| Supply and Delivery of Regenerated
Mineral Insulating Oil, On-site
Regeneration of Mineral Insulating Oil,
On-site Drying of Transformer Windings
Insulation Using Low Frequency Heating
And Purification of Mineral Insulating
Oil During a 36-month Period on an as
And when Required Basis |
34978-5E |
- |
2026-08-07 11:00 |
| Appointment of a Service Provider for Insulating/testing as and when Required for 36 Months |
KZN/PRASA/2026/06/06/Q |
- |
2026-07-06 12:00 |
| The Supply and Delivery of Virgin Oil for Various Sub-stations in East Grid on an as and when Required for a Period of Three Years. |
E1540NTCSAEGR |
2025-08-21 10:00 |
2025-08-26 10:00 |
| For the Provision of Transformer No. 3 Purification at Pier 1 Container Terminal |
TPT/2025/06/0007/97473/RFQ |
2025-06-06 10:00 |
2025-06-11 12:00 |
| Supply and Delivery of Regenerated Mineral Insulating Oil, On-site Regeneration of Mineral Insulating Oil, on Site Drying of Transformer Windings Insulation Using Low Frequency Heating and Purification of Mineral Insulating Oil During a Thirty-six (36) Months Period on an as Required Basis. |
31291.5E |
- |
2025-05-23 11:00 |
| Supply and Delivery of Regenerated Mineral
Insulating Oil, On-site Regeneration of
Mineral Insulating Oil, On-site Drying of
Transformer Windings Insulation Using Low
Frequency Heating and Purification of
Mineral Insulating Oil During a 36-month
Period on an as and when Required Basis |
31291(5E) |
- |
2025-05-23 11:00 |
| For the Provision of Services for the Maintenance of Substation (durban Bbc) for Transnet Soc Ltd (reg. No. 1990/000900/30) Operating as Transnet Port Terminals (hereinafter Referred to as “tpt”) at the Port of Durban |
TPT/2025/04/0024/93645/RFQ |
- |
2025-04-15 12:00 |
| Diagnostic Testing of Insulating Oil During a
36-month Period on an as and when
Required Basis |
31290-5E |
- |
2025-04-17 11:00 |
| Annual Transformer Inspections and Oil Analysis, at Ushaka Marine World. |
RFQ LD 691 |
- |
2025-03-07 11:00 |
| Annual Transformer Inspections and Oil Analysis, at Ushaka Marine World. |
BS 695 |
- |
2025-03-07 11:00 |
| Repairing a Buchholz Relay, Oil Top Up, Testing and Purification of a 3kv Dc Traction Substation, at Transnet Freight Rail Ladysmith Depot, for a Period of One (01) Month |
TFR/2025/01/0009/86253/RFQ |
2025-01-30 10:00 |
2025-02-11 10:00 |