| Build 34km of Chickadee Line at 33kv Insulation Level from the Rouxville Substation to the Bophelo Proposed Substation Site to De-load the Existing Rouxville-zastron 22kv (rvz) Rural Line. Construct 2.9km 22kv Hare Line from Bophelo Substation Proposed Si |
FS111 |
2025-01-20 10:00 |
2025-02-04 10:00 |
| Build 42km of Hare Line at 33kv Insulation Level from the Rouxville Substation to the Smithfield Substation to De-load the Existing Rouxville-smithfield 22kv (rvs) Rural Line |
FS112 |
2025-01-20 10:00 |
2025-02-13 10:00 |
| Build 34km of Chickadee Line at 33kv Insulation Level from the Rouxville Substation to the Bophelo Proposed Substation Site to De-load the Existing Rouxville-zastron 22kv (rvz) Rural Line. Construct 2.9km 22kv Hare Line from Bophelo Substation Proposed Site to Zastron to Deload Rvz Line of the Zatron Substation |
FS111 |
2025-01-20 10:00 |
2025-02-04 10:00 |