| Enzondwane Domestic Reticulation Zone I3
The Scope Consists of Approximately 70km Reticulation Network with Pipe Diameters Between 20mm to 90mm (hdpe), 110mm to 200mm (opvc), and Approximately 600 Yard Taps, Including Air, Scour and Isolating Valves, Meter Chambers, Break Pressure Tanks, Prv’s and Telemetry |
ZDM010/2025-2026 |
2026-01-14 10:00 |
2026-02-04 12:00 |
| Nhlohlela Water Supply
The Scope of Works Comprises the Construction of Approximately 3700m of 200-250mm Diameter Upvc and 250mm Diameter Steel Pipe, 20-110mm of 9 900m of Hdpe Pipelines, 160 House Connections and Standpipes Including Associated Valves and Chambers, 250kl Concrete Reservoir with Fittings and Fencing Etc |
ZDM 011/2025-2026 |
2026-01-13 10:00 |
2026-02-03 12:00 |
| Gumbi Water Supply Scheme Upgrade
The Construction of 750m of 200mm Diameter Hdpe Pipeline and 6500m of 200mm Diameter Pvc-o Rising Pipeline, with Associated Valves, Chambers and Fittings, New Floating Raw Water Abstraction Pumpstation with Two Submersible Pumps, Installation of Two New High-lift Raw Water Pumps. Mechanical and Electrical Works to Upgrade and Optimise the Gumbi Water Treatment Works Production to 1,5ml/day, New Centrifugal Pumps and Associated Civil Works, Construction of 8500m of 140mm Diameter U-pvc Rising Main to Hlambanyathi and Gumbi Extension. |
ZDM012/2025-2026 |
2026-01-15 10:00 |
2026-02-03 12:00 |