| Invitation to Submit Formal Written Price Quotation for Supply,
Deliver, and Installation of Insulated Modular Wall Panels for
Cold Storage and Food Processing Rooms for Table Mountain
National Park -sanparks |
31869/TMNP/2026-27RR |
2026-08-03 10:00 |
2026-08-10 11:00 |
| Installation of Kitchen Oven |
RFQ-1022-2026-07-198190 |
2026-08-05 10:00 |
2026-08-12 09:00 |
| - Stony Point Boardwalk |
WCNCB 05/07/2026 |
2026-08-04 11:00 |
2026-08-31 11:00 |
| Lim355 – Lepelle Nkumpi Prefabricated Office Accommodation |
IEC/LP-03/2026 |
2026-07-29 11:00 |
2026-08-17 11:00 |
| Supply, Deliver and Install 4mva, 11kv/22kv Star/star Transfomer with Open Bushings and Temperature Control |
T15../2026.. |
- |
2026-08-11 12:00 |
| Terms of Reference (tor) for the Procurement of Design and Build (turnkey)
Contractor for Demolition of Existing Units and Construction of New
Prefabricated Housing Units at the Hawequa and Obiqua Correctional
Centres at Allandale Management Area. |
DCS06WCAR005_R |
2026-08-04 10:00 |
2026-08-17 12:00 |
| Appointment of Service Provider for Construction of Two Prefabricated Houses. Re-issue |
RFQ31963a/2026-27MPNP |
- |
2026-08-07 11:00 |
| Supply, Delivery, Installation, Commission, and Handover of Twenty-two (22) 3kva and One (1) 10kva Transformer-based and Tropicalised Uninterruptible Power Supply (ups) in Substations, Railyard Points, Berth 208/209 Control Desks, and Buildings in the Por |
TNPA/2026/07/0003/114599/RFQ |
2026-08-10 10:00 |
2026-08-24 12:00 |
| Supply and Delivery of Under Pressure Drilling Machine |
RFQJW0084SM2026 |
- |
2026-07-30 16:00 |
| The Design, Manufacture, Supply, and Installation of Various Fuel Infrastructure Ortia at O. R. Tambo International Airport. |
RFQ 74415 |
- |
2026-08-24 12:00 |
| Design, Supply, Install, Commission
And Maintain a Solar Pv Plant,
At King Shaka International Airport |
KSIA8192/2026/RFP |
2026-07-30 10:00 |
2026-09-22 12:00 |
| The Provision of Outside Plant Mv Switchgear Upgrade at Arnot Power Station for a Period Of
3 Years |
E3263GXPARN |
2026-07-30 10:00 |
2026-08-21 10:00 |
| Supply, Delivery and Replacement of Complete 150l Elctric
Geyser and Trays |
RFQJW033NS26-27 |
2026-07-31 11:30 |
2026-08-06 16:00 |
| Simmerpan Complex Dc Workshop and Battery Room Upgrade. |
E2391NTCSAMWPR |
2026-07-14 10:00 |
2026-08-28 10:00 |
| The Request for Qoutation for the Refubishment and Reinstatement of Support Infrastructure for the Bravo and Charlie Apron Aircraft Docking System at Cape Town International Airport for a Period of 18 Months |
Re-advertised RFQ73873 |
2026-07-30 11:00 |
2026-08-21 16:00 |
| Provision of Materials and Construction of Temporary Emergency Housing Structures (9m, 15m & 24m) for a Period until 30 June 2029 |
PDHS 1/2026 |
2026-07-30 10:00 |
2026-08-20 10:00 |
| Supply and Installation of Drinking Fountain at Uys Krige Dog Park |
SB12700001 |
- |
2026-08-06 14:00 |
| Design, Manufacture, Installation and Commissioning of the New Sulphuric Acid Bulk Tank at Duvha Power Station for a Period of 10 Months. |
E3048GXMPDUV |
2026-06-22 11:00 |
2026-08-28 10:00 |
| The Provision of Outside Plant Mv Switchgear Upgrade at Arnot Power Station for a Period Of
3 Years |
E3263GXPARN |
2026-07-30 10:00 |
2026-08-21 10:00 |
| Provision of Materials and Construction of Temporary Emergency Housing Structures (9m², 15m² & 24m²) for a Period until 30 June 2029 |
PDHS 1/2026 |
2026-07-30 10:00 |
2026-08-20 10:00 |
| Engine Cover & Starter Motor |
CSQ07265756 |
- |
2026-07-30 11:00 |
| Supply and Delivery of Certified Lifting, Rigging, Wire Rope and Load Securing Equipment for Mohoma on an “as and When” Required Basis for a Period of Twelve (12) Months for Transnet Dreding Services |
TNPA/2026/07/1608/9037/RFQ |
- |
2026-07-29 11:00 |
| Supply and Install of Wendy House Guard for Municipal Offices |
8/2/1/631 |
- |
2026-08-06 12:00 |
| Rfq-grantham Substation Panel Wiring by 30 July 2026 |
7000016842- (SC10106613) |
2026-07-27 09:00 |
2026-07-30 12:00 |
| Supply, Deliver, Install and Commissioning of Energy Metering Panels at Driefontein Wastewater Treatment Works |
RFQJW027NS26-27 |
2026-07-22 10:00 |
2026-07-29 16:00 |
| Supply and installation of drinking fountain at uy |
SB12700001 |
- |
2026-08-06 14:00 |
| Supply,delivery,installation and Commissioning of a 3 Ton/hour Vegetable Pack Line at Mor Farming Project,bloemhof,dr Rsm |
13 DARD 04/2026 |
2026-08-06 11:00 |
2026-08-17 11:00 |
| Request for Quotation to Supply, Deliver, Install Furnace Spout and Line the Furnace Lid Cidb Me1 |
NLM-KWT-26/012 |
- |
2026-07-24 16:00 |
| Install Hydroboil |
CSQ07265751 |
- |
2026-07-29 11:00 |
| Rfq-test & Installation of 4,5kv Sheath Voltage Limiter at Neptune Take-off and Neptune Subs by 29 July 2026 |
7000016826 – (SC10106159) |
2026-07-24 12:00 |
2026-07-29 12:00 |
| Kzn: Department of Education: Ethekwini Region: Hammarsdale:sinenzuzo Primary School: Water and Sanitation Phase 03: (contractual Part A). |
ZNTD 06378W |
- |
- |
| Procurement of a Contractor for the Supply, Delivery and Installation of Led Lights at the Shade Parking, Fire Station, Receivers, 11 Substation, Vor Glide Path 11 and 29 at King Phalo Airport |
RFQ 12118 |
2026-07-28 11:00 |
2026-08-07 12:00 |
| Appointment of a Panel of Service Providers (three) for the Audit, Supply, Installation, Replacement, Maintenance and Management of Water and Electricity Meters Including Smart Metering, Amr/ami Systems and Revenue Enhancement Services for a Period of Twelve (12) Months |
SCM 010 2025/26 |
- |
2026-08-11 16:00 |
| Design, Supply, Installation, Testing and Commissioning of a Commercial Inclined Wheelchair Platform Stair Lift to Improve Accessibility to the Mpl Lounge Within the Johannesburg City Hall Building |
10068481 |
2026-07-23 10:00 |
2026-08-05 11:00 |
| Installation of Services in Containers as Per Specification |
ump0356-26-27 |
- |
2026-07-24 11:00 |
| Once off Supply, Delivery and Installation of Office Furniture for the Department of Land Reform and Rural Developmen: Eastern Cape Deeds Registry: Qonce |
DLRRD (CRD-05) 2026/27 |
2026-08-03 12:00 |
2026-08-12 11:00 |
| Service |
CSQ07265734 |
- |
2026-07-23 11:00 |
| For the Supply, Install and Commission High Voltage Switchgear on as and when Required in the Port of Cape Town for Period of Sixty (60) Months |
TNPA/2026/07/0002/114557/RFQ |
2026-07-15 10:30 |
2026-07-29 16:00 |
| Appointment of a Suitably Qualified Contractor for Supply, Delivery, Installation and Commissioning of 450kva Diesel Standby Generator at Fidel Castro Building in Bloemfontein on Behalf of the Free State Department of Public Works and Infrastructure |
DPWFS (T) 005/2026 |
2026-07-29 11:00 |
2026-08-24 11:00 |
| Re-advertisement: Once off Supply and Delivery and Assembling of a Bulk Filling System |
JGDM2026/27-RFQ-01 |
- |
2026-07-23 12:00 |
| Supply, Delivery, Install & Commission Kitchen Equipment Re-advert |
UMH 44-26-27 |
- |
2026-07-24 11:00 |
| Supply,delivery,install & Commission Macerator Machine |
UMH 55-26-27 |
2026-07-22 10:30 |
2026-07-24 11:00 |
| Bid to Supply, Delivery, Install, Commission, Maintain and Provide Training on One Laser Particle Size with Dynamic Image Analyser for Nuclear Materials Research Group |
FIN-SCM-TEN-0244 |
- |
2026-08-19 11:00 |
| Appointment of a Service Provider to Supply and Install Under-counter Geyser in Building 41 and 42 Csir Campus |
DSTI16/24/ 2026-27 |
2026-07-27 11:00 |
2026-07-31 11:00 |
| 14216 Supply and Deliver |
QUO/14216/2026 |
- |
2026-07-23 00:00 |
| Rfq - Supply and Install Submersible Pumps Closing Date 27 July 2026 |
7000016776 – (SC10106391) |
- |
2026-07-27 12:00 |
| Wcghcc0065/2026 the Supply, Delivery, Installation, Demonstration and Commissioning of a State-of-the-art Digital Mobile C-arm Fluoroscopy Radiographic Unit for Mitchells Plain Hospital |
WCGHCC0065/2026 |
- |
2026-08-14 11:00 |
| Wcghcc0066/2026: the Supply, Delivery, Installation, Demonstration and Commissioning for the Camera Surgical Stack for Laparoscopic Surgery Hd (insufflator, Camera Processor, Trolley / Cart, Bracket and Monitor) Including Scope for the Mitchells Plain Hospital |
WCGHCC0066/2026 |
- |
2026-08-14 11:00 |
| Request for Designing, Manufacturing, Supplying, Delivering, Installation, Testing, Calibration and Commissioning of Two (2) off Heavy-duty Cnc Controlled Portal Type Milling Machines for the Durban Main Centre, for a Period of Seven (7) Months. |
TE2026/06/2403/7352RFP |
2026-07-23 10:00 |
2026-08-18 16:00 |
| Request for Proposal [rfp] Provision of Design, Manufacture and Supply of Cold Heat Exchanger for Sulphuric Acid a Plant |
FOSRBY-RFP-05-26/27 |
2026-07-24 09:30 |
2026-08-11 12:00 |