| Rfp for the Supply, Instal and Commission Temperature Compensated Flow Meters at 18 Fuel Depots. |
SIC 24011 CIDB HOAC-HOAC 48316 |
- |
2025-03-06 10:00 |
| Supply, Delivery and Commissioning of Fourth Industrial Revolution (4ir) of Lab Equipment for Nkangala Tvet College. |
NKTVET/2025/02/01 |
- |
2025-03-11 11:00 |
| Bi-monthly Calibration, Monthly Service and Ad-hoc Repairs of the South Stack (boiler 1 to 3), Boiler 4, Boiler 5 and Boiler 6 Smoke Stack Gas Emission Analyser Systems for a Period of Five (5) Years. |
MPMAT10671GXR1 |
2025-03-04 11:00 |
2025-04-02 10:00 |
| Supply and Installation of Piezometers at Duvha Power Station for Duvha Power Station on an “as and when Required Basis” for a Period of 36 Months |
ERI/2025/BMS/03 |
- |
2025-03-10 10:00 |
| Supply and Delivery of Various of Production Assets for Majuba Power Station for a Period of One Month |
MPMAJ11454GX |
- |
2025-02-19 10:00 |
| Supply, Delivery, Installation and Maintenance of Near Real-time Water Quantity and Quality Data Transmission Systems and Instrumentation for a Period of Thirty-six (36) Months |
IUCMA/004/DATATRANSMISSION/2024 |
- |
2025-02-26 11:00 |
| Demin Cation Vessel Replacement
The Fabrication, Supply and Installation of Three Demin Cation Vessels with Engineering Design Assessments, Including the Supply and Installation of Associated Control Instrumentation at Majuba Power Station, Water Treatment Plant for a Duration of Up to Twenty Three (23) Months. |
MPMAJ11415GX |
2025-02-12 11:00 |
2025-03-20 10:00 |
| Supply and Delivery of Smart Scanner Devices for City of Mbombela |
COM01/2025 |
- |
2025-01-24 11:00 |
| Request for Information (rfi) on Broken Rail Detection Technologies for Transnet Freight Rail for a Once off Period |
HOAC HO 47913 |
2025-02-07 10:00 |
2025-03-28 10:00 |
| Supply and Delivery of Performance & Testing Equipment’s at Kusile
Power Station |
MWP2957GX |
- |
2025-01-31 10:00 |
| Supply, Delivery, Install and Commission of Aux Steam (lbg) & Cold Reheat System (lbc) |
MPKUS11430GX |
2025-01-15 10:00 |
2025-01-21 10:00 |
| Installation of Compressed Flow Meters to Process and Instrument Air Pipework for a Period of 5 Months at Kusile Power Station |
MPKUS11446GX |
2025-01-09 10:00 |
2025-01-28 10:00 |
| Kusile Power Station Replacement of Metering and Measurements Transducers |
MPKUS11445 |
2025-01-08 10:00 |
2025-01-30 10:00 |
| For The: Supply, Delivery and Installation of Mechanical Equipment and Road Decanting Pipework at Witbank Diesel Depot. |
ERAC-WGO-49302/TFR/2024/12/0005/84996/RFQ |
- |
2025-01-23 10:00 |
| On-site Servicing and Calibration of Balances(arc-tsc)nelspruit |
ITS012411RFQ00000069 |
- |
2024-12-11 11:00 |
| Installation of Essential Instrumentation Measurements Display at Grootvlei Power Station for a Period of 18 Months. |
MPGRO11306GXR1 |
2025-01-16 13:00 |
2025-02-11 10:00 |
| Supply, Delivery, Installation and Commission of Fgd Gas Detectors for Kusile Power Station for a Period of 06 Months. |
MPKUS11351GX |
2024-11-07 10:00 |
2024-11-25 11:00 |
| Supply of Spares and Maintenance During Outages of the H2 Dryer, H2 Skid, Co2 Evaporator, Stator Head Tank Panel and Gas Analyzers at Kriel Power Station for the Duration of 5 Years. |
MPKRI11328GX |
2024-11-01 09:00 |
2024-12-11 10:00 |
| Design, Supply, Installation, Operation and Maintenance of Wind Measurements Units at Arnot, Camden, Grootvlei, Hendrina and Tutuka Power Stations. |
MWP2678CX-R |
2024-11-07 11:00 |
2024-12-03 10:00 |
| Supply and Delivery of Water Data Loggers and Leak Detection Equipment for City of Mbombela |
COM64/2024 |
- |
2024-10-30 11:00 |
| The Supply and Delivery of Thermocouples, Detectors, Transmitters and Other C&i Spares at Camden Power Station. |
MPCAM11256GX |
2024-10-17 10:00 |
2024-10-30 10:00 |
| The Supply and Delivery of C&i Modules at Camden Power Station. |
MPCAM11255GX |
2024-10-17 13:00 |
2024-10-30 10:00 |
| Provision for Installation of Hvac Cep Vsd Room Modification to Unit 1 to Unit 6 for a Period of One (01) Year at Kusile Power Station. |
MPKUS11285GX EXTENSION |
- |
2024-10-08 10:00 |
| The Maintenance of Boiler Emissions Gas Analysers and the Provision of Spares on an “as- And- When" Required Basis for Both
South and North Stack at Arnot Power Station for a Period of 5 Years (re-issue). |
MPGXC006008R3 |
2024-10-07 10:30 |
2024-10-30 10:00 |
| Purchase, Installation and Commissioning of Vibration Probes for the Fd, Id and Pa Fans From
Unit4 – 6 Project for a Period of 24 Moths. |
MPKUS11309GX |
2024-09-25 10:00 |
2024-10-17 10:00 |
| Installation of Essential Instruments at Grootvlei Power Station. |
MPGRO11306GX |
2024-09-23 10:30 |
2024-10-14 10:00 |
| Supply and Delivery of Once off Sensor, Flow: Medium: Bunker 150 Fuel Oil; Dimensions: 759 Mm; Flow |
MPKEN11302GX |
- |
2024-11-26 10:00 |
| Supply and Delivery of Land Surveying Equipment and Software (re-advert) |
8/3-53/2023. |
- |
2024-09-17 12:00 |
| Mpkri11282gx the Supply and Delivery of Control and Instrumentation Equipment as Stock Items for Boiler, Turbine and Auxiliary Plant Non-oem Spares -for a Period of Five (5) Years to Kriel Power Station |
MPKRI11282GX |
2024-09-04 13:00 |
2024-10-21 10:00 |
| Data Center Infrastructure Maintenance for Nkangala District Municipality for a Period of Three (03) Years. (re-advert) |
57491 (RE-ADVERT 3) |
2024-08-22 14:00 |
2024-09-16 12:00 |
| Provision for Design, Supply, and Installation of Wind Measurements Units at Komati Power Station for Period of Eighteen (18) Months. |
MPKOM11257GX |
2024-08-23 10:00 |
2024-09-23 10:00 |
| Appointment of a Service Provider for the Supply, Delivery, Testing and Training of Cable Fault Detection and Thump Testing Equipment |
ELM 24-25/08/04 |
- |
2024-09-09 12:00 |
| Design, Supply, Installation, Operation And
Maintenance of Wind Measurements Units At
Camden, Grootvlei, Hendrina and Tutuka Power
Stations. |
MWP2678CX |
- |
2024-09-12 10:00 |
| Supply and Delivery of C&i Fields Instrumentation, as Stock Items for Stock Replenishment for a Period of Five (5) Years at Matla Power Station. |
MPMAT11178GX |
2024-08-21 12:00 |
2024-09-12 10:00 |
| C&i Calibration and Refurbishment of Station Service Instruments for a Period of 3 Years at Kusile Power Station |
MPKUS11229GX |
2024-08-15 10:00 |
2024-08-26 10:00 |
| Request for Quotation for Seismograph Monitoring Services for a Period of 12 Months at Vlakfontein Mine |
6000008067 |
- |
2024-08-06 12:00 |
| The Supply , Delivery and Calibration of Pyrometers |
MPMAJ11214GX |
- |
2024-08-26 10:00 |
| Supply and Installation of 43 Ash Dam Piezometers at Grootvlei Power Station for the Period of 6 Months. |
MPGRO11155GXR1 |
2024-07-18 10:00 |
2024-07-29 10:00 |
| The Supply and Delivery of Gauges, Limit Switches, Transmitters And
Thermocouples at Grootvlei Power Station for as an when Required for a Period
Of 5 Years. |
MPGRO11195GX |
2024-07-11 13:00 |
2024-07-31 10:00 |
| Supply and Delivery of Various Control & Instrumentation Instruments To
Grootvlei Power Station for the Period of 5 Years. |
MPGRO11196GX |
2024-07-11 10:30 |
2024-07-30 10:00 |
| Supply and Installation of Coal Bunkers Level Indicators at Kriel Power Station for a Period of 12 Months |
MPKRI11188GX |
2024-07-02 09:00 |
2024-08-15 10:00 |
| The Supply, Commission, Training, Service and Calibration of Carbon, Hydrogen & Nitrogen (chn) Instrument at Kriel Power Station for a Period of 5 Years, as and when Required Basis. |
MPKRI11141GX |
2024-07-01 10:00 |
2024-07-18 10:00 |
| Appointment of a Panel of Service Providers for the Supply, Delivery and Off-loading of Electrical Spares, Material and Testing Equipment for a Period of 36 Months |
ELM 24-25/07/03 |
- |
2024-07-19 12:00 |
| Supply and Delivery of Various Control and Instrumentation
Spares at Kriel Power Station, Main Stores for Engineering,
Maintenance and Outages Departments for a Period of 12
Months. |
MPKRI11186GX |
2024-06-25 10:00 |
2024-07-04 10:00 |
| Manufacturing, Testing, Training, Supply, Delivery, Offloading & Installation / Site Erection of Estimated Quantities of Digital Fault Recorder (dfr) and Travelling Wave System (tws) Fault Locator Schemes for Eskom Transmission Substations. |
MWP2356TX-R |
2024-06-11 12:00 |
2024-07-09 10:00 |
| The Supply and Installation of Boiler Water Circulating Pump (bwcp)
Monitoring and Measurement Instrumentation (differential Pressure,
Temperatures and Flow) and Interfacing the New Signals to the T3000 Dcs For
Monitoring of the Circulation Pump System on the Hmi View Displays for Kriel
Power Station 4 Units for a Period of 2 Two Years |
MPKRI11134GX |
- |
2024-07-22 10:00 |
| The Supply and Installation of 43 Piezometers for Ash Dam at Grootvlei Power
Station for a Period of 6 Months |
MPGRO11155GX |
2024-05-30 10:00 |
2024-06-18 10:00 |
| Appointment of Service Provider for the Maintenance and Refurbishment Including Replacement of Parts and Calibration of Equipment for a Period of Three Years. |
RFQ 201359 |
2024-05-22 10:00 |
2024-06-07 11:00 |
| Supply and Delivery of Generator H2 Dryer, H2 Skid, Co2 Evaporator, Gas Analysers
And Stator Head Tank Panel Spare Components at Kriel Power Station for Period of Five Years |
Cancel MPKRI10527GX |
- |
2024-05-16 11:00 |
| Supply and Delivery of Digital Pressure Test Gauges at Tutuka Power Station – Main Stores – Once-off. |
MPTUT11129GX |
- |
2024-06-13 10:00 |