| Repairs of Ash Dam Filter Drains and Piezometer to Improve Ash Dam Stability at Matla Power Station for a Period of Twelve (12) Months. |
E2933GXMPMAT |
2026-06-08 14:00 |
2026-06-19 10:00 |
| Supply and Delivery of Control and Instrumentation Thermo-sensors on as and when Required Basis at Kriel Power Station for a Period of Five Years |
E2733GXMPKRI |
2026-04-14 10:00 |
2026-06-30 10:00 |
| Supply and Delivery of Thermocouple and Gauges for a Period of Five (5) Years on as and when Required Basis
For Matla Power Station. |
E2325GXMPMAT |
2026-01-20 11:00 |
2026-02-06 10:00 |
| The Supply and Delivery of Various Modules on an "as and When" Required Basis for a Period of Five Years at Kriel Power Station |
E1878GXMPKRI |
2025-10-02 14:00 |
2025-11-12 10:00 |
| Supply of Spares and Maintenance During as and when Required of the H2 Dryer, H2 Skid, Co2 Evaporator, Stator Head Tank Panel and Gas Analysers at Kriel Power
Station for the Duration of 5 Years. |
E1809GXMPKRI |
2025-09-19 10:00 |
2025-10-27 10:00 |
| The Provision of Thermal Index Thermocouples Service Outages for a Period of Five Years as and when Required Basis at Kriel Powerstation |
E1248GXMPKRI |
- |
2025-06-11 10:00 |
| Bi-monthly Calibration, Monthly Service and Ad-hoc Repairs of the South Stack (boiler 1 to 3), Boiler 4, Boiler 5 and Boiler 6 Smoke Stack Gas Emission Analyser Systems for a Period of Five (5) Years. |
MPMAT10671GXR1 |
2025-03-04 11:00 |
2025-04-02 10:00 |
| Supply of Spares and Maintenance During Outages of the H2 Dryer, H2 Skid, Co2 Evaporator, Stator Head Tank Panel and Gas Analyzers at Kriel Power Station for the Duration of 5 Years. |
MPKRI11328GX |
2024-11-01 09:00 |
2024-12-11 10:00 |
| Mpkri11282gx the Supply and Delivery of Control and Instrumentation Equipment as Stock Items for Boiler, Turbine and Auxiliary Plant Non-oem Spares -for a Period of Five (5) Years to Kriel Power Station |
MPKRI11282GX |
2024-09-04 13:00 |
2024-10-21 10:00 |
| Supply and Delivery of C&i Fields Instrumentation, as Stock Items for Stock Replenishment for a Period of Five (5) Years at Matla Power Station. |
MPMAT11178GX |
2024-08-21 12:00 |
2024-09-12 10:00 |
| Supply and Installation of Coal Bunkers Level Indicators at Kriel Power Station for a Period of 12 Months |
MPKRI11188GX |
2024-07-02 09:00 |
2024-08-15 10:00 |
| Supply and Delivery of Various Control and Instrumentation
Spares at Kriel Power Station, Main Stores for Engineering,
Maintenance and Outages Departments for a Period of 12
Months. |
MPKRI11186GX |
2024-06-25 10:00 |
2024-07-04 10:00 |
| The Supply and Installation of Boiler Water Circulating Pump (bwcp)
Monitoring and Measurement Instrumentation (differential Pressure,
Temperatures and Flow) and Interfacing the New Signals to the T3000 Dcs For
Monitoring of the Circulation Pump System on the Hmi View Displays for Kriel
Power Station 4 Units for a Period of 2 Two Years |
MPKRI11134GX |
- |
2024-07-22 10:00 |
| Supply and Delivery of Generator H2 Dryer, H2 Skid, Co2 Evaporator, Gas Analysers
And Stator Head Tank Panel Spare Components at Kriel Power Station for Period of Five Years |
Cancel MPKRI10527GX |
- |