| Erratum- Consulting Engineers to Provide Professional Engineering Services for Design Review, Contract Documentation and Site Supervision for- Dualization of Road K15 (R558) Adcock Road Between Road K102 at Lufhereng (km 8,46) and Wild Chestnut Street in Protea Glen (km 12,8)(Phase 3) as well as the Upgrading of the Existing K15 (R558) Stormwater Between K198 and K102 (Phase 1) and Between Wild Chestnut Street and K142/N12 (Phase 2) within the City of Johannesburg Metropolitan Municipality |
DRT 06/02/2020 |
2022-03-10 11:00 |
2022-04-01 11:00 |
| Erratum- Appointment of Professional multi-Disciplinary Service Providers for Detail Design Phase, Tender Document Preparation for the Construction Phase, Construction Monitoring and Pre-Planning and Town Planning for the Serviced Stands Programme of the Human Settlements Projects in City of Ekurhuleni, on as and when Required Basis, from 01 July 2022 until 30 June 2025 |
PS-HS 07-2022 |
- |
2022-04-01 10:00 |
| Erratum- Request for Qualification (RFG for the Development of a Civic Tower and a Multi-Level Parkade in the Germiston Civic Precinct as a Possible Public Private Partnership (PP), Entailing the Demolition of Certain Existing Structures, Design, Construction, Financing, Operation and Maintenance of the Proposed Development |
A-RE 03-2022 |
- |
2022-04-26 10:00 |
| Consulting Engineers to Provide Professional Engineering Services for Design Review, Contract Documentation and Site Supervision for- Dualization of Road K15(R558) Adcock Road Between Road K102 at Luthereng (km 8.46) and Wild Chestnut Street Protea Glen (km 12.8) (Phase 3) as well as the Upgrading of the Existing K15 (r558) Stormwater Between K198 and K102 (Phase 1) and Between Chestnut Street and K142/N12 (Phase 2) within the City of Johannesburg Metropolitan Municipality |
DRT 06/02/2020 |
2022-03-10 11:00 |
2022-04-01 11:00 |
| Appointment of a Panel of Civil Engineering Consultants for the Integrated Stormwater Master-Planning in Various Areas within the City of Johannesburg, for a Period of Three(3) Years |
JRA/21/151 |
2022-02-25 10:30 |
2022-03-18 11:00 |
| The Visual Assessment of Roads, Bridges and Major Culverts of the Gauteng Provincial Road Network |
DRT 03/06/2021 |
2022-02-04 11:00 |
2022-02-25 11:00 |
| Appointing Full Consulting Services by Professional Consultants who are Registered with the Professional Association (ECSA) for Construction of Pavilion Roof for the Rensburg Extension 4 Sports Field in Lesedi Local Municipality |
04/2022 |
- |
2022-02-04 12:00 |
| Tender for a Framework Contract for Multidisciplinary Professional Engineering Services for Various Projects in Tshwane: Three-Year Period, as and when Required |
COO 01-2021/22 |
- |
2022-03-02 10:00 |
| Tender for the Appointment of Engineering Consultants to Provide Engineering Services for Road Master Planning, Feasibility Investigations, Preliminary Designs and Additional Support Services: Three-Year Period, as and when Required |
RTD 04-2021/22 |
2022-02-02 10:00 |
2022-02-18 10:00 |
| New Science and Research Labs (HS Building)- Consultant Team at Vaal University of Technology (Once-Off) |
T32/2021 |
2021-11-25 14:00 |
2021-12-07 12:00 |
| The Appointment of Professional Resource Team (PRT) to Project Manage the Development of Bulk Infrastructure Services for Springs Precinct |
GIDZ/07/2021-22/SPRINGS PRT BULK |
2021-11-17 11:00 |
2021-12-09 11:00 |
| The Appointment of Professional Resource Team (PRT) to Project Manage the Development of Bulk Infrastructure Services for Ortia Precinct 2 |
GIDZ/06/2021-22/ORTIA PRT BULK |
2021-11-16 11:00 |
2021-12-08 11:00 |
| Appointment of the Professional Resource Teams (PRT's) to Review and Adopt the Existing Project Designs by the Previous Terminated PRT, Review of the Existing Bill of Quantities(BOQ) Stage 5 Supervision and Preparation of the Close out Report Upon Construction Completion in Line with ECSA Guidelines for the Full Delivery of the Bio-Park Phase 3 Project at the Innovation Hub |
GGDA/05/2021-22/BIOPARK |
2021-11-19 10:00 |
2021-12-10 11:00 |
| Professional Engineering Services for Detailed Design, Rehabilitation, Environmental Impact Assessment, Contract Documentation and Site Supervision for Road P241/1(R559), from K15(R558) to K11(R28) Bekkersdal- Approximately 19km |
DRT 12/05/2019 |
2021-11-16 11:00 |
2021-12-06 11:00 |
| Appointment of a Multi-Disciplinary Professional Team for the Development of a Campus Infrastructure Masterplan for the Vanderbijlpark Campuses and Educity (Sebokeng) Campus, Vaal University of Technology (Once-Off) |
T30/2021 |
2021-11-05 10:00 |
2021-11-16 12:00 |
| Appointment of Consulting Electrical Engineers for Professional Services for Electrical Reticulation Infrastructure Projects of Various Areas on an as and when Required Basis from Date of Award until 30 June 2024 |
PS-EE 22-2021 |
- |
2021-12-09 00:00 |
| Tender for Professional Engineering Services to Assist with Watercourse and Flood Management in Tshwane: Three-Year Period |
RTD 03-2021/22 |
2021-11-08 10:00 |
2021-11-30 10:00 |
| Tender for Professional Engineering Services to Assist with Storm Water and Catchment Management in Tshwane: Three-Year Period |
RTD 02-2021/22 |
2021-11-08 10:00 |
2021-11-29 10:00 |
| Appointment of a Structural Engineer as the Lead Consultant for Professional Structural Engineering Services (Inclusive of Facade Engineering) to Provide Professional Services on the South African Reserve Bank's Head Office Tower Block Refurbishment Project |
4795425 |
- |
2021-11-15 14:00 |
| Appointment of an Architect (Architectural Services, Inclusive of Interior and Acoustic Consulting Services) to Provide Professional Services on the South African Reserve Bank Head Office Refurbishment Project |
4787382 |
- |
2021-11-01 14:00 |
| Expanded Public Works Programme Technical Support for the Period of 36 Months |
DID 10/07/2021 |
- |
2021-10-08 11:00 |
| Expanded Public Works Programme Technical Support for the Period of 36 Months |
DID 10/07/2021 |
- |
2021-10-08 11:00 |
| Erratum- A Panel of Consultants for Professional Services for Bridge Engineering, Planning, Design and Construction Monitoring, Detail Bridge/Culvert Inspections and Updating Struman Management System Rehabilitation for a Period of 3 Years |
JRA/20/58 |
- |
2021-09-20 11:00 |
| Tenders are Hereby Invited from Competent Civil Engineering Contractors with a CIDB Grading of 4CE or Higher for Development of Westhaven Cemetery Phase 2 for Mogale City Local Municipality |
IEM (P) 02/2022 |
- |
2021-09-09 11:00 |
| Tenders are Hereby Invited from Competent Civil Engineering Contractors with a CIDB Grading of 4CE for the Kagiso Regional Park Phase 2 |
IEM (P) 01/2022 |
- |
2021-09-08 11:00 |
| Erratum- Panel of Professional Engineering Services: Wastewater Treatment on an as and when Required Basis for a Period of 36 Months |
JW 14075 R |
- |
2021-08-24 10:30 |
| Panel of Consultants for Professional Services for Bridge Engineering |
JRA 20/58 |
- |
2021-09-08 11:00 |
| Panel of Professional Engineering Services: Wastewater Treatment on an as and when Required Basis for a Period of 36 Months |
JW 14075 R |
- |
2021-08-16 10:30 |
| The Multi-Disciplinary Team of Professionals: Women-LED Design and Placemaking- Indlela Ya Bafazi- Women's Way Over 24 Months Period for the JDA |
JDA/DPF/W-LDP/21 |
- |
2021-08-12 12:00 |
| For Electrical Engineering Consultant to Provide Full Professional Consulting Services on an as and when Required Basis Contract for a Period of Three Years |
43/2021 |
- |
2021-07-20 12:00 |
| The Appointment of a Consulting Engineering for Construction Supervision of N12 Alliance Road Interchange Daveyton form Date of Award until 30 June 2023 |
PS-RS 19-2021 |
- |
2021-07-19 10:00 |
| The Appointment of Alternative Building Technology (ABT) Contractors for the Design, Supply, Refurbishment and Construction of Various Building Typologies and Operational Facilities for the City of Ekurhuleni (CoE) on an as and when Required Basis from Date of Award until 30 June 2024 |
A-RE 06-2021 |
- |
2021-07-08 10:00 |
| The Appointment of a Consulting Engineer for the Rehabilitation of Boksburg Lake from Date of Award until 30 June 2024 |
A-EWM 13-2021 |
- |
2021-07-08 10:00 |
| Tenders are Hereby Invited for the Appointment of Registered Professional Engineering Consulting Firms (Electrical and Mechanical Engineering Consultants) on a Panel of Consulting Engineers on an as and when Required Basis for a Period of Three (3) Years |
PWRT (PMU) 11/2021 - B |
- |
2021-06-30 11:00 |
| Tenders are Hereby Invited for the Appointment of Registered Professional Engineering Consulting Firms (Civil Engineering Consultants) on a Panel of Consulting Engineers on an as and when Required Basis for a Period of Three (3) Years |
PWRT (PMU) 11/2021 - A |
- |
2021-06-30 11:00 |
| Consulting Engineering and Safety Agent Services for the Management and Supervision of Routine Road Maintenance of RISFSA Class 3 Roads: Gauteng Province |
DRT 30/09/2019 Package E |
2021-05-31 10:00 |
2021-06-22 11:00 |
| Consulting Engineering and Safety Agent Services for the Management and Supervision of Routine Road Maintenance of RISFSA Class 3 Roads: Gauteng Province |
DRT 30/09/2019 Package D |
2021-05-31 10:00 |
2021-06-22 11:00 |
| Consulting Engineering and Safety Agent Services for the Management and Supervision of Routine Road Maintenance of RISFSA Class 3 Roads: Gauteng Province |
DRT 30/09/2019 Package C |
2021-05-31 10:00 |
2021-06-22 11:00 |
| Consulting Engineering and Safety Agent Services for the Management and Supervision of Routine Road Maintenance of RISFSA Class 3 Roads: Gauteng Province |
DRT 30/09/2019 Package B |
2021-05-31 10:00 |
2021-06-22 11:00 |
| Consulting Engineering and Safety Agent Services for the Management and Supervision of Routine Road Maintenance of RISFSA Class 3 Roads: Gauteng Province |
DRT 30/09/2019 Package A |
2021-05-31 10:00 |
2021-06-22 11:00 |
| Professional Engineering Services for All the Preliminary Design and Full Environmental Impact Assessment of K54 Phase 2 Expressway From PWV 17 to K101 |
DRT 34/09/2019 |
2021-05-06 10:00 |
2021-05-26 11:00 |
| Electrical Engineering Services Tender for the Construction of the Foot and Mouth Disease Factory at Onderstepoort Veterinary Research Campus |
ARC/40/03/2021 |
2021-04-21 11:00 |
2021-05-06 11:00 |
| Professional Engineering Services for Preliminary Design, Detail Design, EIA, Contract Documentation and Site Supervision for Road D2204 from K15 to D785 (Lenasia Road) Approximately 1km as well as the Bridge over Rail for the Period of 36 Months |
DRT 33/09/2019 |
2021-04-14 11:00 |
2021-05-11 11:00 |