| The Provision of Inline Inspection Services: Magnetic Flux Leakage (mfl) Wall Loss/ Corrosion Detection Survey of Various Pipeline Sections of Petrol, Diesel & Crude Oil Onshore Pipeline Network for a Period of Three (03) Years. |
TPL/2026/06/0396/7399/RFP |
2026-09-02 10:00 |
2026-09-22 12:00 |
| For the Provision of Inline Inspection Services: Magnetic Flux Leakage (mfl) Wall Loss/ Corrosion Detection Survey of Various Pipeline Sections of Petrol, Diesel & Crude Oil Onshore Pipeline Network for a Period of Three (03) Years. |
TPL/2026/06/0396/7399/RFP |
2026-09-02 10:00 |
2026-09-22 12:00 |
| Removal, Inspection, Manufacturing, and Replacement of 18kv Busbars for a Period of 5 Years at Kriel Power Station on an as and When Required Basis |
E3295GXMPKRI |
2026-08-05 10:00 |
2026-09-04 10:00 |
| Provision of Maintenance Services: Vessels Surface Preparation, Internal & External Corrosion Protection (coatings And/or Linings), Pressure Testing, Safety Valve Calibration And/or Name Plate Replacement “as-and when Required Based on Inspection Findings. at Matla Power Station for a Period of Five (5) Years |
E3378GXMPMAT |
- |
2026-09-11 10:00 |
| Appointment of a Service Provider to Conduct an Occupational Hygiene Survey on Selected Safcol Offices, Workshops and Plantations |
RFQ 890/SHEQ/19/2026 |
- |
2026-08-14 12:00 |
| Refurbishment of Re-steliting of Valves During Planned (ir, Go and Mgo) and Unplanned Maintanance at Matla Power Station for a Period of Five
(05) Years on a as and when Required Basis |
E3325GXMPMAT |
2026-08-12 11:00 |
2026-09-18 10:00 |
| Removal, Inspection, Manufacturing, and Replacement of 18kv Busbars for a Period of 5 Years at Kriel Power Station on an “as and When” Required Basis |
E3295GXMPKRI |
2026-08-05 10:00 |
2026-09-04 10:00 |
| The Provision of Maintenance Quality Control Service for a Period of 5 Years at Kusile Power Station |
E3171GXMPKUS |
2026-07-16 13:00 |
2026-07-29 10:00 |
| For the Inspection, Certification, and Load Testing of Crawl Beams at Kendal Power Station for a Period of 5 Years |
E3165GXMPKEN |
2026-07-09 10:00 |
2026-08-17 10:00 |
| Appointment of an Approved Professional Person to Conduct the Feasibility Study and Inspection of Dams at Kendal Power Station for the 2027 Financial Year for a Period of Three (3) Months. |
E3089GXMPKEN |
2026-06-29 10:00 |
2026-07-14 10:00 |
| Provision of Surveying, Condition Assessment and Generation of As-built Information for Kendal and Pendoring Transnet Inland Terminals Soc Ltd |
TPT/2026/06/0654/7372/RFQ |
- |
2026-06-24 12:00 |
| Provision of Routine and Ad Hoc Condition Monitoring Service at Kendal Power Station for a Period of Five (5) Years |
E2952GXMPKEN |
2026-06-02 10:00 |
2026-06-10 10:00 |
| The Appointment of a Service Provider to Conduct an Occupational Hygiene Survey at the Kruger National Park |
RFQ No.: 309219 |
- |
2026-06-09 11:00 |
| The Appointment of a Service Provider to Conduct an Occupational Hygiene Survey at the Kruger National Park. |
RFQ- 309219 |
- |
2026-06-09 11:00 |
| Arnot Power Station Civil Structures Annual Inspections & Monitoring (including Roads) for a Period of 5yrs (60 Months) |
E2931GXMPARN |
2026-06-03 13:00 |
2026-06-22 10:00 |
| Provision of Condition Monitoring Services for Balance of Plant Using Handheld Technology for a Period of 60 Months |
E2909GXMPARN |
- |
2026-06-22 10:00 |
| Provision of Approved Inspection Authority Services for Transnet Pipelines |
TPL/2026/03/0165/3013/RFP |
2026-04-21 10:00 |
2026-05-13 12:00 |
| Provision of Approved Inspection Authority Services for Transnet Pipelines |
TPL/2026/03/0165/3013/RFP |
2026-04-21 10:00 |
2026-05-13 12:00 |
| Inspection, Repairs, Fabricate, Supply and Install of Ceramic Lined Pulverised Fuel
Pipes, Hangers and Supports at Kriel Power Station Over a Period of Five (5) Years |
E2806GXMPKRI |
2026-05-05 10:00 |
2026-05-19 10:00 |
| Inspection, Repairs, Fabricate, Supply and Install of Ceramic Lined Pulverised Fuel Pipes, Hangers and Supports at Kriel Power Station Over a Period of Five (5) Years |
E2806GXMPKRI |
2026-05-05 10:00 |
2026-08-14 10:00 |
| Rfq Inspection, Testing and Certification of Hi-ab Truck & Lifting Equipment at Sanpc Ogies (emalahleni)for a Period of 24 Months. |
SANPC/360/04/2026 |
- |
2026-04-23 16:00 |
| Rfq Inspection, Testing and Certification of Hi-ab Truck & Lifting Equipment at Sanpc Ogies (emalahleni)for a Period of 24 Months. |
SANPC/360/04/2026 |
- |
2026-04-23 16:00 |