| Supply and Delivery of Electrical Armadec Cables |
SCMPRO16292/GGHNP/2025 |
- |
2025-09-25 16:00 |
| Sogoni Phase 2 Electrification |
UMZ/2025-26/INFRA/INEP/002 |
2025-06-30 10:00 |
2025-07-10 12:00 |
| Supply and Delivery of Switch Disconnect: Remove, Cstl;22 Kv; 630a |
E1444DXEC |
- |
2025-08-05 10:00 |
| Mbda05937 Supply and Delivery of High-quality Torches |
MBDA05937 |
- |
2025-07-02 11:00 |
| Appointment of Electrical Contractor for the Construction of 11kv Stutterheim Main Intake Substation. |
ALM/SCM/48/2024-25 |
2025-07-01 11:00 |
2025-07-23 12:00 |
| Appointment of Electrical Contractor for the Construction of 22/11kv 2 X 2,5mva Cathcart Substation. |
ALM/SCM/47/2024-25 |
2025-06-30 10:00 |
2025-07-23 12:00 |
| Scmu3-25/26-0100-dng Supply and Delivery of Electrical Maintenance Material at Dora Ngiza Hospital New |
Scmu3-25/26-0100-dng |
- |
2025-06-23 11:00 |
| The Manufacture, Testing, Supply, Delivery, Off-loading, Erection, Commissioning, (inclusive of Spares and Training), of Estimated Quantities of High Voltage Switchgear That Includes Voltage Category Range of 275kv to 765kv Disconnectors and Earthing Switches for Ntcsa on “an as and when Required” Basis for a Five (5) Year Period. |
E1395NTCSAMWP |
2025-06-27 10:00 |
2025-08-28 10:00 |
| The Design, Manufacture, Testing, Supply and Delivery of Line Hardware on an “as and When” Required Basis for a Period of 5 (five) Years for Ntcsa. |
E1396NTCSAMWP |
2025-06-26 10:00 |
2025-07-30 10:00 |
| Gqet25/26/05 Addendum |
GQET25/26/05 Addendum |
- |
2025-07-16 11:00 |
| Gqet25/26/04 Addendum |
GQET25/26/04 Addendum |
- |
2025-07-16 11:00 |
| Gqet25/26/03 Addendum |
GQET25/26/03 Addendum |
- |
2025-07-16 11:00 |
| Advert-Library Facilities Maintenance |
WMM-LM 02/06/25/01 LFM |
- |
2025-06-16 12:00 |
| Appointment of the Service Provider to Design,supply and Install a 3kva Solar Home System Project:66 Households |
SLM/SCM/62/2024/2025 |
- |
2025-06-20 12:00 |
| The Design, Detailed Engineering, Manufacture, Testing at Works,
Supply, Delivery, Placement on Foundation, Installation, Erection,
Testing, Commissioning of Power Transformers at Various Sites For
Various Power Stations. |
E1063CXMWP |
- |
2025-06-18 10:00 |
| Provision to Refurbishment of Substation 1a and 1b at Ngqura Container Terminal for Transnet Soc Ltd (reg No:1990/000900/30) Operating as Transnet Port Terminals (hereinafter Referred as “tpt”) for Ngqura Container Terminal as a Once Off) |
ICLM PE 746/TPT |
2025-06-10 11:00 |
2025-07-04 14:00 |
| Moulded Fibreglass Grating, Readyboard 40a Pre- Wired., Joint Trough, Line Taps 16sqmm, Crimping Lugs 95mm2, Crimping Lugs 240mm. |
SQ05253023 |
- |
2025-06-03 |
| Conductor, Cable, Cable |
SQ05253017 |
- |
2025-06-03 |
| Distribution Units, Distribution Units, Distribution Units, Traffic Heads, Traffic Heads |
SQ05253020 |
- |
2025-06-03 |
| Electrification of 200 Houses (phase 3) at Ocean View
In Jeffreys Bay (dmre Work 2025/26): Specification No. G/10677/ |
116/2025 |
2025-05-30 10:00 |
2025-06-09 12:00 |
| Queenstown Area: Supply & Delivery of Building, Electrical, Painting, Caroentry & Plumbing Materials to Workshops for a Period of Thirty Six (36) Months |
GQET-25/26-05 |
2025-06-06 11:00 |
2025-07-16 11:00 |
| East London Area: Supply & Delivery of Building, Electrical, Painting, Carpentry & Plumbing Materials to Workshops for a Period of Thirty Six (36) Months. |
GQET-25/26-04 |
2025-06-05 11:00 |
2025-07-16 11:00 |
| Gqeberha Area: Ndpwi: Supply & Delivery of Building, Electrical, Painting, Carpentry & Plumbing Materials to Workshops for a Period of Thirty Six (36) Months. |
GQET-25/26-03 |
2025-06-04 11:00 |
2025-07-16 11:00 |
| Electrification of 200 Houses (phase 3) at Ocean View
In Jeffreys Bay (dmre Work 2025/26): Specification No. G/10677/e |
116/2025 |
2025-05-30 10:00 |
2025-06-09 12:00 |
| Erection of Street Lights in Ext 2 |
MNQ/SCM/19/25-26. |
- |
2025-06-23 12:00 |
| Appointment of a Contractor for Electrification of 221 Households and 10 Km Link Line Upgrade |
MNQ/SCM/18/25-26 |
2025-05-29 10:00 |
2025-06-23 12:00 |
| Erection of Street Lights in Ext 2 |
MNQ/SCM/19/25-26 |
2025-05-29 10:00 |
2025-06-23 12:00 |
| Appointment of a Contractor for Electrification of 221 Households and 10km Link Line Upgrade |
MNQ/SCM/18/25-26 |
2025-05-29 10:00 |
2025-06-23 12:00 |
| Readyboard 40a Pre-wired. |
SQ05253010 |
- |
2025-06-02 |
| Ferrule 120mm, Wire Tinned 1.25mm |
SQ05253009 |
- |
2025-06-02 |
| Construction of Bhubesini Link Line and Electrification of Households |
UMZ/2024-25/INFRA/INEP/0010 |
2025-05-20 10:00 |
2025-05-28 12:00 |
| Supply and Delivery of Light Bulbs to Post Offices in the Pe and Mid-lands Areas. |
RFQ 25-26-20 |
- |
2025-05-23 11:00 |
| Supply, Delivery and Installation of X 5 High Mast Lights at Ward 4, Ward 10, Ward 13, Ward 16 and Ward 20 on Behalf of Port St Johns Municipality |
PSJLM-ENG-2024/25-28 |
2025-05-21 10:00 |
2025-05-30 11:00 |
| Fuse Unit |
SQ05253011 |
- |
2025-05-23 |
| Clamps P/g Gold, Gloves Insulated, Ferrules 185mm weak Back, Straight Connectors Mv 95, Wire Tinned 0.8mm |
SQ05253008 |
- |
2025-05-26 |
| Joint Boxes Straight |
SQ05253004 |
- |
2025-05-23 |
| The Design, Manufacture, Testing, Quality Assurance, Training of Eskom Personnel, Delivery to Eskom Sites or Warehouses, Off-loading and if Required, Erection, Commissioning, Decommissioning and Disposal of Valve-regulated Lead Acid Cells and Vented Lead Acid Cells. the Scope Includes Battery Enclosures, Battery Stands, Accessories and Its Ancillary Equipment on an "as and when Require" Basis for a Period of Five (5) Years. |
E1270DXWC |
2025-05-29 10:00 |
2025-07-08 10:00 |
| Gloves Insulated Size 9, Gloves Insulated Size 10, Solder Alca-p 250grm. Sticks., Earth Fault Indicators., Heatshrink Tubing, Electro-line |
SQ05252999 |
- |
2025-05-22 |
| Cable 16mm, Cable 10sq, Consumer Distribution, Consumer Distribution, Cable 16sq Mm |
SQ05253002 |
- |
2025-05-22 |
| Cable 240 Mm, Cable 95 Sq, Cable 16mm, Cable 25mm, Cable 35 Sq, Cable 70sq, Cable 16mm |
SQ05253000 |
- |
2025-05-22 |
| Pipes, Circuit Breakers, Insulators |
SQ05253001 |
- |
2025-05-21 |
| Specification and Schedules for the Supply, Installation and Commissioning of the General Electrical and Distribution Items |
MBTC-SCM/31/2025 |
2025-05-15 10:00 |
2025-05-28 12:00 |
| Circuit Breaker 100amp |
SQ04252996 |
- |
2025-05-19 |
| Sleeves Abc Preinsulated Reduced Tension Junction. |
SQ04252991 |
- |
2025-05-13 |
| Distribution Boxes 63amp., Joint Boxes Straight, Joint Boxes Straight, Relay 12v Dc, Contactor Dilm 32-10, Relay 200/220/240, Strip, Copper -20mtr Roll |
SQ04252993 |
- |
2025-05-13 |
| Fencing, Construction of Slab, Electrification and Installation of Cold Storage for Cuthwini Village |
IHLM/85/2024-25/ECON_ |
- |
2025-05-19 12:00 |
| Appointment of a Contractor to Render Turnkey Services for Supply and Installation of Solar Backup System at or Tambo Garden Of
Remembrance in Bizana, Eastern Cape Province. |
NMM-GOR-2025-04. |
- |
2025-05-14 12:00 |
| Fuse Unit |
SQ04252994 |
- |
2025-04-29 |
| Solder Alca-p 250grm Sticks., Dead End Plugs abc, Strapping ,stainless Steel., Ready Board 40a Pre-wired., Straight Connectors, Lugs Pre-insulated. |
SQ04252987 |
- |
2025-04-30 |
| Joint Boxes Straight, Joint Boxes Straight, Ferrules 95mm, Ferrules 120mm Weak Back., Ferrules 150mm, Ferrules 185mm, Solder Alca.p 250gram Sticks. |
SQ04252988 |
- |
2025-04-30 |