| Supply and Delivery of Electrical Material 05 |
IYM05/11/2024Q |
- |
2024-12-03 12:00 |
| Panel of Three (03) Service Providers for Supply and Delivery of Electrical Material for a Period of Three (03) Years as and when Needed (two Additional) |
SCM: 065-2022-23 |
- |
2024-12-19 12:00 |
| Fuse Unite 400amp., Connectors Insulation, Joints Boxes Straight, Joint Boxes Straight 300mm, Joint Boxes Straight 150mm |
SQ11242850 |
- |
2024-12-05 |
| Line Taps 16mmsq, Line Taps 35mmsq, Line Taps 50mmsq, Line Taps 70sqmm, Line Taps 95sqmm |
SQ11242858 |
- |
2024-12-05 |
| Ferrules 120mm, Ferrules 95mm, Ferrules 150mm, Ferrules 185mm |
SQ11242846 |
- |
2024-12-04 |
| Panel of Three (03) Service Providers for Supply and Delivery of Electrical Material for a Period of Three (03) Years as and when Needed (two Additional) |
065/2022/23 |
- |
2024-12-19 12:00 |
| Fencing, Electrification, Supply and Installation of Cold Storage for Cuthwini Village |
IHLM/46/2024-25/ECON |
- |
2024-12-09 12:00 |
| Ferrules 150mm, Ferrules 95mm, Ferrules 120mm |
SQ11242845 |
- |
2024-12-03 |
| SASSA 12-24-FM-EC Invitation of prospective bidders for supply,installation and commissioning of hybrid inverter,solar panel and lithium battery to serve as backup electricity supply for 4 local offices |
SASSA 12-24-FM-EC |
2024-11-29 10:00 |
2024-12-13 11:00 |
| Invitation of Prospective Bidders for Supply, Installation and Commissioning of Hybrid Inverter, Solar Panel and Lithium Battery to Serve as Backup Electricity Supply for Four (4) Local Offices in the Eastern Cape Region. |
SASSA: 12-24-FM-EC |
2024-11-29 10:00 |
2024-12-12 11:00 |
| Supply and Delivery of Lights and Light Fittings to Addo Elephant National Park |
SANP-182889-24 |
- |
2024-11-26 11:00 |
| Lugs Cne, Tinned Wire Copper 2.0mm, Lugs 240mm X 20mm Hole., Lugs 10mm, Lugs Copper 16mm |
SQ11242844 |
- |
2024-12-02 |
| Panel of Three (03) Service Providers for Supply and Delivery of Electrical Material for a Period of Three (03) Years as and when Needed (two Additional) |
065/2022/23 |
- |
2024-12-19 12:00 |
| Traffic Heads |
SQ11242840 |
- |
2024-11-27 |
| Scheduled Maintenance of Medium Voltage Facilities-nelson Mandela Bay and Sarah Baartman Districts for a Period of 36 Months – Health Facilities |
SCMU3-24/25-0461-HO |
2024-11-29 11:00 |
2024-12-13 11:00 |
| The Supply, Installation and Commissioning of the Electrical Distribution Items |
MBTC-SCM/84/2024 |
2024-11-22 10:00 |
2024-12-02 12:00 |
| The Supply, Installation and Commissioning of the General Electrical Items |
MBTC-SCM/83/2024 |
2024-11-22 11:00 |
2024-12-02 12:00 |
| Ferrules 70mm, Cloth Empire, Ferrules 185mm |
SQ11242827 |
- |
2024-11-26 |
| Wire Surfix 1.5mm |
SQ11242825 |
- |
2024-11-26 |
| Fuse Carrier, Paraffin |
SQ11242837 |
- |
2024-11-25 |
| Bituminous Compound, Solder Alcap, Plumbers Metal.500gram Sticks, Float Switch |
SQ11242814 |
- |
2024-11-25 |
| Lamps |
SQ11242826 |
- |
2024-11-22 |
| Tape Insulation black, Wire Tinned 2.0mm, Wire Tinned 1.6mm |
SQ11242810 |
- |
2024-11-25 |
| Barrier netting, Joint Boxes Straight., Resin Oil in 20ltr, Resin Oil in 5ltr |
SQ11242816 |
- |
2024-11-22 |
| Connectors Straight, Wire Surfix 1.5mm Black, Fuse Carrier Bake Lite. |
SQ11242817 |
- |
2024-11-22 |
| Circuit Breakers 100amp, Circuit Breakers 125amp., Joints Splicing Kits., Strapping Stainless Steel., Buckles 19mm Stainless Steel, Clamps P/g Gold |
SQ11242811 |
- |
2024-11-21 |
| Connectors Insulation.piercing., Joint Boxes Straight., Joint Boxes Straight, Terminations Shrinkable Straight., Terminations Shrinkable, Joint Boxes Straight, Terminations Heatshrink. |
SQ11242807 |
- |
2024-11-21 |
| Supply, Delivery, Off-Loading, Installation and Testing of 11 Kv and 33 KV Metal Enclosed Double Busbar Fixed Pattern Switchgear for a Fixed Period of Thirty-Six Months |
27648-5E |
- |
2024-12-13 11:00 |
| Line Taps 35sqmm, Line Taps 16sqmm, Line Taps 16sqmm, Line Taps 50sqmm., Line Taps 70sqmm, Line Taps 95sqmm |
SQ11242808 |
- |
2024-11-20 |
| Poles, Ticket, Key Tools, Shackles Tower, Insulators, Clamps, Clamps |
SQ10242795 |
- |
2024-11-14 |
| Cables |
SQ10242798 |
- |
2024-11-14 |
| Cables |
SQ10242797 |
- |
2024-11-14 |
| Cables |
SQ10242799 |
- |
2024-11-14 |
| Circuit Breakers, Insulators |
SQ10242800 |
- |
2024-11-14 |
| Fuse Carrier, Brackets, Bolts, Surge Arrestor, Bolts, Dead Ends, Dead End |
SQ10242802 |
- |
2024-11-14 |
| Joint Boxes, Lugs, Ferrules, Stay Rods, Boxes Marshalling |
SQ10242801 |
- |
2024-11-14 |
| Cross Arms, Insulator |
SQ10242796 |
- |
2024-11-14 |
| Dead End, Straps, Line Splice, Fuse Link, Fuse Link, Cross Arm, Cross Arms |
SQ10242803 |
- |
2024-11-14 |
| Conductor |
SQ10242792 |
- |
2024-11-14 |
| Electrification of Maluti Depot Training Centre, Alfred Nzo Region for a Period of Four (4) Months |
ALF5-24/25-0045 |
- |
2024-11-20 11:00 |
| Request for Quotation (rfq) Request for the Supply of Auxiliary Generator, Exciter and Head Lights for East London in a Once off Basis at Prasa in the Eastern Cape Region. |
ECR/RAIL/RS/02/11/2024 |
- |
2024-11-08 12:00 |
| Re-advert: Proposal 132/11kv Eskom Leaches Bay Substation 40mva Capacity Upgrade |
ES/24/ELEC/LEACHESBAY/ 40MVA/02 |
2024-11-12 11:00 |
2025-01-15 12:00 |
| Heat Shrink Tubing, Preinsulated Lugs. |
SQ10242794 |
- |
2024-11-12 |
| Led Flood Lights 200w |
SQ10242805 |
- |
2024-11-12 |
| Scmu3- P24/25-0635- Luk Supply and Delivery of Light Bulbs for Lukhanji Sub-district and Chc’s New |
Scmu3- P24/25-0635- Luk |
- |
2024-11-04 11:00 |
| Line Taps 95sqmm, Boot Right Angle, Pig Tail 400mm*16mm, Wire Surfix 1.5mm, Wire Pvc Green |
SQ10242788 |
- |
2024-11-11 |
| Tee Connectors |
SQ10242790 |
- |
2024-11-11 |
| Rods Earth Grade A. |
SQ10242782 |
- |
2024-11-08 |
| Grp Moulded Fibreglass Grating, Line Taps 70sqmm, Line Taps 35sqmm, Barrier Netting |
SQ10242789 |
- |
2024-11-08 |
| For Annual Maintenance & Service of Standby, Mobile Diesel Generators and Electric Equipment at Tanker Berth for a Period of Thirty-six (36) Months at the Port of East |
TNPA/2024/10/0027/81014/RFQ |
2024-11-11 00:00 |
2024-11-15 16:00 |