| The Hiring, Installation and Operation of Suspended Platforms and Mobile Lifts on an “as and When” Required Basis for a Period of Five Years at Kriel Power Station |
E2969GXMPKRI |
- |
2026-07-06 10:00 |
| Inspection, Repairs, Fabricate, Supply and Install of Ceramic Lined Pulverised Fuel
Pipes, Hangers and Supports at Kriel Power Station Over a Period of Five (5) Years |
E2806GXMPKRI |
2026-05-05 10:00 |
2026-05-19 10:00 |
| Inspection, Repairs, Fabricate, Supply and Install of Ceramic Lined Pulverised Fuel Pipes, Hangers and Supports at Kriel Power Station Over a Period of Five (5) Years |
E2806GXMPKRI |
2026-05-05 10:00 |
2026-08-04 10:00 |
| Supply Two New Fire Diesel Engines, Install and Commission the Engines |
E2731GXMPMAT |
2026-04-02 11:00 |
2026-04-10 10:00 |
| Detail Design, Manufacturing, Construction, Factory Acceptance Testing, Transporting, Offloading, Installation, Site Acceptance Testing and Commissioning of Eight (8) New Diesel Generators (400kva) for U3-u6 at Kriel Power Station |
E2279GXMPKRI |
2025-12-18 10:00 |
2026-01-22 10:00 |
| Detail Design, Manufacturing, Construction, Factory Acceptance Testing, Transporting,
Offloading, Installation, Site Acceptance Testing and Commissioning of Eight (8) New
Diesel Generators (400kva) for U3-u6 at Kriel Power Station |
E2279GXMPKRI |
2025-12-18 10:00 |
2026-01-30 10:00 |
| Refurbishment of Kriel Ps Generator Circuit Breaker (gcb) Compressor Plant Control Circuit at Units 1 & 4 for a Period of 12 Months at Kriel Power Station |
E2192GXMPKRI |
2025-11-25 09:00 |
2025-12-11 10:00 |
| Supply, Delivery and Installation of Canteen Equipment at Kriel Power Station on a Once-off Basis. |
E1685GXMPKRI |
2025-09-03 09:00 |
2025-09-16 10:00 |
| The Supply and Installation of Cooling Water Pump Discharge Hydraulic Operated Weight Assisted/ Auto Close Valves System Spares and Maintenance Services for a Period of 10 Months. |
MPKRI11460GX |
2025-02-26 10:00 |
2025-03-18 10:00 |
| The Procurement and Installation of 3x Lp Heaters 4 for a Period of 5 Years on an as and when Required Basis at Kriel Power Station. |
MPKRI11468GX |
2025-02-13 10:00 |
2025-03-31 10:00 |
| Supply and Installation of Coal Bunkers Level Indicators at Kriel Power Station for a Period of 12 Months |
MPKRI11188GX |
2024-07-02 09:00 |
2024-08-15 10:00 |
| The Supply and Installation of Boiler Water Circulating Pump (bwcp)
Monitoring and Measurement Instrumentation (differential Pressure,
Temperatures and Flow) and Interfacing the New Signals to the T3000 Dcs For
Monitoring of the Circulation Pump System on the Hmi View Displays for Kriel
Power Station 4 Units for a Period of 2 Two Years |
MPKRI11134GX |
- |
2024-07-22 10:00 |