| The Supply, Delivery and Installation of Copper Clad Steel Conductors Used for Earthing Within National Transmission Company South Africa on an “as and When” Required Basis for a Period of Five (5) Years. |
MWP3056NTCSA |
2025-03-10 10:00 |
2025-03-31 10:00 |
| The Pre-qualification of the Original Equipment Manufacturers (oem) for the Manufacture, Supply, and Delivery of Estimated Requirements of Aerial Bundled Conductors with Bare or Neutral Supporting Conductors (abc) to Eskom Distribution Division on an “as and When” Required Basis for a Period of One (1) Year. |
MWP2527DX |
2024-05-21 10:00 |
2024-06-03 10:00 |
| The Pre-qualification of the Original Equipment Manufacturers (oem) for the Manufacture, Supply, and Delivery of Estimated Requirements of Low Voltage (lv) Power & Control Cables and Medium Voltage (mv) Power Cables to Eskom Distribution Division on an “as and When” Required Basis for a Period of One (1) Year. |
MWP2528DX |
2024-05-21 10:00 |
2024-06-05 10:00 |
| The Pre-qualification of the Original Equipment Manufacturers (oem) for the Manufacture, Supply, and Delivery of Estimated Requirements of Concentric Cable (6 Mm²) to Eskom Distribution Division on an “as and When” Required Basis for a Period of One (1) Year. |
MWP2529DX |
2024-05-21 09:00 |
2024-05-30 10:00 |