| Supply, Delivery, Installation, and Commissioning of Smart Meters, Data Concentrator Units (dcus), Ready Board Retrofits, Access Covers, Ipcs, Pole Top Split Metering Kiosks, Secure Pole Mount Dc Kiosks Passive, Base Units, Meter
Seals, Padlocks and All Associated Accessories Including the Decommissioning, Scrapping and Disposal of Existing Meters for the Eskom Distribution Division. |
E3153DXMWP |
2026-07-10 10:00 |
2026-07-31 10:00 |
| The Supply, Deliver and Offload Electrical Components |
E2959CXMWP |
2026-06-10 10:00 |
2026-06-29 10:00 |
| The Design, Manufacture, Testing and Supply of Substation Stranded Conductor Clamps and Substation Hardware, on as and when Required Basis. |
E2774NTCSATX |
- |
2026-06-05 10:00 |
| For the Design, Manufacture, Testing and Supply of Estimated Quantities of Glass Insulators on an “as and when Required” Basis. |
E2213NTCSAMWP |
2026-01-30 10:00 |
2026-03-09 10:00 |
| E1596dxealr- Supply and Delivery of Lv and Mv Cable Termination Kits and Connectors for Gauteng Cluster on an as and when Required for a Period of 5 Years |
E1596DXEALR |
- |
2025-10-20 10:00 |
| Request for Information Pertaining to the Supply, Support, Delivery and Offloading of Travelling Wave-based (tw-based) Protection Intelligent Electronic Devices (ieds) for High Voltage (hv) and Extra High Voltage (ehv) Feeders |
E1735NTCSACS |
- |
2025-09-18 10:00 |
| Supply and Delivery of Lv and Mv Cable Termination Kits and Connectors for Gauteng Cluster on an as and when Required for a Period of 5 Years |
E1596DXEAL |
2025-07-30 10:00 |
2025-08-27 10:00 |
| Supply and Delivery of Lv and Mv Cable Joint Kits for the Gauteng Cluster on an as and when Basis for a Period of 5 Years |
E1599DXEAL |
2025-07-31 10:00 |
2025-08-26 10:00 |
| The Manufacture at Works, Testing, Inspection, Supply, Packaging, Quality Assurance and Delivery to Site or Stores, Off-loading of Estimated Quantities of Indoor and Outdoor Ac Distribution Boards and Outdoor Junction Boxes to Be Used in Various Ntcsa Substations, on an “as and When” Required Basis, for a Period of Five (5) Years |
E1442NTCSA-CSMWP |
2025-07-21 10:00 |
2025-09-08 10:00 |
| Request for Information in the Design, Supply, Delivery, Installation and Commissioning of Solar Pv Microgrid. |
E1331DXMWP |
2025-06-10 10:30 |
2025-07-04 10:00 |
| The Design, Manufacture at Works, Testing, Quality Assurance, Delivery to Site or Stores, Off-loading, Erection, Commissioning, Decommissioning, Training of Ntcsa Personnel, Installation and Disposal of Vented Lead Acid Cells; Battery Stands and All Related Accessories for a Period of 5 (five) Years with an Option to Extend the Contract Duration by 2 (two) Years. |
E1044NTCSAMWP |
2025-04-16 09:30 |
2025-05-27 10:00 |
| Request to Obtain Information About High Efficiency Low Emission Technology - Rfi |
E1072CXMWP |
2025-04-10 09:00 |
2025-04-25 10:00 |
| The Manufacture, Testing, Supply, Delivery, Off-loading, Erection, Commissioning, (inclusive of Spares and Training), of Estimated Quantities of High Voltage Switchgear That Includes Voltage Category Range of 33kv to 132kv Circuit Breakers/ Disconnecting Circuit Breakers and Sf6 Gas for Ntcsa on “an as and when Required” Basis for a Five (5) Year Period. |
MWP3015NTCSA |
2025-03-27 10:00 |
2025-06-11 10:00 |
| The Manufacture, Testing, Supply, Delivery, Off-loading, Erection, Commissioning, (inclusive of Spares and Training), of Estimated Quantities of High Voltage Switchgear That Includes Voltage Category Range of 275kv to 765kv Circuit Breakers/ Disconnecting Circuit Breakers and Sf6 Gas for Ntcsa on “an as and when Required” Basis for a Five (5) Year Period. |
MWP3014NTCSA |
2025-03-27 10:00 |
2025-06-04 10:00 |
| The Supply, Delivery and Installation of Copper Clad Steel Conductors Used for Earthing Within National Transmission Company South Africa on an “as and When” Required Basis for a Period of Five (5) Years. |
MWP3056NTCSA |
2025-03-10 10:00 |
2025-03-31 10:00 |
| Supply and Delivery of Surge Arrestors for Northern Grid |
MWP3055NTCSA |
2025-03-13 10:00 |
2025-04-15 10:00 |
| The Manufacture, Testing, Supply, Delivery, Off-loading, Erection, Commissioning, (inclusive of Spares and Training), of Estimated Quantities of High Voltage Switchgear That Includes Voltage Category Range of 22kv to 132kv Disconnectors and Earthing Switches for Ntcsa on “an as and when Required” Basis for a Five (5) Year Period |
MWP2941NTCSA |
2025-03-27 10:00 |
2025-05-28 10:00 |
| Request for Information for the Design and Supply of Residential Pv Solutions and Post-construction Maintenance |
MWP3000DX |
2025-02-21 10:00 |
2025-03-17 10:00 |
| Request for Information for Installation and Commissioning Capability of the Total Rooftop Pv Solution |
MWP3040DX |
2025-02-21 10:30 |
2025-03-10 10:00 |
| Request for Information for Pv Solutions Installation and Commissioning Capability |
MWP3001DX |
2025-02-21 10:30 |
2025-03-20 10:00 |
| Provision to Supply, Deliver, Install, Commission and Maintain Electric Vehicle Charging Stations for Fleet Electric Vehicle (ev) Pilot Project at Eskom Various Power Stations, Generation Division |
MWP2991GX |
2025-01-24 11:00 |
2025-03-06 10:00 |
| The Construction, Manufacture, Training, Supply, Delivery, Off-loading and Erection of Metering Schemes for Use in Ntcsa Substations, on an “as and When” Required Basis, Over a Period of Five (5) Years, with an Option to Extend by a Further Five (5) Years |
MWP2972NTCSA |
2025-02-10 10:30 |
2025-03-27 10:00 |
| The Design, Development, Manufacture, Integration, Testing at Works and Site, Development of User Documentation, Supply, Delivery, Off-loading (if Required), Installation and Commissioning of Fully Equipped Mobile Dc System Containers in Ntcsa Substations and Telecoms Sites, on an “as and When” Required Basis, for a Production Period of Five (5) Years |
MWP2846NTCSA |
2025-01-22 13:00 |
2025-03-04 10:00 |
| Pre-qualification of the Original Equipment Manufacturers (oem's) for the Design, Manufacture and Testing Ex-works Of
Various Types of Pole Top and Ground Mounted Transformers for Various Clusters Within the Distribution
On an 'as and When' Required Basis for a Period of Twelve (12) Months. |
MWP2911DX |
2025-01-22 13:00 |
2025-02-10 10:00 |
| Provision of Maintenance of High and Medium Voltage Electrical Installation and Switchgear on as and when Required Basis at Eskom Majuba Ucg Site And
Mine Building Complex for a Period of Three (3) Years. |
MWP2872CX |
- |
2024-12-11 10:00 |
| Request for Information (rfi) for the Supply, Delivery and Installation of Copper Clad Steel Conductors Used for Earthing Within Ntcsa Substations for a Period of Five (5) Years on an ‘’as and when Required’’ Basis. |
MWP2845NTCSA |
- |
2024-11-20 10:00 |
| The Supply and Delivery of the Schneider Ion8800 Meters for National Transmission Company South Africa on an "as and When" Required Basis for a Five (5) Year Period |
MWP2818NTCSA |
2024-11-06 10:00 |
2024-12-06 10:00 |
| The Design, Manufacture, Testing and Supply of Substation Clamps for Stranded and Tubular Conductor for a Period of Five (5) Years. |
MWP2648NTCSA |
2024-10-21 13:30 |
2024-12-05 10:00 |
| Supply, Delivery and Offload of Electrical Training Panels |
MWP2735DX |
2024-09-13 10:00 |
2024-10-01 10:00 |
| Supply, Delivery and Offload of Electrical Panels; 4 Geared Head Drill Presses and Shearing Guillotine at Eskom Academy of Learning in Midrand for a Period of Three 3 Months |
MWP2715CX |
- |
2024-09-20 10:00 |
| For
Supply, Delivery and Offload of Electrical Panels; 4 Geared Head Drill Presses and Shearing Guillotine at Eskom Academy of Learning in Midrand for a Period of Three 3 Months |
MWP2713 |
- |
2024-09-20 10:00 |
| 0402814 Trfr Distr:50 Kva;prim 6.6 Kv; Sec 400 V 10
0401057 Trfr Distr:200 Kva;dyn11;3;17.5-288 A 5 |
OLT2118066 |
- |
2024-08-30 23:00 |
| Supply Delivery and Installation of Electric Perforating Machines with Adjustable Wheels for a Period of Four (4) Months. |
MWP2555CX-R |
- |
2024-08-14 10:00 |
| Item No. Description Umc Estimated
Quantity Rate Total
0656275 Switchg:cstl;3.3 Kv;630 A;irtu;od;3r;20 Each 4
0724477 Shutter:red Louvre;580x73x60 Mm;steel Each 6
0724478 Shutter:red Louvre;430 X 77 X 59 Mm Each 5
0724479 Shutter:yellow Louvre;430 X 77 X 59 Mm Each 5
0724472 Shutter:yellow Louvre;580 X73 X 60 Mm Each 6
Totals |
OLT2117228 |
- |
2024-08-02 23:00 |
| The Design, Manufacture, Testing and Supply of Substation Clamps for Stranded and Tubular Conductor for a Period of Five (5) Years (re-issue) |
MWP2248NTCSA-R |
2024-08-07 11:30 |
2024-09-30 10:00 |
| Supply and Delivery of Various Cable Joint and Termination Kits on “an as and when Required” Basis for a Period of Three (3) Years for Gauteng Cluster (reverse E Auction) |
MWP2550DX. |
2024-05-17 10:00 |
2024-07-01 10:00 |
| Supply, Delivery, and Installation of Pernuma Electric Perforating Machines with Adjustable Wheels for a Period of Four (4) Months. |
MWP2555CX |
2024-05-28 11:00 |
2024-06-11 10:00 |
| Supply and Delivery of Various Cable Joint and Termination Kits on “an as and when Required” Basis for a Period of Three (3) Years for Gauteng Cluster (reverse E Auction) |
MWP2550DX |
2024-05-17 10:00 |
2024-05-27 10:00 |
| The Pre-qualification of the Original Equipment Manufacturers (oem) for the Manufacture, Supply, and Delivery of Estimated Requirements of Phase Conductors for the Eskom Overhead Lines to Eskom Distribution Division on an “as and When” Required Basis for a Period of One (1) Year. |
MWP2530DX |
2024-05-21 10:00 |
2024-05-30 10:00 |
| Supply and Delivery of Various Connectors. |
OLT2111455 |
- |
2024-04-25 23:00 |
| The Design, Manufacture, Testing and Supply (ex-works) of Neutral Electromagnetic Coupler Combined with Neutral Earthing Resistor and Auxiliary Transformers (necrt) on an “as and when Required” for Eskom Distribution |
MWP2418DX |
- |
2024-03-13 10:00 |
| Request for Information on Dry Type Surge Arrestors Applicable to Medium Voltage Induction Motors. |
MWP2410CX |
- |
2024-03-08 10:00 |