| Refurbishment of Kriel Ps Generator Circuit Breaker (gcb) Compressor Plant Control Circuit at Units 1 & 4 for a Period of 12 Months. |
E2192GXMPKRIR |
2026-07-28 10:00 |
2026-08-07 10:00 |
| Supply and Delivery of Fuses for All Areas in the Matla Power Station for the Period Of
Five (5) Years |
E3158GXMPMAT |
2026-07-10 10:00 |
2026-07-27 10:00 |
| The Replacement of the Existing Dpi (dip Proof Inverters) with Control Uninterruptable Power
Supplies (upss) for Kriel Power Station 6 Units for a Period of 2 Years. |
E2828GXMPKRIR |
- |
2026-06-03 10:00 |
| Supply and Delivery of Medium Voltage Circuit Breakers on an as and when Required Basis for the Period of Five (5) Years |
E2730GXMPKRI |
2026-04-09 10:00 |
2026-06-26 10:00 |
| Refurbishment of Kriel Ps Generator Circuit Breaker (gcb) Compressor Plant Control Circuit at Units 1 & 4 for a Period of 12 Months. |
E2192GXMPKRI |
2025-11-25 09:00 |
2026-01-23 10:00 |
| Refurbishment of Medium Voltage Circuit Breakers on an “as and When” Required Basis at Kriel Power Station for a Period of Five Years. |
E1704GXMPKRI |
2025-09-04 10:00 |
2025-09-23 10:00 |
| The Supply and Delivery of Outside Plant Spares at Kriel Power Station Over for 5
Years |
E1386GXMPKRI |
2025-07-01 13:00 |
2025-07-25 10:00 |
| Supply of Generator Protection Relay Replacement Spares for Unit 1,3,4 and 6 as a Once-off Contract at Kriel Power Station |
MPKRI11337GX |
2024-10-29 10:00 |
2024-11-11 10:00 |
| Supply and Delivery of Electrical Spares for U5 Outage at Kriel Power Station on a Once off Basis. |
MPKRI11231GX |
- |
2024-09-11 10:00 |
| Decommissioning of the Old Oil Ring Main Units, Transportation, Installation, Cabling, Testing and Commissioning of the New Ring Main Units at Kriel Power Station for a Period of 6 Months |
MPKRI11187GX |
2024-06-28 09:00 |
2024-07-08 10:00 |
| Design, Supply, and Delivery of Kriel Power Station Generator Excitation System for Unit 1,2,3&5 for a Period of 3 Years Main Stores. |
Cancellation-MPKRI10518GX |
- |
2024-05-16 11:00 |