| Construction of Maduna Majojweni Link Line and 15 Households |
UMZ/2024-25/INFRA/ELECT/0020. |
- |
2025-03-31 12:00 |
| Panel for Emergency Work on the Iym Overhead and Underground Electrical Network at Various Locations when There is Need for a Period of 3 Years. |
IYM02/02/2025T |
2025-03-19 11:00 |
2025-04-11 12:00 |
| Cables |
SQ02252936 |
- |
2025-03-13 |
| Cables, Conductor |
SQ02252935 |
- |
2025-03-13 |
| Supply and Installation of Cabling Infrastructure and Associated Services (Electrical and Civil Works) for the Eastern Cape SAPS Sites |
RFQ 5908-2168-2024 |
- |
2025-02-26 11:00 |
| Cable, Cable, Conductor, Conductor, Stay Wire, Cable, Cable |
SQ02252929 |
- |
2025-03-04 |
| Cable |
SQ02252928 |
- |
2025-03-04 |
| Bricks, Fencing Rails, Cable, Cable, Cement, Piping |
SQ02252927 |
- |
2025-03-04 |
| Cable, Cable |
SQ02252925 |
- |
2025-03-04 |
| Construction of Majojweni Link Line & 15 Households |
UMZ/2024-25/INFRA/ELECT/0020 |
2025-02-26 10:00 |
2025-03-10 12:00 |
| Cable 16mm, Cable 25mm, Cable 16mmsq, Cable 16mm, Cable 240mmsq |
SQ02252916 |
- |
2025-02-24 |
| Cable 35sqmm, Cable 70sqmm, Cable 95sqmm, Cable 10sqmm |
SQ02252915 |
- |
2025-02-21 |
| Supply and Installation of Cabling Infrastructure and Associated Services (electrical and Civil Works) for the Eastern Cape Saps Sites. |
RFQ 5908-2168-2024 |
- |
2025-02-26 11:00 |
| Wire 1.5 Mm, Line Taps 70mm, Line Taps 100 Mm |
SQ02252919 |
- |
2025-02-20 |
| Panel of Five (05) Electrical Contractors for Maintenance and Emergency Work on the Ksd Overhead and Underground Electrical Network at Various Locations Within Ksdm for a Period of Three (03) Years with Cidb Grading of 4eb/ep. Briefing Session Will Be Held on the 13th of February 2025 at No. 6 Mveliso Street,vulindlela Heights @10h00. |
SCM: 007/2024/25 |
2025-02-13 10:00 |
2025-03-06 12:00 |
| Panel of Five (05) Electrical Contractors for Maintenance and Emergency Work on the Ksd Overhead and Underground Electrical Network at Various Locations Within Ksdm for a Period of Three (03) Years with Cidb Grading of 4eb/ep. Briefing Session Will Be Held on the 13th of February 2025 at No. 6 Mveliso Street,vulindlela Heights @10h00. |
SCM: 007/2024/25 |
2025-02-13 10:00 |
2025-03-06 12:00 |
| Panel of 2 Contractors for Maintenance of Traffic Signals Within the Ksdm for a Period of Three (03) Years with Cidb Grading of 4eb/ep. Briefing Session Will Be Held on the 13th of February 2025 at No. 6 Mveliso Street, Vulindlela Heights @11h00 |
SCM: 008/2024/25 |
2025-02-13 11:00 |
2025-03-06 12:00 |
| Panel of 2 Contractors for Maintenance of Traffic Signals Within the Ksdm for a Period of Three (03) Years. |
SCM: 008/2024/25 |
- |
2025-03-06 12:00 |
| Panel of Five (05) Electrical Contractors for Maintenance and Emergency Work on the Ksd Overhead and Underground Electrical Network at Various Locations Within Ksdm for a Period of Three (03) Years. |
SCM: 007/2024/25 |
2025-02-07 10:00 |
2025-03-06 12:00 |
| Panel of 2 Contractors for Maintenance of Traffic Signals Within the Ksdm for a Period of Three (03) Years. |
SCM: 008/2024/25 |
- |
2025-03-06 12:00 |
| Panel of Five (05) Electrical Contractors for Maintenance and Emergency Work on the Ksd Overhead and Underground Electrical Network at Various Locations Within Ksdm for a Period of Three (03) Years. |
SCM: 007/2024/25 |
2025-02-07 10:00 |
2025-03-06 12:00 |
| Panel of 2 Contractors for Maintenance of Traffic Signals Within the Ksdm for a Period of Three (03) Years. |
SCM: 008/2024/25 |
2025-02-07 11:00 |
2025-03-06 12:00 |
| Line Taps 95sqmm, Ferrules 185mm, Straight Joints 95mm, Cable 15mm Twisted. 3core, Wooden Poles., Cable Xlpe 95mm X3core |
SQ01252903 |
- |
2025-02-07 |
| Upgrade of Low Voltage Lines |
WMM-LM 21/01/25/05 LVL |
- |
2025-02-13 12:00 |
| Supply and Delivery of Cables and Joint Kits in East London |
TFR/2025/01/0002/86898/RFQ |
- |
2025-02-17 12:00 |
| Supply and Delivery of Cables and Joint Kits in East London |
WRAC-PE-50052 |
- |
2025-02-17 12:00 |
| Electrification of Households: Mountain View Ward 10 |
04_2024-2025t |
2025-02-04 11:00 |
2025-02-17 12:00 |
| Chamber Sections 1000mm, Cover Slabs, Lids for Medium Duty Slabs, Cable Copper Split., Cable 10sqmm Airdac |
SQ01252883 |
- |
2025-02-04 |
| Framework Contract for Three Constructors to Construct Electrification Projects Within Various Villages Elundini Local Municipality |
ELM-3/035/20213-2024 |
- |
2025-02-21 12:00 |
| Cable 95 Sqmm, Cable 16mm X 3c, Cable 70 Sqmm |
SQ01252892 |
- |
2025-02-03 |
| Cable 16mm X 3c, Cable 25mm X 3core, Cable 35sqmm, Cable 70 Sqmm, Cable 95sqmm |
SQ01252879 |
- |
2025-01-28 |
| Conductor Copper, Conductor Copper., Conductor Copper, Conductor Copper, Conductor Copper, Conductor Copper |
SQ01252880 |
- |
2025-01-28 |
| Bid No. 13/fy/25 – Maintenance of a Digital Security System and Joint Operations Centre at Great Fish River Nature Reserve for a Period of 24 Months with an Option to Extend for a Further Period of 12 Months |
BID NO. 13/FY/25 |
- |
2025-01-28 11:00 |
| Panel of Three (03) Service Providers for Supply and Delivery of Electrical Material for a Period of Three (03) Years as and when Needed (re-advert) (two Additional) |
SCM: 065.2022.23 |
- |
2025-01-23 12:00 |
| Panel of Three (03) Service Providers for Supply and Delivery of Electrical Material for a Period of Three (03) Years as and when Needed (readvert)(two Additional). |
065/2022/23 |
- |
2025-01-23 12:00 |
| Provision of Supervision, Labour, Equipment, Material (except the “big Five” Material), Transport (as it Will Be Required and Authorised) for Electrification of New Household Connections for Distribution Division in the Eastern Cape, Cape Coastal for a Contract for a Period of Two (2) Years and Six (6) Months Cluster as and when Required. |
MWP2934DX |
2025-01-17 10:00 |
2025-02-18 10:00 |
| Cables |
SQ11242867 |
- |
2024-12-13 |
| The Provision of Breakdown & Fault Repairs of Mv & Lv Lines (overhead Aerial Bundled Conductor, Bare Conductor Lines and Underground Cable Reticulation) in the Cape Coastal Cluster — Eastern Cape for the Period of 36 Months. |
EC1101KH |
2024-12-06 13:30 |
2025-01-23 10:00 |
| Supply and Delivery of Electrical Material 05 |
IYM05/11/2024Q |
- |
2024-12-03 12:00 |
| Lugs Cne, Tinned Wire Copper 2.0mm, Lugs 240mm X 20mm Hole., Lugs 10mm, Lugs Copper 16mm |
SQ11242844 |
- |
2024-12-02 |
| The Supply, Installation and Commissioning of the Electrical Distribution Items |
MBTC-SCM/84/2024 |
2024-11-22 10:00 |
2024-12-02 12:00 |
| Wire Surfix 1.5mm |
SQ11242825 |
- |
2024-11-26 |
| Tape Insulation black, Wire Tinned 2.0mm, Wire Tinned 1.6mm |
SQ11242810 |
- |
2024-11-25 |
| Cables |
SQ10242798 |
- |
2024-11-14 |
| Cables |
SQ10242797 |
- |
2024-11-14 |
| Cables |
SQ10242799 |
- |
2024-11-14 |
| Conductor |
SQ10242792 |
- |
2024-11-14 |
| Electrification of Maluti Depot Training Centre, Alfred Nzo Region for a Period of Four (4) Months |
ALF5-24/25-0045 |
- |
2024-11-20 11:00 |
| Re – Advert : Supply and Delivery Electrical Cable |
RE- IYM01/09/2024Q |
- |
2024-11-04 12:00 |
| Fuse Unit 400amp., Wire Surfix 1.5mm Black., Float Switch., Relay 24v Ac, Solder Al-cap 250gr Sticks |
SQ10242780 |
- |
2024-11-05 |