| Replacement of Existing Hvac Piping System |
RFQ-HVPS/2025 |
2025-04-30 10:00 |
2025-05-07 10:00 |
| Strucutral Works for Hvac Coring & Access. |
RFQ-CORING/2025 |
2025-04-30 10:00 |
2025-05-07 10:00 |
| Provision of Man-Lift Maintenance Contract for STS Man-Lifts of Ship to Shore Cranes at DCT Pier 1 and 2, for Transnet Soc Ltd Reg No. 1990/000900/30) Operating as Transnet Port Terminals (Hereinafter Referred as “TPT”) |
TPT/2025/04/0024/94629/RFP |
2025-04-30 10:00 |
2025-05-07 12:00 |
| Removal of Biological Growths on Masonry, Bricks Walls and Building Water Channels |
PMM/73/25/26 |
2025-04-30 09:30 |
2025-05-07 11:00 |
| Upgrading of Low Volume Gravel Roads with
The Use of Bitumen Stabilised Material (bsm
Base Layer) for the Roads and Stormwater
Maintenance Department in the North
Region of Ethekwini Municipality for 24
Months |
31187-1M |
2025-04-30 09:00 |
2025-05-23 11:00 |
| Upgrading of Low Volume Gravel Roads with
The Use of Bitumen Stabilised Material (bsm
Base Layer) for the Roads and Stormwater
Maintenance Department in the South
Region of Ethekwini Municipality for 36
Months |
31188-1M |
2025-04-30 09:00 |
2025-05-23 11:00 |
| Upgrading of Low Volume Gravel Roads with
The Use of Bitumen Stabilised Material (bsm
Base Layer) for the Roads and Stormwater
Maintenance Department in the West
Region of Ethekwini Municipality for 24
Months |
31190-1M |
2025-04-30 09:00 |
2025-05-23 11:00 |
| Fencing |
CSQ04254672 |
2025-04-29 11:00 |
2025-05-06 11:00 |
| Panel of Contractors for Maintenace and Repairs of Municipal Streetlights and Highmast (24 Months Contract) |
ULM-INFR 022/25 |
2025-04-29 11:00 |
2025-05-16 12:00 |
| Construction of Qitsi Bridge and Associated Roads (Re-Advert) |
DR. ABXLM/35/2024/25 |
2025-04-29 11:00 |
2025-05-28 12:00 |
| Construction of Qitsi Bridge and Associated Roads |
DR ABXLM/34/2024/25 |
2025-04-29 11:00 |
2025-05-28 12:00 |
| Diagnoses, Repairs, Replace of Gutters and Water Proofing Reception Dome |
DMSA 19-2024/25 |
2025-04-29 11:00 |
2025-05-05 11:00 |
| Request for Designing, Manufacturing, Supplying, Delivering, Installation, Testing, Calibration and Commissioning of 5 off Heavy Duty Cnc Controlled Milling Machines for the Durban Main Centre, for a Period of Five (5) Months. |
TE/2025/03/0010/90534/RFP |
2025-04-29 10:12 |
2025-05-20 11:00 |
| Day to Day Emergency Repairs |
DWF/CIDB REF/11/2025/2026/KZN |
2025-04-29 10:00 |
2025-05-12 11:00 |
| Day to Day Emergency Repairs |
DWF/CIDB REF/11/B/2025/2026/KZN |
2025-04-29 10:00 |
2025-05-12 11:00 |
| Day to Day Emergency Repairs |
DWF/CIDB REF/11/A/2025/2026/KZN |
2025-04-29 10:00 |
2025-05-12 11:00 |
| Day to Day Emergency Repairs |
DWF/CIDB REF/11/C/2025/2026/KZN |
2025-04-29 10:00 |
2025-05-12 11:00 |
| Construction of Stormwater Drainage for Chintsa Area 16 and 17 Phase 2 |
TECH/MIG:13/2024/25 |
2025-04-29 10:00 |
2025-05-06 11:00 |
| Supply and Install Burnt Wave Filter Equipment and Defective Reactor Coil at Cavendish Substation. |
CRAC DNR 51036 |
2025-04-29 10:00 |
2025-05-12 10:00 |
| Construction of Chapha Bridge and Associated Roads |
DR..ABXLM/33/2024/25 |
2025-04-29 10:00 |
2025-05-28 12:00 |
| Construction of West Coast National Park Management Offices at Langebaan Entrance Gate |
CI-GK-0128 |
2025-04-25 11:00 |
2025-05-15 11:00 |
| Refurbishment and Commissioning of 2 Extraction Units at Sabs Secunda |
201658 |
2025-04-25 11:00 |
2025-04-30 11:00 |
| Construction of Timber Footbridge at Glenmore Msibi Mtshali Section Ward 11 |
RFQ/110/015/2025 |
2025-04-25 11:00 |
2025-05-05 12:00 |
| Hvac System and Pumps Maintenance for Period of 60 Months for Airports Company South Africa at Bram Fischer Airport |
8685 |
2025-04-25 11:00 |
2025-05-09 11:00 |
| Provisioning of an Approved List of Service Providers for the Supply, Installation, Commissioning, Support and Delivery of National Radio Network Modernization for a Period of Three (3) Years on an “as and when Required” Basis. |
TFR/2025/04/0020/94115/RFP |
2025-04-25 11:00 |
2025-05-30 12:00 |
| Provision of the Employee Staff Transport Services for Transnet Soc Ltd (reg. No. 1990/000900/30) Operating as Transnet Port Terminals (hereinafter Referred to as for the Cape Town Container Terminal (ctct) and Cape Town Multi-purpose Terminal (ctmpt) for a Period of Thirty-six (36) Months. |
TPT/2025/02/0020/90356/RFP |
2025-04-25 11:00 |
2025-05-09 15:00 |
| Design, Supply, Installation (EPC Contractor) and Provide Planned Maintenance for a Limited Period for the Vapour Recovery Unit System at the TPL Tarlton Petroleum Products Handling and Bulk Storage Facility |
TPL/2024/07/0005/70943/RFP |
2025-04-25 11:00 |
2025-05-16 15:00 |
| Design, Supply, Installation (EPC Contractor) and Provide Planned Maintenance for a Limited Period for the Vapour Recovery Unit System at the TPL Tarlton Petroleum Products Handling and Bulk Storage Facility |
TPL/2024/07/0005/70943/RFP |
2025-04-25 11:00 |
2025-06-06 15:00 |
| Ladybrand: Constriction of a Slope Protection Using River or Reno Mattress to Protect Main Water Pipeline on a Bridge |
MLM 01/24/25-1 |
2025-04-25 11:00 |
2025-05-09 11:00 |
| Appointment of a Contractor for the Construction of Matjiesfontein Space Tracking Facility |
SO/084/04/2025 |
2025-04-25 10:00 |
2025-05-16 11:00 |
| Blinds & Tiling |
CSQ04254665 |
2025-04-25 10:00 |
2025-05-05 11:00 |
| Refurbishment of Radial Gates at the Barrage
At Phalaborwa Plant |
LNW 04/24/25 |
2025-04-25 10:00 |
2025-05-12 11:00 |
| Moorreesburg BNG Housing Development: Electrical Bulk Supply, LV Infrastructure and Housing Connections |
T26.24.25 |
2025-04-25 10:00 |
2025-05-23 12:00 |
| Supply, Delivery and Construction of Sheep Dip at Mcepheni Village in Ntabankulu Local Municipality of the Alfred Nzo District |
ALF 25/26-0007 |
2025-04-25 10:00 |
2025-05-05 11:00 |
| Supply, Delivery and Installation of Air Conditioners |
SCM/MLM/91/24-25 |
2025-04-25 10:00 |
2025-05-06 12:00 |
| The Periodic Maintenance (resurfacing) on National Route 12 Section 8 from Strydenburg (km 0.00) to Hopetown (km 52.09) |
NRA 2024/1398 |
2025-04-25 10:00 |
2025-05-26 12:00 |
| Manyatseng: Construction of 1km Paved Road and Stormwater |
ML,M 02/24/25 |
2025-04-25 10:00 |
2025-05-16 11:00 |
| The Supply, Installation, Calibration and Commissioning of Petrochemical Laboratory Equipment at Tpl Depots, (hereinafter Referred to as “tpl”), as a Once off Supply |
TPL/2025/03/0002/92213/RFP |
2025-04-25 10:00 |
2025-05-05 12:00 |
| Repair Dust Handling Plant Including Slide Gates and Double Flap Valves Refurbishment During
Various Outages and Opportunity Maintenance for the Period of 5 Years. |
E1117GXGPLET |
2025-04-25 09:30 |
2025-05-16 10:00 |
| Hiring of a 5 Ton Crane Truck with a Grab. |
RFQJW0058KM25 |
2025-04-25 09:00 |
2025-04-28 16:00 |
| Revamp Ablution Facilities at Dewatering, Lime Plant, Electrical W/shop and Unit 3 |
RFQJW057KM25 |
2025-04-25 09:00 |
2025-04-28 16:00 |
| The Request for Proposal and Subsequent Award of a Contract for a Turn-key Project for the Design, Supply and Installation of Solar Photovoltaic (pv) and Battery Energy Storage Systems (bess) at Westville Menston Road Office Complex. |
E1147DXKZN |
2025-04-25 09:00 |
2025-05-22 10:00 |
| Contractor Appointment for Rehabilitation of Runway 0220 and Taxiways at Bram Fischer International Airport for a Period of 12 Months. |
BFIA7839/2025/RFP |
2025-04-25 09:00 |
2025-05-21 12:00 |
| Repair and Maintenance: Steytlerville Library |
BEY-SCM-555 |
2025-04-24 14:30 |
2025-05-06 12:00 |
| Resurfacing and Rehabilitation of Roads for Period Ending June 2028 |
SCM/2025/35/ENG |
2025-04-24 14:00 |
2025-05-16 12:00 |
| Ebenezer: Construction of 114 Top Structures in Ebenezer Phase 1 Portion 3 |
SCM/2025/130/EDP |
2025-04-24 12:00 |
2025-05-09 12:00 |
| Professional Services for Witzenberg Municipality |
08/2/22/44 |
2025-04-24 11:00:00 |
2025-05-16 10:00:00 |
| Construction of Geelbek Multipurpose Events Centre in West Coast National Park |
CI-WK-0028 |
2025-04-24 11:00 |
2025-05-14 11:00 |
| Bid for the Supply, Delivery and Refurbishment of a Plunge Dipping Tank at Ncerha Skweyiya Village in Raymond Mhlaba Local Municipality of the Amathole District |
AD-25/26-0003 |
2025-04-24 11:00 |
2025-04-30 11:00 |
| Construction of Civil Engineering Services for Ebenezer Phase 4a - Portion 3 |
SCM/2025/128/EDP |
2025-04-24 11:00 |
2025-05-09 12:00 |