| Completion of Remaining Electrical and Mechanical Works at Ikageng Pump Station |
Tender 09/2024 |
2024-02-13 12:00 |
2024-02-29 12:00 |
| Framework Agreement for Appointment of Professional Service Providers: Provision of Consulting Engineering Services: Infrastructure Projects: Electricity Supply Services. |
MISA/FC/ESS/013/2023/24 |
2024-01-23 10:00 |
2024-02-08 11:00 |
| Panel for Consultants(Turnkey) for High-Mast Lights and Street Lights at Various Wards for 36 Months |
GTLM/INFR08/2023/2024 |
2023-12-05 00:00:00 |
2024-01-16 12:00 |
| Construction and Maintenance of a Total Capacity Approximated 300kwp Photovoltaic(PV) Solar Plant |
Vus-PVS/W&R Funded/FTN2/08/2023 |
2023-09-19 11:00 |
2023-10-12 11:00 |
| Maintenance of Electrical Network, Streetlights and High-Mast Lights Around GTLM on the as and when Needed for a Period of 36 Months |
GTLM/INFR02/2023/2024 |
- |
2023-08-15 12:00 |
| Upgrading of Mmabatho Water Treatment Works to 30ml/d- Design, Manufacture, Supply, Delivery, Installation and Commissioning of Mechanical and Electrical Works (Re-Advert) |
RFB/MW/272-2/2022-23 |
2023-07-07 10:00 |
2023-07-17 12:00 |
| Earthworks, Installation of Water and Electrical for Greenhouse, Mahikeng Campus |
NWUTR070/2023MC |
- |
2023-07-17 12:00 |
| Panel of Service Providers for the Supply and Delivery of Various Maintenance of Water. Sanitation and Electrical Materials for a Period of 36 Months on as and when Required Basis |
034/MKLM/2022/2023 |
- |
2023-07-10 10:00 |
| Supply, Delivery, Installation and Commission Switchgear for Plant 2 at Vaalkop WTW |
RFB/MW/277/2022-23 |
2023-03-28 12:00 |
2023-04-18 12:00 |
| Bulk Water Supply to the Greater Mamusa Area: Mechanical and Electrical Pumping Equipment and SCADA and Telemetry |
BDM2007-028H |
2023-03-02 10:00 |
2023-03-23 12:00 |
| Supply, Delivery and Install Valves and Electric Actuators for Vaalkop Plant 2 Rapid Gravity Sand Filters and Plant 3 Sedimentation Tanks |
RFB/MW/265/2022-23 |
2023-02-07 12:00 |
2023-02-24 12:00 |
| Supply, Installation and Commissioning and Staff Training of a New Theatre Lighting Installation and New Voltage Socket Outlets as per Approved Design Layout |
NWUTR 009/2023 PC |
- |
2023-01-30 12:00 |
| Appointment of a Service Provider for Construction of Ratsegae High-Mast Lights |
KRLM/TEC/BID:01/2022-2023(RE-ADVERT) |
2022-10-14 10:00 |
2022-10-25 12:00 |
| Refurbishing of Portions of Existing Cable Reticulation, Distribution Boards, General Lighting Installation, Socket Outlet Installation, Isolator Installation and Trunking Installation |
NWUTR 095/2022 PC (FIDC 003/2021PC) |
- |
2022-10-21 12:00 |
| Construction, Upgrade Teaching and Learning and Related Common Areas (Rooms 101 and 102), Faculty of Engineering, Building G15, Potchefstroom Campus |
NWUTR 094/2022 PC (FIDC024/2020PC) |
- |
2022-10-20 12:00 |
| Maintenance of Electrical Low Voltage Equipment, Including all Installations in Buildings and Perimeter Lights |
NWUTR 101/2022 PC |
- |
2022-11-01 12:00 |
| Supply and Installation of LV Electrical Infrastructure 400V Cables, Electrical Supply Points, Light Fittings, Power Distribution Ductwork, Integration and Upgrade of Distribution Kiosks (400/231V) and High Mast Lights |
NWUTR 089/2022 PC: ELECTRICAL |
- |
2022-10-25 12:00 |
| Electrification of 99 Households at Colridge Ext 17 |
NLM2022-021B |
2022-09-01 10:00 |
2022-09-15 12:00 |
| Electrification of 250 Households at Rekgaratlhile Phase 2 |
NLM2022-020B |
2022-09-01 10:00 |
2022-09-15 12:00 |
| Supply and Installation of High Mast Lights Through Public Lighting Programme Cluster A in Dwarsberg, Mapaputle and Uitkyk |
013/MKLM/2022/2023 |
2022-08-26 10:00 |
2022-09-06 10:00 |
| Supply and Installation of High Mast Lights Through Public Lighting Programme Cluster B in Lerome (Mositwana), Molorwe and Ntswanalemetsing |
012/MKLM/2022/2023 |
2022-08-26 10:00 |
2022-09-06 10:00 |
| Appointment of a Service Provider for Construction of Ratsega E High-Mast Lights |
KRLM/TEC/BID: 01/2022-2023 (RE-ADVERT) |
2022-08-22 10:00 |
2022-08-30 12:00 |
| Provision of Professional Services - Panel of Professional Service Providers (Civil/Structural/Electrical/Mechanical/Engineering Management for Inclusion in a Database for a Period of 36 Months (Re-Advert) |
RDM2021-001A1 |
- |
2022-08-16 12:00 |
| Request for Appointment of a Contractor for the Refurbishment of Lethabile a Substation (Phase 2) for a Period of Twenty-Four (24) Months |
RFT01/11/2021/22 (Re-Advert) |
- |
2022-03-23 10:00 |
| Appointment of a Panel for Electrical Contractors for Supply, Delivery, Maintenance and Implementation of Various Infrastructure Projects as-and-when Required for a Period of 36 Months (3 Years) |
RMLM: SCM 2021/2022-007T |
- |
2022-02-15 11:00 |
| The Supply and Installation of Electrical Supply Points, Light Fittings, Network Points, Power Distribution Ductwork, Integration and Upgrade of Distribution Boards (400/231V) and Wiring of IT, ELD and FDS, |
NWUTR 003/2022 PC |
- |
2022-02-08 12:00 |
| Refurbishing of Portions of Existing Cable Reticulation, Distribution Boards, Installation of General Lighting, Socket Outlet, Isolator and Trunking |
NWUTR 019/2022 PC |
- |
2022-02-11 12:00 |
| The Supply and Installation of Electrical Supply Points, Light Fittings, Network Points, Power Distribution Ductwork, Integration and Upgrade of Distribution Boards (400/231V) and Wiring of IT, ELD, FDS |
NWUTR 156/2021 MC |
- |
2022-02-03 12:00 |
| Installation of Disability Lifts with Access Control, Minor Electrical Work and Minor Construction Work |
NWUTR 142/2021 NW (FIDC003/2020NW) |
- |
2022-01-27 12:00 |
| Request for Appointment of a Contractor for the Refurbishment of Lethabile A Substation (Phase 2) for a Period of 24 Months (2 Years) |
RFT01/11/2021/22 |
- |
2022-01-10 10:00 |
| Construction of High Mast Lights in Ward 17 |
MLM/IDS/HML/W17/21-22 |
2021-10-06 12:00 |
2021-10-15 12:00 |
| Appointment of Professional Engineers for the Planning, Design and Construction Monitoring of Installation of High Mast Lights in Ratsegae |
KRLMTEC/BID: 04/2021-22 |
2021-09-17 10:00 |
2021-09-29 12:00 |
| Appointment of a Panel of Professional Service Providers (Civil /Structural /Electrical /Mechanical) for a Period of 3 Years |
RDM2021-002A |
- |
2021-09-17 12:00 |
| The Design of Plant 2 Pump Station Switch Gears and VSD at Vaalkop Water Treatment Works |
RFB/MW/207/2020-21 |
- |
2021-06-25 12:00 |
| Construction of Stella Bulk Sewer and Internal Reticulation (Electrical/Mechanical) |
RDM2014-015C |
- |
2021-05-07 12:00 |
| Construction of High Mast Lights in Ward 14 |
MLM/IDS/HML/W14/21-22 |
2021-04-20 12:00 |
2021-05-03 12:00 |
| Construction of High Mast Lights in Ward 12 (Mathibestad RDP) |
MLM/IDS/HML/W12/21-22 |
2021-04-20 11:00 |
2021-05-03 12:00 |
| Construction of High Mast Lights in Ward 9 (Motla) |
MLM/IDS/HML/W9/21-22 |
2021-04-20 10:00 |
2021-05-03 12:00 |