| Project: Framework Agreement for Appointment of Professional Service Providers: Provision of Consulting Engineering Services: Infrastructure Projects |
MISA/FC/RSS/014/2023/24 |
2024-01-23 10:00 |
2024-02-08 11:00 |
| Establishment of a Panel of Contractors for the Construction, Rehabilitation, Refurbishment, Repair Operation and Maintenance of Municipal Roads and Stormwater Infrastructure Within the Geographic Regions in South Africa. |
MISA/E OI/RSI/017/2023/24 |
2024-01-24 10:00 |
2024-02-09 11:00 |
| Procurement of Potholes Maintenance and Repairs |
TMDM/POTH/TECH/01/11/2023 |
2023-11-27 14:00 |
2023-12-08 12:00 |
| Appointment of a Contractor for the Construction of Toilets and Sewer Network Repair in Gortin Phase 1 |
06/2023/24 |
2023-11-20 10:00 |
2023-12-11 11:00 |
| Clocolan/Hlohlolwane: Reconstruction of 2 km Surface Road and Stormwater Drainage |
T02 (23/24) |
2023-09-04 11:00 |
2023-09-20 12:00 |
| Ficksburg/Meqheleng: Reconstruction of 1.3 km Surface Road and Stormwater Drainage |
T01 (23/24) |
2023-09-04 13:00 |
2023-09-20 12:00 |
| Kgotsong: Construction of Paved Road and Stormwater Channel in Sebotsa and Monnamoncho Road |
NLM/TS/008/2022-23 |
2023-05-02 10:00 |
2023-05-22 12:00 |
| Panel for Maintenance of Wastewater Treatment Plants and Pump Stations for a Period of 36 months, as and when needed |
NLM/TS/010/2022-23 |
2023-04-13 10:00 |
2023-04-26 12:00 |
| Erratum- Installation of the Internal Water and Sewer Reticulation Network in Extension 7 in Senekal/Matwabeng. |
T15(2022/2023) |
- |
2023-03-23 12:00 |
| Nyakallong: Construction of 1.567km Stormwater System- Phase 2B |
BID/33/2022-23 |
2023-03-17 13:00 |
2023-04-11 12:00 |
| Nyakallong: Construction of 2.376km Stormwater System- Phase 2A |
BID/32/2022-23 |
2023-03-17 13:00 |
2023-04-11 12:00 |
| The Upgrading of the 3 km Gravel Roads to Surfaced Roads in Matjhabeng LM MMamahabane: Ward 1 |
BID/31/2022-23 |
2023-03-17 09:00 |
2023-04-11 12:00 |
| Appointment of a Contractor for the Construction of Block Paved Roads and Stormwater in Zamdela Township Ward 08 |
MLM 19/2022/23 |
- |
2023-03-29 11:00 |
| Appointment of a Contractor for the Construction of Block Paved Roads and Stormwater in Gortin Township Ward 01 |
MLM 18/2022/23 |
- |
2023-03-28 11:00 |
| Installation of the Internal Water and Sewer Reticulation Network in Extension 7 in Senekal/Matwabeng |
T15 (22/23) |
2023-02-28 11:00 |
2023-03-20 12:00 |
| Provision of Bulk Sewerage Handling Infrastructure in Matjhabeng LM: Whites |
BID/26/2022-23 |
2023-02-16 09:00 |
2023-03-02 12:00 |
| The Upgrading of the 3km Gravel Roads to Surfaced Roads in Matjhabeng LM: Kutlwanong - Ward 18 |
BID/25/2022-23 |
2023-02-17 12:00 |
2023-03-13 12:00 |
| The Upgrading of the 3km Gravel Roads to Surfaced Roads in Matjhabeng LM: Nyakallong - Ward 36 |
BID/24/2022-23 |
2023-02-17 09:00 |
2023-03-13 12:00 |
| Rehabilitation of 1.242km Long Constantia Road Between Moshoeshoe Drive and Road 200 in Thabong |
BID/15/2022-23 |
2022-12-05 15:00 |
2022-12-14 12:00 |
| Lifting of 125m Long Part of Fiskaal Street and Associated Stormwater Drainage |
BID/14/2022-23 |
2022-12-05 12:00 |
2022-12-14 12:00 |
| Construction of 150m Long Stormwater Drainage Including Block Paving in Las Vegas at Road THB 07 |
BID/13/2022-23 |
2022-12-05 09:00 |
2022-12-14 12:00 |
| Upgrading of Gravel Roads to Paved Roads in Namahadi |
MAF105/2022/23 |
2022-11-28 12:00 |
2022-12-14 11:00 |
| Construction of Emergency Storage Ponds in Namahadi/Frankfort |
MAF104/2022/23 |
2022-11-28 10:00 |
2022-12-14 11:00 |
| Management of High Water Table in Two Room Section |
NLM/005/2022-2023 |
2022-08-08 12:00 |
2022-08-29 12:00 |
| Upgrading of Outfall Sewer Phase 2 |
NLM/TS/003/2022-2023 |
2022-08-08 10:00 |
2022-08-29 12:00 |
| Upgrading of the Golf Course Outfall Sewer Pipe in Senekal/Matwabeng |
T 20 (21/22) |
2022-06-24 10:45 |
2022-07-15 12:00 |
| Construction of the 11 MI/day Water Treatment Works (Civil Works) in Senekal/Matwabeng |
T 19 (21/22) |
2022-06-24 10:00 |
2022-07-15 12:00 |
| Construction of the Cyferfontein Abstraction Works (Civil works) in Senekal/Matwabeng |
T 18 (21/22) |
2022-06-24 10:00 |
2022-07-15 12:00 |
| Appointment of Service Providers for Upgrading of Villiers Ground |
MAF102/2021/22 |
- |
2022-06-14 11:00 |
| Appointment of a Panel of Professional Service Providers in the Built Environment that have Capacity to Implement IDP and Capital Projects for Ngwathe Local Municipality on as and when Required Basis for a Period of 36 Months |
NLM: TEC: 51/22/22 |
- |
2022-03-18 12:00 |
| Kwakwatsi Township Secondary Bulk Water Pipelines Upgrade |
NLM: TEC-KWAKWATSI(BULKWATER)-2022 |
2022-03-08 10:00 |
2022-03-18 12:00 |
| Construction of Block Paved Roads and Stormwater in Zamdela Township Ward 10 Phase 2 (Re-Advert) |
14/2021/22 |
- |
2022-03-24 11:00 |
| Construction of Block Paved Roads and Stormwater in Zamdela Township Ward 5 (Re-Advert) |
13/2021/22 |
- |
2022-03-15 11:00 |
| Construction of the Refurbishment of Galvanised Pipes to UPVC Pipes in Zamdela Township (Re-Advert) |
22/2021/22 |
- |
2022-03-08 11:00 |
| Construction of Paved Roads and Stormwater in Namahadi: Phase 4 (Re-Advert) |
SCM/BID 26/2021/22 |
2022-01-28 11:00 |
2022-02-10 10:00 |
| Appointment of Service Provider: Construction of 3ML Reservoir in Matebeleng, Qwa-Qwa |
SCM/BID 22/2021/22 |
2022-01-28 10:00 |
2022-02-24 10:00 |
| Upgrading of the Golf Course Outfall Sewer Pipe in Senekal/Matwabeng |
T11 (21/22) |
2022-01-11 13:00 |
2022-01-03 12:00 |
| Construction of a Dedicated Clean Water Distribution Pipeline from the 6.5ML Concrete Water Reservoir in Villiers |
MAF100/2021/22 |
2021-11-17 11:00 |
2021-12-10 11:00 |
| Petsana: Upgrading of 4km Sewer Outfall Phase 2 |
NKT216/2021 |
2021-11-04 11:00 |
2021-11-16 12:00 |
| Arlington: Replacement of 6km of Water Pipelines |
NKT215/2021 |
2021-11-05 11:00 |
2021-11-16 12:00 |
| Construction of the Refurbishment of Galvanised Pipes to UPVC Pipes in Zamdela Township |
09/2021/22 |
- |
2021-10-27 11:00 |
| Appointment of Service Provider: Chris Hani Park Water Network: Installation of Supply Line and Water Reticulation for 500 Stands Phase 1 |
SCM/BID17/2021/22 |
2021-10-15 10:00 |
2021-11-11 10:00 |
| Construction of Themba Kubheka Bulk Electrical Supply Full Phase (Vaaldam Substation Upgrade and Reticulation) |
12/2021/22 |
- |
2021-11-04 11:00 |
| Construction of Block Paved Roads and Stormwater in Metsimaholo Township Ward 5 |
11/2021/22 |
- |
2021-10-26 11:00 |
| Construction of 3km Pipeline and Elevated Tower in Heilbron |
NLM: TEC 90-15/28 |
2021-10-06 11:00 |
2021-10-29 12:00 |
| Construction of Sewer Kine in Heilbron/Phiritona Industrial Connection |
NLM: TEC 90-15/27 |
2021-10-06 10:00 |
2021-10-29 12:00 |
| Appointment of a Contractor for the Refurbishment of the Bulk Water Supply Pipeline to Reservoir 4 |
NLM:TEC/08/2021 (Reservoirs)- 4 |
- |
2021-09-07 10:00 |
| Appointment of a Contractor for the Refurbishment of the Bulk Water Supply Pipeline to Reservoir 3 |
NLM:TEC/08/2021 (RESERVOIRS)-3 |
- |
2021-09-07 10:00 |
| Appointment of a Contractor for the Installation of Internal Water and Sewer at Meloding Unit 3 and 7 in Virginia, Free State |
HDA/FS/2021/003 |
- |
2021-08-31 11:00 |
| Erratum- Construction of Paved Roads and Stormwater in Namahadi: Phase 4 |
SCM/BID07/2021/22 |
- |
2021-08-12 00:00 |