| Solar Powering of Lenasia Depot Guardhouse |
JCPZ/RFQ/FM135/2023 |
2024-01-19 11:30 |
2024-01-23 12:00 |
| The Provision of Technical Facilities Management Services to Eskom Real Estate (ere) Eskom Research and Innovation Centre (eric) for a Period of Five (5) Years |
MWP2312CX |
2024-01-26 12:00 |
2024-02-14 10:00 |
| Repairs to Pioneer Park |
JCPZ/RFQ/FM127/2023 |
2024-01-17 11:30 |
2024-01-22 11:00 |
| Test Underground Cable, Fault Finding, Repair and Service of Mini Substation 100kva |
OBP 529/2023/24 |
2024-01-19 10:00 |
2024-01-26 15:00 |
| Design, Install and Commission a 10 Kva 5 Kwh Solar Power Solution. |
RFQ 2950/23 |
2024-01-16 10:00 |
2024-01-26 11:00 |
| Request for Proposals for the Design and Implementation of a Pv with Storage Mini-grid Energy Security Intervention |
BID2323 |
2024-02-02 10:00 |
2024-02-14 16:00 |
| The Supply, Maintenance and Commissioning of Provincial Street Lights on Various Provincial Roads and Security Lighting of Buildings for a Period of Three(3) Years: In the Gauteng Province |
DRT12/02/2022 |
2023-11-17 12:00 |
2023-12-12 11:00 |
| Supply, Installation and Commissioning of New Streetlights on Various Provincial Roads in all Regions for a Period of Three(3) Years in the Gauteng Province |
DRT11/02/2022 |
2023-11-17 10:30 |
2023-12-12 11:00 |
| Provision of Power Cable Testing and Cable Fault Location on an as and when Required Basis for a Three(3) Year Period, Heidelberg, Gauteng |
26/2023 |
- |
2023-10-27 12:00 |
| Implementation of Phase 1 of the Electrical Masterplan of the Main Campus |
T09/2023 |
2023-09-13 10:00 |
2023-09-21 11:00 |
| Electrification of Residential Units in Lesedi Local Municipality on an as and when Required Basis from Date of Award for a Period of 3 Years (Re-Advert) |
17/2023 |
- |
2023-09-22 12:00 |
| Appointment of an Electrical Contractor for Electrical Upgrade Including Backup Power(Generator) at ASDC, Benoni, Daveyton, Kwa-Thema and Springs Campus |
EEC/T05/2023 |
2023-08-24 10:00 |
2023-09-04 11:00 |
| Electrification of Residential Units in Lesedi Local Municipality on an as and when Required Basis from Date of Award for a Period of 3 Years |
17/2023 |
- |
2023-08-08 12:00 |
| Supply, Delivery and Installation of High-Mast Lights in Lesedi Local Municipality, on an as and when Required Basis for a Period of Three Years |
18/2023 |
- |
2023-08-10 12:00 |
| Erratum- Restoration of Van Wyk's Rust Pump Station at Olifantsvlei Works for a Period not Exceeding Six(6) Months |
JW OPS 053/23 |
2023-06-20 11:00 |
2023-07-14 10:30 |
| Erratum- Supplementary Panel of Service Providers for the Plumbing Works and Electrical Services for the Refurbishment and Renovations of Various JRA Owned Buildings within the City of Johannesburg on an as and when Required Basis |
JRA/22/23 |
- |
2023-08-07 10:00 |
| Supplementary Panel of Service Providers for the Plumbing Works and Electrical Services for the Refurbishment and Renovations of Various JRA Owned Building within the City of Johannesburg on an as and when Required |
JRA/22/23 |
2023-07-05 10:00 |
2023-07-29 10:00 |
| Restoration of Van Wyk's Rust Pump Station at Olifantsvlei Works for a Period not Exceeding Six(6) Months |
JW OPS 053/23 |
2023-06-20 11:00 |
2023-07-14 10:30 |
| The Appointment of Service Provider/s for the Replacement of Traffic Signal Equipment and the Maintenance of Traffic Signal Installations for all of the City of Ekurhuleni on an as and when Required Basis with Effect from Date of Award until 30 June 2026 |
A-RS 03-2023 |
2023-05-24 10:00 |
2023-06-13 10:00 |
| Panel of Contractors for the Maintenance, Repairs and Replacement of any Electrical Installation and Equipment(as and when Required) for a Period of Three(3) Years |
HPCSA 02/2023 |
- |
2023-05-03 12:00 |
| Appointment of an Electrical Contractor for Electrical Upgrade in all College Sites |
EEC/T01/2023 |
2023-03-22 10:00 |
2023-04-03 11:00 |
| Assembly and Wiring of Control Panels |
MTK 10/2022 |
2023-03-07 11:00 |
2023-03-17 12:00 |
| Strip, Quote and Repair of Northern Works Unit 3 Modulie 2 Motor Control Centre on an as and when Required Basis for a Period of Thirty-Six(36) Months |
JW OPS 041/22 |
2023-01-19 10:00 |
2023-02-06 10:30 |
| Supply, Delivery, Installation and Commissioning of the Power Supply Cable for Acacia Sewer Pump Station for a Period of One(1) Month |
JW OPS 046/21RR |
2022-12-13 11:00 |
2023-01-24 10:30 |
| Appointment of Service Providers for the Supply, Delivery and Off-Loading of Miniature Substations on an as and when Required Basis for a Period with Effect from Date of Award until 30 June 2025 |
A-EE 13-2022 |
- |
2023-01-20 10:00 |
| Maintenance of Electrical Low Voltage Equipment, Vanderbijlpark Campus |
NWUTR 104/2022 VTC |
- |
2022-11-01 12:00 |
| Repairs to Solar Lighting at Various Facilities |
JCPZ/FM05/2022 |
2022-09-16 09:00 |
2022-09-23 12:00 |
| Tenders are Hereby Invited from Contractors with the CIDB Grading of 3 EB or 2 EB PE or Higher for Electrical Maintenance and Repairs in Mogale City Local Municipality Owned Buildings and Facilities on an as and when Required Basis for a Period of Three(3) Years |
PWRT (B&F) 07/2023 |
- |
2022-08-23 11:00 |
| Design, Manufacturing, Installations and Uninstalling of Lights and Structures for a Festive Lights for Joburg City Theatres |
00244/22 |
2022-07-20 10:00 |
2022-08-01 12:00 |
| Specifications for Maintenance and Servicing of the Electric Fence. |
AFMS/42/MAY2022 |
- |
2022-07-27 12:00 |
| Electrical Upgrade Including Backup Power for Benoni Campus |
EEC/T09/2022-B |
2022-06-14 14:30 |
2022-07-04 11:00 |
| Electrical Upgrade Including Backup Power for Daveyton Campus |
EEC/T09/2022-D |
2022-06-14 12:00 |
2022-07-04 11:00 |
| Electrical Upgrade Including Backup Power for Springs Campus |
EEC/T09/2022-S |
2022-06-14 09:30 |
2022-07-04 11:00 |
| Electrical Upgrade Including Backup Power for ASDC and Brakpan Campus |
EEC/T09/2022-AB |
2022-06-13 12:30 |
2022-07-04 11:00 |
| Electrical Upgrade Including Backup Power of KwaThema Campus |
EEC/T09/2022-K |
2022-06-13 10:00 |
2022-07-04 11:00 |
| Supply, Delivery, Installation, Commissioning and Maintenance of Uninterruptible Power Supply (UPS) for Traffic Signals as and when Required for a Period of 36 Months (3 Years) |
JRA/21/166 |
- |
2022-07-12 11:00 |
| The Appointment of Service Providers for the Design, Supply, Delivery, Installation and Commissioning of Solar High Mast Lights in Informal Settlements on an as and when Required Basis from 01 July 2022 until 30 June 2025 |
A-EE 06/2022 |
- |
2022-05-23 10:00 |
| Refurbishment of Hector Nords Pump Station Including Pumps, VSD's, PLC and Associated Electrical Works |
JW 14287 |
2022-04-06 09:00 |
2022-05-06 10:30 |
| Supply, Delivery, Installation and Commissioning of the Power Supply Cable for Acacia Sewer Pump Station |
JW OPS 046/21 R |
2022-03-30 12:00 |
2022-04-25 10:30 |
| Erratum- Supply, Delivery and Installation of the LED Luminaires to Meet Energy Efficiency Demand Site Management (EEDSM) Requirements |
103/2021 |
- |
2022-02-14 12:00 |
| Supply, Delivery and Installation of the LED Luminaires to Meet Energy Efficiency Demand Site Management (EEDSM) Requirements |
103/2021 |
- |
2022-02-07 12:00 |
| Cas van Vuuren Power Upgrade |
PT2021/48 |
- |
2022-01-28 12:00 |
| Electrical Reticulation, Wiring Upgrade and New DB's for Floors 1,2 and 3 Prof Nkoana Radipere Building |
PT2021/47 |
- |
2022-01-26 12:00 |
| OR Tambo Main Incomer Upgrade |
PT2021/46 |
- |
2022-01-24 12:00 |
| Erratum- Appointment of Electrical Contractors to Install, Reinstate, and Replace Faulty Small Connection Electricity Meters on an as and when Required Basis, from 01 July 2022 until 30 June 2025 |
A-EE 02-2022 |
- |
2022-01-20 10:00 |
| Tender for the Supply, Delivery and Offloading of Instrument Transformers Required for Low-Voltage Switchgears and Medium-Voltage Metal-Clad Switchgears Installed in City of Tshwane Substations: Three-Year Period, as and when Required |
EED 42-2021/22 |
- |
2022-02-10 10:00 |
| Tender to Appoint a Service Provider to Supply, Install, Commission and Maintain Lights in the Market Trading Halls of Tshwane Fresh Produce Market: Three-Year Period, as and when Required |
ED 02-2021/22 |
2021-12-10 10:00 |
2022-01-27 10:00 |
| Appointment of Electrical Contractors to Install, Reinstate, and Replace Faulty Small Connection Electricity Meters on an as and when Required Basis, from 01 July 2022 until 30 June 2025 |
A-EE 02-2022 |
- |
2022-01-20 00:00 |
| Appointment of Consulting Electrical Engineers for Professional Services for Electrical Reticulation Infrastructure Projects of Various Areas on an as and when Required Basis from Date of Award until 30 June 2024 |
PS-EE 22-2021 |
- |
2021-12-09 00:00 |
| Northern Wastewater Treatment Works (NWWTW): Infrastructure Renewal Plan Phase 1- Electrical Medium Voltage (MV) Upgrade and Refurbishment |
JW 14054 |
2021-11-03 13:00 |
2021-12-07 10:30 |