| Service of Power Transfomers |
dpm99 |
2026-07-01 10:30 |
2026-07-03 11:00 |
| Transformer Repairs and Overhauling- Price Validity Extension |
ERI2025TSS/LE |
- |
2026-07-31 11:00 |
| Transformer Refurbishment for Electrical Department Under Koedoespoort Infra Depot |
TRIM/2026/04/0798/4785/RFQ |
2026-06-22 10:30 |
2026-07-10 10:00 |
| Request for Strategic Partner – Selection of Sub Executing Agency for Implementation of Gef8/gbff Project |
GNP-113A-25 |
- |
2026-07-06 11:00 |
| Provision of Annual Maintenance for Mini-substations and Rmu at Tnpa – Infra-electrical Department in the Port of Richards Bay |
TNPA/2026/06/1346/7597/RFQ |
2026-07-02 11:00 |
2026-07-06 12:00 |
| Bid Number - 2639s - Transformer and Switchgear Testing. |
BID - 2639S |
- |
2026-07-30 11:00 |
| Maintenance to Power Stations |
LBWG/PQ/AFL/149/26 |
2026-06-30 13:45 |
2026-07-13 11:00 |
| Supply and Delivery of 11000/420 -242 Volt +/-5% (sans 780) Power Distribution Transformers for a Period of Three Years. |
CE:660 |
- |
2026-07-17 11:00 |
| Bid No 26 of 2026 Supply and Delivery of 1mva 22 11kv Transformer |
26 / 2026 |
- |
2026-07-06 12:00 |
| Bid No 27 of 2026 Maintenance of 10mva 66 22kv Transformer at Levubu Substation |
27 / 2026 |
- |
2026-07-06 12:00 |
| Design and Supply Transformer Cores and Shunts for a Period of 5 Years |
E0926TSSERIR |
2026-06-25 10:00 |
2026-07-13 10:00 |
| Appointment of a Service Provider for Insulating/testing as and when Required for 36 Months |
KZN/PRASA/2026/06/06/Q |
- |
2026-07-06 12:00 |
| Panel for Service Providers to Provide Testing, Inspection, Maintenance, Repairs, and Servicing Transformers and Various Medium Voltage Motors, Electrical Distribution and Protection Equipment for Amatola Water Pump Stations and Water Treatment Works for Three (3) Years on Ad-hoc Basis |
AW2025/26/14 |
2026-06-25 11:00 |
2026-07-09 11:00 |
| Repairs to Substations inside Compressor House, Bay2, Bay28 and Bay55 |
TE/2026/03/1061/3623/RFP |
2026-06-04 11:00 |
2026-07-01 11:00 |
| 9-2-342 Supply and Delivery of Transformers |
9/2/342 |
- |
2026-06-23 12:00 |
| Repairs to Substations inside Compressor House, Bay2, Bay28 and Bay55 |
TE/2026/03/1061/3623/RFP |
2026-06-04 11:00 |
2026-07-01 11:00 |
| 9-2-299 Refurbishment of Transformers (re-advert) |
9/2/299 |
- |
2026-06-23 12:00 |
| Maintenance of 10mva 66/22kv Transformer at Levubu Substation |
27 of 2026 |
- |
2026-07-06 12:00 |
| Trim/2026/04/0798/4785/rfq |
TRIM/2026/04/0798/4785/RFQ |
2026-06-22 10:30 |
2026-06-29 10:00 |
| Transformer Refurbishment for Electrical Department Under Koedoespoort Infra Depot |
TRIM/2026/04/0798/4785/RFQ |
2026-06-22 10:30 |
2026-06-29 10:00 |
| Adverts for July 2026 |
8/3/2/2162 |
- |
- |
| Maintenance of 10mva 66/22kv Transformer at Levubu Substation |
27 OF 2026 |
- |
2026-07-06 12:00 |
| Supply and Delivery of 1mva 22/11kv Transformer |
26 OF 2026 |
- |
2026-07-06 12:00 |
| Fq 130/26: Loading, Transportation, Offloading and Repositioning of Power Transformers |
FQ 130/26 |
2026-06-17 10:00 |
2026-06-23 08:00 |
| Transformer Refurbishment for Electrical Derpartment Under Koedoespoort Infra Depot |
TRIM/2026/04/0798/4785/RFQ |
2026-06-22 10:30 |
2026-07-10 10:00 |
| Appointment of a Panel of Service Providers for Supply and Delivery and Off-loading and Distribution of Transformers and Refurbishment of Transformers and Mini Sub-station for the Period of 36 Months. Re-advert |
(Re-Advert )8/3-54/2024 |
- |
2026-07-14 12:00 |
| Rfq- Annual Major Service & Oil Change on 12 Transformers at Sanpc, Milnerton. |
SANPC406/06/2026 |
2026-06-12 11:00 |
2026-06-19 16:00 |
| Trim/2026/04/0798/4785/rfq |
TRIM/2026/04/0798/4785/RFQ |
2026-06-17 10:30 |
2026-06-25 10:00 |
| Service Providers for Supply and Delivery of Transformers, Mini Substations, Switchgear, Tools, and Associated Electrical Equipm |
9/3/1/431 |
- |
2026-07-17 12:00:00 |
| Draw Oil Sample from Mini Substation Transformers & Top Up Oil |
THH 08 2026 27 |
2026-06-09 10:00 |
2026-06-12 11:00 |
| Panel of Five (5) Service Providers for Supply and Delivery of Transformers, Mini Substations, Switchgear, Tools, and Associated Electrical Equipment as and when Required for a Period of 36 Months |
9/3/1/429 |
- |
2026-07-17 12:00 |
| Major Service Ht Transformer, Mv Switch Gears, Rmu Units, All Ht, Mv Equipment & Panels Power Factors |
PMM-187-26-27 |
2026-06-09 09:30 |
2026-06-15 11:00 |
| Major Service of Transformer and Switch Gear |
MVH064 |
- |
2026-06-09 11:00 |
| Manufacture, Testing, Supply and Delivery of Csp Transformers |
SCM/1333/G/2025-2026 |
- |
2026-07-16 11:00 |
| Appointment of a Service Provider for Electrical Infrastructure Upgrade Project: Supply and Install a 1250 Kva Transformer, Removal of Existing Transformer, Db Rewiring, Lighting and Small Power Rectification, Earthing & Lightning Protection Upgrades with |
CIDB/004/2627 |
2026-06-12 11:00 |
2026-06-29 11:00 |
| Supply, Installation, Testing, and Commissioning of the Schweitzer Engineering Laboratories (sel- 487e) Protection Scheme for the 20 Mva 66/11 Kv Transformer No. 3 at Unitra Substation, Including H-frame and Low Voltage (lv) Bus Support for a Period of Six (06) Months Unitra Substation, Including H-frame and Low Voltage (lv) Bus Support for a Period of Six (06) Months. (re-advert) |
SCM NO: 025-2025/26 |
- |
2026-07-09 12:00 |
| Appointment of a Service Provider for Electrical Infrastructure Upgrade Project: Supply and Install a 1250 Kva Transformer, Removal of Existing Transformer, Db Rewiring, Lighting and Small Power Rectification, Earthing & Lightning Protection Upgrades with Three-year Maintenance Services at the Cidb Head Office in Centurion |
CIDB 004/2627 |
2026-06-12 11:00 |
2026-06-29 11:00 |
| Electrical Network Decentralisation Project - Hatfield Campus |
RFT-202605-00528 |
2026-05-22 10:00 |
2026-06-05 12:00 |
| Refurbishment of 500kva Distribution Transformer at Various 11kv
Substation Ring of 6 Substation and Each Substation Contain 2 Transformers at Vhd East and One 20mva, 25kv Traction Substation Iswepe Under the Control of the Depot Engineer, Vryheid |
TRIM/2026/03/0200/2196/RFQ |
2026-05-25 10:30 |
2026-06-12 10:00 |
| Assessment and Repairs of High Frequency and Tr Set Transformers for Unit 4 and Unit 1 at Lethabo Power Station for a Period of 12 Months. |
E3000GCDGXLET |
2026-06-05 10:00 |
2026-06-17 10:00 |
| Draw Oil Samples for Mini Substation Transformers & Top Up Oil |
thh 08 |
2026-06-03 10:00 |
2026-06-09 11:00 |
| Refurbishment of 500kva Distribution Transformer at Various 11kv Substation Ring Are 6 Substation and Each Subs Contain 2 Transformer Vhd East and 20mva, 25kv Traction Substation Iswepe Under the Control of the Depot Engineer, Vryheid |
TRIM/2026/03/0200/2196/RFQ |
2026-05-25 10:30 |
2026-06-12 10:00 |
| The Maintenance and Refurbishment of Medium Voltage Transformers, Standby Diesel Generators and Station Continuity Testing on an “as and when Required Basis” at Arnot Power Station for a Period of 60 Months |
E2993GXMPARN |
- |
2026-06-30 10:00 |
| Mv switchgear, transformer and minisubstation maintenance and training |
253S/2025/26 |
2026-06-12 10:00 |
2026-07-15 10:00 |
| Mv Switchgear, Transformer and Minisubstation Maintenance and Training |
253S/2025/26 |
2026-06-12 10:00 |
2026-07-15 10:00 |
| Supply & Delivery of Analogues & Current Transformers |
6000080509 |
- |
2026-06-04 12:00 |
| Annual Service to Mini Subs Station |
GJM-60 26.27 |
- |
2026-06-01 11:00 |
| For the Supply, Install and Commission 3kv Dc 6mva Traction Transformer at Hamelfontein 3kv Dc Traction Substation Under Control Depot Engineer, Ermelo |
TRIM/2026/04/0693/4301/RFP |
2026-05-11 11:00 |
2026-05-29 10:00 |
| Electrical Substations |
TE/2026/03/1061/3623/RFP |
2026-06-04 11:00 |
2026-06-24 11:00 |
| Major Service for Transformer |
HLB 030 26-27 |
- |
2026-06-03 11:00 |