:00 Pm to 23 June 2020@04:00 Pm for the Supply and Install 3, 80 Ton Weigh Bridges Including the Automation Systems Required at Arnot Power Station for the Period of 2 Months |
OLT1206852 |
- |
2020-06-23 16:00 |
The Supply and Delivery of the Main Turbine Control Oil Pumps (scam-imo Vb 906 G - Mcop), Auxiliary Control Oil Pumps (scam-imo Ha 906 De (acop)) and Sfpt (scam-imo Hx 703 D3 - Sfpt Acop) Control Oil Complete Pump Sets (3 of Each) |
OLT1207544 |
- |
2020-06-25 10:00 |
The Supply and Install 3, 80 Ton Weigh Bridges Including the Automation Systems Required at Arnot Power Station for the Period of 2 Months |
OLT1206852 |
- |
2020-06-18 16:00 |
The Provision of Coal Plant Cleaning and Lashing for a Period of Three (3) Years at Arnot Power Station |
OLT1205016 |
- |
2020-06-11 23:00 |
The Supply and Delivery of Three (3) Set of Mill Liners at Arnot Power Station |
OLT1203746 |
- |
2020-06-05 23:00 |
The Supply and Installation of Wear Resisting Material Known as Tiling on an “as- And- When” Required Basis for the Period of 36 Months. |
MPGXC006054 |
2020-03-11 10:30 |
2020-06-11 10:00 |
The Supply and Installation of Wear Resisting Material Known as Tiling on an “as- And- When” Required Basis for the Period of 36 Months. |
MPGXC006054 |
2020-03-11 10:30 |
2020-04-28 10:00 |
The Supply and Installation of Wear Resisting Tiling on an “as- And- When” Required Basis for the Period of 36 Months. |
MPGXC006054 |
2020-03-11 10:30 |
2020-04-28 10:00 |
Supply and Delivery of Filter Elements |
MPGXC005826 |
- |
2019-11-26 10:00 |
Supply and Delivery of Roller Assembly Spares |
MPGXC005827 |
- |
2019-11-26 10:00 |