Panel of Contractors for Preventative Maintenance, Service and Repair of Electrical High Tension Reticulation for 24 Months in Mopani Areas |
PLK24/14 |
2024-04-30 10:00 |
2024-04-30 11:00 |
Panel of Contractors for Preventative Maintenance, Service and Repair of Electrical High Tension Reticulation for 24 Months in Capricorn and Sekhukhune Areas |
PLK24/13 |
2024-04-17 10:00 |
2024-04-30 11:00 |
The Manufacture and Supply of Concentric Cable to Polokwane, Bela-bela, Middelburg and Nelspruit Warehouses Within Limlanga Cluster (limpopo and Mpumalanga) on a Once-off Basis with Staggered Deliveries. |
LP00132FM |
- |
2023-12-05 10:00 |
The Provision of Mv and Lv Electrification Infrastructure and Connections (households and Infills) Within the Limlanga Cluster – Limpopo Over a Period of 48 Months. |
LPOO125NK |
- |
2023-09-29 10:00 |
Manufacture and Supply of Cable Electrical 19core by 2.5mm2 Within the Limlanga Cluster on a Once off Basis with Staggered Deliveries for 12 Months. |
LP00116K |
2023-06-21 10:00 |
2023-07-04 10:00 |
Manufacture and Supply of Various Copper Materials Within the Limlanga
Cluster for 5 Years on an “as and When” Required Basis |
LP0098HM |
- |
2023-05-16 10:00 |
Replacement, Installation and Repairs of Underground Cables Services for the 11kv-33kv Network |
LPOO101NK |
2023-01-27 10:00 |
2023-02-17 10:00 |
Appointment of Two (02) Service Providers to Supply, Deliver and off Load Electrical Cables for a Period of Three (03) Years |
PM36/2022 |
- |
2023-01-31 10:00 |
Electrification of Alldays(20) and Diepsloot Phase (19) |
BM10/22/23 |
2022-10-19 11:00 |
2022-10-26 11:00 |
Electrification of Lekgwara (40 Household Connections) |
BM09/22/23 |
2022-10-18 11:00 |
2022-10-25 11:00 |
The Construction of Mv and Lv Feeder Lines Including Designated Material to Be Supplied by the Contractor for Various Zones Within the Limlanga Cluster (limpopo & Mpumalanga) on an “as and When” Required Basis for a Period of 36 Months. |
LP0083SM |
2022-08-16 10:00 |
2022-09-01 10:00 |
The Appointment of Additional 66 Contractors to the Existing Panel Contract for the Provision of Minor Reticulation Services Within Limlanga Cluster (limpopo and Mpumalanga). |
LP0082SW |
2022-08-05 10:00 |
2022-08-19 10:00 |
Appointment of Service Provider for Supply and Installation of Electrical Network in Boikhutsong Phase 3 Village (1089 Stands, Including Empty Stands) (multi-year) |
PM50/2021 |
- |
2022-06-13 10:00 |
Supply and Installation of Electrical Network in Polokwane Extension 133 – Phase 1 (multi-year) |
PM28/2021 |
- |
2022-03-17 10:00 |
Appointment of Three (03) Service Providers for Electrical Building Maintenance Works for Municipal Wide Facilities for a Period of Three (03) Years (re-advert) |
PM107/2020 |
- |
2022-02-01 10:00 |
Supply and Installation of High Mast Lights in Polokwane Municipality Area of Jurisdiction. |
PM15/2021 |
- |
2021-12-07 10:00 |
Supply and Installation of Electrical Network in Ga-thaba Ext Village (202 Stands Including Empty Stands) |
PM02/2021 |
- |
2021-11-02 10:00 |
Supply and Installation of Electrical Network in Feke/matsane Villages (66 Stands Including Empty Stands) |
PM01/2021 |
- |
2021-11-02 10:00 |
Panel of Contractors for Preventative Maintenance, Service and Repair of Electrical High Tension Reticulation for 24 Months in Waterberg District |
PLK21/41 |
- |
2021-11-02 11:00 |
Panel of Contractors for Preventative Maintenance, Service and Repair of Electrical High Tension Reticulation for 24 Months in Capricorn and Sekhukhune Areas |
PLK21/40 |
- |
2021-11-02 11:00 |
Panel of Contractors for Preventative Maintenance, Service and Repair of Electrical High Tension Reticulation for 24 Months in Vhembe District |
PLK21/39 |
- |
2021-11-02 11:00 |
Appointment of a Panel of Five (5) Contractors for the Construction and Dismantling of High Voltage (hv) Sub-transmission Lines for Voltages Ranging from 66kv Up to and Including 132kv Within Limlanga Cluster -limpopo on an “as and When” Required Basis Over a Period of 36 Months |
LP0067MM |
2021-10-15 10:00 |
2021-11-05 10:00 |
Thohoyandou High Court: Site Clearance and Infrastructure for Mobile Units: Provision for Concrete Slabs, Connection of Electrical Supply Cables and Plumbing Services for Two Mobile Units, Storage Container and Mobile Ablution Facility. |
PLK21/22 |
- |
2021-09-21 11:00 |
Appointment of Three (03) Service Providers for Electrical Building Maintenance Works for Municipal Wide Facilities for a Period of Three (03) Years |
PM107/2020 |
- |
2021-09-17 10:00 |
The Supply and Delivery of Low Voltage and Medium Voltage Cables to Polokwane and Bela-bela Warehouses Within Limpopo Operating Unit on an as and when Required Basis Over a Period of 36 Months |
LP0022 AB |
- |
2020-12-04 10:00 |
The Construction of a New 32.5 Km 132 Kv Kingbird Line from Nhluvuko Substation to Tshebela Substation Within Limpopo Operating Unit Over a Period of 24 Months |
LP005MM |
2020-09-16 10:00 |
2020-10-05 10:00 |
Appointment of Service Provider to Supply and Deliver Traffic Robot Equipment and Cables for the Period of Three (03) Years |
PM147/2019 |
- |
2020-09-30 10:00 |
The Construction of a New 3.17km 132 Kv Kingbird Line from Syferkuil to Unin Substation Within Limpopo Operating Unit Over a Period of 6 Months |
LP001MM |
2020-08-12 10:00 |
2020-08-31 10:00 |