| The Provision of Routine Maintenance on Roads P96 (from Km 0.00 to Km 8.25) and P426 (from 0.00 to Km 6.26) in the Ethekwini Metro, Durban Region, for a Period of 36 Months. Cidb Grade 7ce or Higher |
ZNB2487/00000/00/MET/INF/24/T |
2024-09-19 10:00 |
2024-10-23 11:00 |
| The Provision of Routine and Safety Maintenance on Various Roads Within Inanda Zone in the Ethekwini Metro, Durban
Region, for a Period of 36 Months. Cidb Grade 8ce or Higher |
ZNB02329/00000/00/MET/INF/24/T |
2024-09-17 10:00 |
2024-10-21 11:00 |
| The Provision of Zonal Contract on Various Roads - Zone One (inner West Area) Pinetown and Shongweni Within Metro District Office Under Ethekwini Municipality, (cost Centre Metro), Durban Region for Grade 8ce or Higher – 36 Months Contract Cidb Grade 8ce or Higher |
ZNB02293/00000/00/MET/INF/23/T: |
2024-09-25 10:00 |
2024-10-25 11:00 |
| The Provision of Zonal Contract on Various Roads - Zone Three (outer West Area)ngcolosi and Molweni Within Metro District Office Under Ethekwini Municipality, Kzn Department of Transport: for Grade 8ce or Higher – 36 Months Contract
Cidb Grade 8ce or Higher |
ZNB02292/00000/00/MET/INF/23/T |
2024-09-25 10:00 |
2024-10-25 11:00 |
| For Bay 60 Foundation Repairs for Durban Main Centre |
TE/2024/08/0002/755010/RFQ |
2024-09-05 09:00 |
2024-09-12 11:00 |
| The Provision of Routine and Safety Maintenance on Various Roads Within Umbumbulu Zone in the Ethekwini Metro, Durban
Region, for a Period of 36 Months. Cidb Grade 8ce or Higher |
ZNB02289/00000/00/MET/INF/24/T |
2024-09-13 10:00 |
2024-10-16 11:00 |
| The Provision of Routine and Safety Maintenance on Various Roads Mt Edgcecombe Zone in the Ethekwini Metro, Durban Region, for a Period of 36 Months.
Cidb Grade 8ce or Higher |
ZNB02330/00000/00/MET/INF/24/T |
2024-09-13 10:00 |
2024-10-16 11:00 |
| Betterment and Regravelling of Local Road L1282 (from Km 0.00 to Km 4.86) in the Ethekwini Metro Under Durban Region.
Grade 4ce or Higher |
ZNB02422/00000/00/MET/INF/24/T. |
2024-09-09 10:00 |
2024-10-14 11:00 |
| Construction Monitoring and Supervision of
The Construction of the Go! Durban Irptn
Right of Way (row) Along Qashana
Khuzwayo, Between Cherry Road and
Crompton Road |
1T-27626 |
2024-08-26 10:00 |
2024-09-20 11:00 |
| Wmmf Landfill Cell 1 Lined Dams and
Platforms Construction |
ZE-30109 |
2024-08-26 11:00 |
2024-09-20 11:00 |
| Pinkney Park Reservoir Outlet: Construction
Of 2km of 240mm Diameter Steel Reservoir
Outlet Pipeline from Pinkney Park Reservoir
To End Road – Wards 9 & 10 |
5W-30361 |
- |
2024-09-20 11:00 |
| Professional Services for the Design and
Construction Monitoring of Storm Damage
Repairs at Glebelands |
1H-28596 |
2024-08-26 11:00 |
2024-09-27 11:00 |
| Tambo Plaza Housing Project: Construction of
Mbuso Shangase Way, 120908 Street and
48511 Track in Inanda, Ward 57 |
1R-29989 |
2024-08-26 10:30 |
2024-09-20 11:00 |
| Cscm Framework Contract for the Repair and
Rehabilitation of Civil and Structural Works
Related to River, Coastal and Stormwater
Infrastructure |
F21 – CSCM FRAMEWORK CONTRACT |
- |
2024-10-04 11:00 |
| Trench Excavations and Ancillary Works to Enable Fibre
Installation in the Port of Durban |
TNPA/2024/04/0005/63587/RFP |
2024-08-26 10:00 |
2024-09-09 16:00 |
| Betterment & Regravelling on District Road D12 from Km 0.00 to Km 2.23 in the Ethekwini Metro, Under Durban Region Cidb Grade 3ce or Higher |
ZNB02409/00000/00/MET/INF/24/T |
- |
2024-09-10 11:00 |
| Betterment & Regravelling on District Road D2277(from Km 0.00 to Km 2.2) in the Ethekwini Metro Under Durban Region. Cidb Grade 3ce or Higher |
ZNB02460/00000/00/MET/INF/24/T |
2024-08-16 10:00 |
2024-09-06 11:00 |
| Betterment and Gravelling on Road D391 from Km 0.00 to Km 2.35 in the Ethekwini Metro, Durban Region.
Cidb Grade 3ce or Higher |
ZNB02405/00000/00/MET/INF/24/T |
2024-08-14 10:00 |
2024-09-04 11:00 |
| Zntd03290w :wims 058802 :kwazulu Natal :department of Education: Vukuzakhe High School: the Appiontment of a Multi-disciplinary Entity to Provide a Professional Team Consisting of an Architect, Civil and Structural Engineer, Mechanical Engineer and Electrical Engineer for Repairs and Renovations Project. |
ZNTD03290W |
- |
2024-08-28 11:00 |
| Saps: Pinetown: Planning and Design of the Laboratory for the Proposed Construction |
DBN24/07/02 |
2024-08-06 10:00 |
2024-09-02 11:00 |
| Hammarsdale High Level Reservoir Inlet Phase
2: Construction of Approximately 2700m Long
500mm Ø Steel Inlet-main from Existing Phase
1 Pipeline to Hammarsdale High Level
Reservoir: Wards No. 04 & 103 |
WS-7837 |
2024-07-26 10:00 |
2024-08-30 11:00 |
| Professional Services for the Design and
Construction Monitoring of 260 New Units at
Glebelands Community Residential Units
(cru) |
1H-25915 |
2024-07-26 11:00 |
2024-08-23 11:00 |
| Sourcing of a Turnkey Contractor (engineer, Procure and Construct) for the Rehabilitation of District Road D521 from Km 0.000 to Km 6.455 in the Ethekwini Metro Under Durban Region Grade 8 or Higher |
ZNB02442/00000/00/DUR/INF/24/T |
2024-08-05 10:00 |
2024-08-30 11:00 |
| Sourcing of a Turnkey Contractor (engineer, Procure and Construct) for the Light Rehabilitation of Main Road P197-3 from Km 0.000 to Km 3.500 in the Ethekwini District Under Durban Region for Grade 7ce or Higher |
ZNB02445/00000/00/DUR/INF/24/T |
2024-08-05 10:00 |
2024-09-06 11:00 |
| Betterment and Regravelling on Road L2724 from Km 0.00 to Km 3.5 in the Ethekwini Metro, Durban Region.
Cidb Grade 3ce or Higher |
ZNB2425/00000/00/MET/INF/24/T. |
2024-07-17 10:00 |
2024-08-08 11:00 |
| Betterment & Regravelling on Local Road L2727 from Km 0.00 to Km 1.35 in the Ethekwini Metro Under Durban Region.
Cidb Grade 3ce or Higher |
ZNB02404/00000/00/MET/INF/24/T: |
2024-07-10 10:00 |
2024-07-24 11:00 |
| Betterment and Regravelling of Local Road L1282 from Km 0.00 to Km 4.86 in Ethekwini Metro Under Durban Region
Grade 3ce or Higher |
ZNB02422/00000/00/MET/INF/24/T |
2024-07-11 10:00 |
2024-07-30 11:00 |
| Contractor Appointment for Design and Construction of Tarred Emergency Access Roads for a Period of 20 Months at King Shaka International Airport. |
KSIA7553/2024/RFP |
2024-07-26 12:00 |
2024-08-26 12:00 |
| The Supply and Installation of the Fire Protection System in Island View Berth 9 - Port of Durban. |
TNPA/2024/03/0015/60248/RFP |
- |
2024-09-10 16:00 |
| Upgrade of Sbusisiwe Road, Phase 2 - Gravel
To Surface: Ward 42 |
1R-29892 |
2024-07-12 10:30 |
2024-07-19 11:00 |
| Equality Street, Chatsworth, Ward 73:
Stormwater Upgrades |
1D-29865 |
2024-07-12 10:00 |
2024-07-19 11:00 |
| Stormwater Upgrade on Corner of Strawberry
And Raspberry Roads, Umlaza P, Ward 85 |
1D-29851 |
2024-07-12 10:00 |
2024-07-19 11:00 |
| Betterment & Re-gravelling on Local Road
L3560 from (km 0.00 to Km 2.16) in the Ethekwini Metro Under the Durban Region for Grade 3ce or Higher. the Duration of the Project is 03 Months. |
ZNB02402/00000/00/MET/INF/24/T |
2024-07-23 10:00 |
2024-08-15 11:00 |
| Betterment
And Re-gravelling of District Road D1072 (from Km 2.19 to Km 8.56) in the Ethekwini Metro Under Durban Region. Cidb Grade 4ce or Higher
The Duration of the Project is 3 Months |
ZNB02421/00000/00/MET/INF/24/T |
2024-07-23 10:00 |
2024-08-20 11:00 |
| Betterment and Regravelling on Road L2724 from Km 0.00 to Km 3.5 in
The Ethekwini Metro, Durban Region.
Cidb Grade 3ce or Higher, the Duration of the Project is 3 Months |
ZNB2425/00000/00/MET/INF/24/T |
2024-07-17 10:00 |
2024-08-08 11:00 |
| Betterment &
Reg-ravelling on Local Road L640 (from Km 0.00 to Km
3.46) in the Ethekwini Metro Under Durban Region.
Cidb Grade 3ce or Higher - Duration of the Project 3months |
ZNB02403/00000/00/MET/INF/24/T |
2024-07-18 10:00 |
2024-08-13 11:00 |
| Betterment and Re-gravelling of Local Road L633 (from Km 0.00 to Km 5.84) in the Ethekwini Metro Under Durban Region, Cidb Grade 3ce or Higher, the Duration of the Project is 3 Months. |
ZNB02401/00000/00/MET/INF/24/T |
2024-07-16 10:00 |
2024-08-06 11:00 |
| Betterment &
Regravelling on Local Road L2727 from Km 0.00 to Km 1.35
In the Ethekwini Metro Under Durban Region for
Grade 3ce or Higher |
ZNB02404/00000/00/MET/INF/24/T |
2024-07-10 10:00 |
2024-07-26 11:00 |
| : Betterment &
Regravelling on Local Road L1274 from Km 0.00 to Km 1.84
In the Ethekwini Metro Under Durban Region for Grade 3ce or Higher |
ZNB02424/00000/00/MET/INF/24/T |
2024-07-11 10:00 |
2024-07-30 11:00 |
| Betterment and Regravelling of Local
Road L1282 from Km 0.00 to Km 4.86 in Ethekwini Metro Under Durban Region, Grade
3ce or Higher |
ZNB02422/00000/00/MET/INF/24/T |
2024-07-10 10:00 |
2024-07-30 11:00 |
| Betterment & Regravelling on District Road D1505 from
Km 0.00 to Km 2.18 in Ethekwini Metro Under Durban
Region for Grade 3ce or Higher |
ZNB02406/00000/00/MET/INF/24/T |
2024-07-10 10:00 |
2024-07-24 11:00 |
| Managing Contractor for the Implementation of Ward-based Community Infrastructure Projects (cip), for the South Regions Within Ethekwini for 36 Months |
1S-29531 |
2024-07-02 11:00 |
2024-08-02 11:00 |
| Managing Contractor for the Implementation of Ward-based Community Infrastructure Projects (cip), for the Central Region Within Ethekwini for 36 Months |
1S-29529 |
2024-07-02 10:00 |
2024-08-02 11:00 |
| Managing Contractor for the Implementation of Ward-based Community Infrastructure Projects (cip), for West 2 Region Within Ethekwini for 36 Months |
1S-29527 |
2024-07-02 10:00 |
2024-08-02 11:00 |
| Managing Contractor for the Implementation of Ward-based Community Infrastructure Projects (cip), for West 1 Region Within Ethekwini for 36 Months |
1S-29525 |
2024-07-02 10:00 |
2024-08-02 11:00 |
| Managing Contractor for the Implementation of Ward-based Community Infrastructure Projects (cip), for North Region Within Ethekwini for 36 Months |
1S-29522 |
2024-07-02 10:00 |
2024-08-02 11:00 |
| The Reinstatement of Earth Retaining Structures Using Cellular Honeycomb Cells, Construction of Gabions and Concrete Lined V-drains at the Klaarwater Substation, in Ward 63 |
2V-29717 |
2024-06-28 10:00 |
2024-07-05 11:00 |
| Work Package 1 for Trk 93328 in Siweni Area, Ward 1, Outer West |
3R-23939 |
2024-06-28 10:00 |
2024-07-05 11:00 |
| Wims 074566: Kwazulu-natal: Department of Health: Ethekwini Region: to Provide a Professional Team Consisting of an Architect, Quantity Surveyor, Civil and Structural Engineer, Mechanical Engineer, Electrical Engineer, Town Planner, Health & Safety Agent and Geotech Specialist for General Justice Gizenga Mpanza Regional Hospital (gjgmrh) – Construction of Intern Doctors Accommodation |
ZNTD 05096W |
2024-07-10 10:00 |
2024-07-24 11:00 |
| Wims 077448: Kwazulu-natal: Department Transport: Ethekwini Region: Rossburgh Dltc (mlb): the Appointment of a Multi – Disciplinary Entity to Provide a Professional Team Consisting an of Architect, Quantity Surveyor, Civil and Structural Engineer, Land Surveyor, Geotechnical Engineer, Mechanical Engineer, Electrical Engineer and Health and Safety Agent for the Constructin of New Rossburgh Dltc (mlb) Building |
ZNTD 05359W |
- |
2024-07-23 11:00 |