| Supply, Delivery Installation, Testing and Commissioning of Two (02) Complete Battery Charger with Visible Nicad Type Batteries for Stubb Substation |
36 of 2025 |
- |
2025-07-14 12:00 |
| Supply, Delivery, Installation and Commissioning of Abb Drives for Chiller Upgrade at Sarao Hartebeesthoek Radio
Astronomy Observatory Site in Gauteng |
SARAO HART 024-2025-26 |
- |
2025-07-18 11:00 |
| Tender for Maintenance and Repair of Flow Meters, Controllers, Dissolved Oxygen Meters and Low Voltage Electrical Panels at the Water and Sanitation Department, as and when Required for a 3-year Period |
WS 03-2024/25 |
2025-07-07 10:00 |
2025-07-22 10:00 |
| Appointment of a Service Provider for the Supply, Installation and Commissioning Maintenance of Gate Motor and Biometric Access Control System for the South African National Biodiversity Institute at the Kwa-zulu Natal National Botanical Garden (kzn Nbg) |
Q11481-2025 |
2025-07-08 10:00 |
2025-07-16 11:00 |
| Procurement of Electrical Maintenance and Repairs Within West Rand District and Local Offices |
GP/25/06/19 |
2025-06-27 11:00 |
2025-07-04 11:00 |
| Tender for the Appointment of a Contractor for the Upgrading of Ekangala Roads and Stormwater Systems in Ekangala-ward 103 for a Duration of 12 Months. |
RTD 19-2024/25 |
2025-07-03 10:00 |
2025-07-24 10:00 |
| Tender for the Appointment of a Contractor for the Completion of the Infrastructure in Garankuwa Extension Ten (10) Over a Period of 20 Months. |
HS 03-2024.25 |
2025-07-02 10:00 |
2025-07-29 10:00 |
| Tender for the Appointment of a Contractor for the Upgrading of Roads and Stormwater Systems in Ga Rankuwa Zone 4: Phase 2 for a Period of 18 Months |
RTD 18-2024/25 |
2025-07-01 10:00 |
2025-07-23 10:00 |
| R/s/20252026/918 |
R/S/2526/918 |
2025-07-01 11:00 |
2025-07-08 11:00 |
| Supply and Installation of a Shade Port with Gear Blinds and Veranda at a Staff House in the Knysna Section of the Garden Route National Park |
RFQ 28/2025 |
2025-07-01 10:00 |
2025-07-08 11:00 |
| Supply, Install and Servicing of Fire Extinguishers at Midmar Training Centre for the Period of 36 Months. |
EKZNW 23.06.2025 |
2025-07-01 11:00 |
2025-07-08 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/191/25 |
2025-07-22 10:00 |
2025-07-29 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/187/25 |
2025-07-22 10:00 |
2025-07-29 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/198/25 |
2025-07-15 10:00 |
2025-07-22 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/186/25 |
2025-07-22 10:00 |
2025-07-29 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/195/25 |
2025-07-15 10:00 |
2025-07-22 11:00 |
| Refurbish, Repaint the Exterior Walls of Building 972 (BSO) |
NBS/FAC/84/25 |
2025-07-17 10:00 |
2025-07-24 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/193/25 |
2025-07-17 10:00 |
2025-07-24 09:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/189/25 |
2025-07-17 10:00 |
2025-07-24 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/197/25 |
2025-07-17 10:00 |
2025-07-24 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/183/25 |
2025-07-24 10:00 |
2025-07-31 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/182/25 |
2025-07-24 10:00 |
2025-07-31 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/181/25 |
2025-07-10 10:00 |
2025-07-17 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/178/25 |
2025-07-10 10:00 |
2025-07-17 09:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/194/25 |
2025-07-08 10:00 |
2025-07-15 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/185/25 |
2025-07-08 10:00 |
2025-07-15 09:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/176/25 |
2025-07-10 10:00 |
2025-07-17 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/190/25 |
2025-07-10 10:00 |
2025-07-17 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/199/25 |
2025-07-24 10:00 |
2025-07-31 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/180/25 |
2025-07-10 10:00 |
2025-07-17 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/201/25 |
2025-07-08 10:00 |
2025-07-15 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/175/25 |
2025-07-10 10:00 |
2025-07-17 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/200/25 |
2025-07-10 10:00 |
2025-07-17 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/177/25 |
2025-07-10 10:00 |
2025-07-17 11:00 |
| Repair / Refurbish or Replace the Damaged Roof Structure |
NBS/FAC/184/25 |
2025-07-03 10:00 |
2025-07-10 11:00 |
| Establishment of a Panel of Five Contractors for Disaster Projects for a Period of 36 Months -as and when Needed |
BID 38/2025 |
2025-07-01 10:00 |
2025-07-21 12:00 |
| Construction of Ndlangisa Pedestrian Bridge |
PWBS-B06/25/26 |
2025-07-03 10:30 |
2025-07-11 12:00 |
| Construction Jackson Road Causeway |
PWBS-B05/25/26 |
2025-07-03 10:30 |
2025-07-11 12:00 |
| Provision of Supply, Replace and Installation of New Air-conditioning Units Including Repairs, Maintenance and Service of the Existing Air-conditioning Units of the Airports Buildings for a Period of Three Years. |
GAAL/133/2024/2025 |
2025-06-30 10:00 |
2025-07-11 11:00 |
| Eskom Megawatt Park (mwp) Perimeter Security Fence and Mini Substation Infrastructure Upgrade Project |
E1393CXMWP |
2025-07-02 10:00 |
2025-07-28 10:00 |
| Request for Information (rfi) in Respect of the Sale of Two (2) Tm2500 Mobile Power Units |
TNPA/2025/05/0006/97357/RFI |
2025-06-04 00:00 |
2025-07-30 16:00 |
| Request for Proposals for the Appointment of a Liquid Bulk Terminal Operator to Design, Finance, Develop, Construct, Operate, Maintain and Transfer a Liquid Bulk Terminal for a Concession Period of Twenty-five (25) Years at the Port of Ngqura |
TNPA/2024/10/0013/79500/RFP |
2025-07-09 10:00 |
2025-12-12 16:00 |
| Rebuilding of Tarentaal to Tzaneen 66kv Feeder Line Phase 1 |
SCMU 23/2025 |
2025-07-02 10:00 |
2025-07-21 12:00 |
| Supply, Install and Commission Scada System on the Gtm Electrical Network in Phases: Phase 2
Installation and Commissioning of Free Issue Scada Equipment and Other Works |
SCMU 22/2025 |
2025-07-01 10:00 |
2025-07-21 12:00 |
| Construction of Runnymade Sports Facility |
SCMU 24/2025 |
2025-07-03 10:00 |
2025-07-21 12:00 |
| Construction of a Wastewater Treatment Plant (Package Plant),Robben Island |
RIM06-IFM-2025/26 |
2025-07-02 09:00 |
2025-07-11 11:00 |
| Upgrading of Malengenge to Serututung Access Road from Gravel to Paving |
SCMU 25/2025 |
2025-06-30 10:00 |
2025-07-21 12:00 |
| The Provision of Facilities Maintenance Services for Non-Plant Infrastructure at Koeberg Nuclear Power Station (KNPS) |
E1429GXWCKBG |
- |
2025-07-23 10:00 |
| Appointment of a Suitable Service Provider to Arrange Accommodation in Olifantsfontein for 6 Aptcod Learners and 2 Drivers from Dpwi, Chris Hani District, as Per the Specification |
CHR5-25/26-0021 |
- |
2025-06-30 11:00:00 |
| Rehabilitation of the Robben Island
Helistop and Parking Pads |
RIM07-IFM-2025/26 |
2025-07-09 09:00 |
2025-07-25 11:00 |