| Panel of Service Providers for Maintenance of Roads and Stormwater Drainage System Within Moses Kotane Local Municipality Areas for a Period of Thirty-six (36) Months on as and when Required Basis |
015/MKLM/2024/2025 |
2025-05-12 09:00 |
2025-06-02 10:00 |
| Upgrading of Low Volume Gravel Roads with the Use of Bitumen Stabilised Material (bsm Base Layer) for the Roads and Stormwater Maintenance Department in the South Region of Ethekwini Municipality for 36 Months. |
1M.31188 |
- |
2025-05-23 11:00 |
| Upgrading of Low Volume Gravel Roads with the Use of Bitumen Stabilised Material (bsm Base Layer) for the Roads and Stormwater Maintenance Department in the North Region of Ethekwini Municipality for 24 Months. |
1M.31187 |
- |
2025-05-23 11:00 |
| Upgrading of Low Volume Gravel Roads with the Use of Bitumen Stabilised Material (bsm Base Layer) for the Roads and Stormwater Maintenance Department in the West Region of Ethekwini Municipality for 24 Months. |
1M.31190 |
- |
2025-05-23 11:00 |
| Upgrading of Low Volume Gravel Roads with
The Use of Bitumen Stabilised Material (bsm
Base Layer) for the Roads and Stormwater
Maintenance Department in the South
Region of Ethekwini Municipality for 36
Months |
31188-1M |
2025-04-30 09:00 |
2025-05-23 11:00 |
| Upgrading of Low Volume Gravel Roads with
The Use of Bitumen Stabilised Material (bsm
Base Layer) for the Roads and Stormwater
Maintenance Department in the North
Region of Ethekwini Municipality for 24
Months |
31187-1M |
2025-04-30 09:00 |
2025-05-23 11:00 |
| Construction and Rehabilitation of Stormwater Drainage at Stanger High Sport Filed |
CQ39001-04 |
- |
2025-04-25 12:00 |
| To Construct V-Drain, Kerb, Channel and Embarkment Protection in Panorama Drive in Ward 3 |
CQ3902-04 |
- |
2025-04-25 12:00 |
| Verulam and Umdloti Wastewater Treatment Works in the Northern Sewer Drainage Catchment: Storm Damage Repairs |
30976.5W |
2025-04-14 10:00:00 |
2025-05-09 11:00 |
| Fosrby-rfp-75-24/25 Request for Proposal for the Gysum Dam Refurbishment, Phase 1-stormwater Channel, Overflow Spillway and Perimeter Fence |
FOSRBY-RFP-75-24/25 |
2025-04-16 11:00 |
2025-05-06 12:00 |
| Verulam and Umdloti Waste Water
Treatment Works: Storm Damage Repairs |
30976-5W |
2025-04-14 10:00 |
2025-05-09 11:00 |
| Provision of Incremental Services to
Informal Settlements Within the Western
Region: Lower Thornwood: Access Roads,
Footpaths and Associated Stormwater
Control Works (ward 14) |
31564-2V |
2025-03-31 12:00 |
2025-04-25 11:00 |
| Provision of Incremental Services to
Informal Settlements Within the Western
Region: Asinamali: Access Roads, Footpaths
And Associated Stormwater Control Works
(ward 63) |
31560-2V |
2025-03-31 10:00 |
2025-04-25 11:00 |
| Construction of Stormwater and Retaining Wall in 153 Lagoon Drive in Ward 12 |
CQ3888-03 |
- |
2025-04-04 12:00 |
| Provision of Incremental Services to
Informal Settlements Within the Western
Region: Asinamali: Access Roads, Footpaths
And Associated Stormwater Control Works
(ward 63) |
31560-2V |
2025-03-31 10:00 |
2025-04-25 11:00 |
| Provision of Incremental Services to Informal Settlements Within the Northern Region: Amaotana: Access Roads, Footpaths and Associated Stormwater Control (ward 53). |
4V.30991 |
- |
2025-04-11 11:00 |
| Provision of Incremental Services to
Informal Settlements Within the Northern
Region: Amaotana: Access Roads, Footpaths
And Associated Stormwater Control (ward
53) |
30991-4V |
2025-03-17 10:00 |
2025-04-11 11:00 |
| Provision of Incremental Services to
Informal Settlements Within the Northern
Region: Amaotana: Access Roads, Footpaths
And Associated Stormwater Control (ward
53) |
30991-4V |
2025-03-17 10:00 |
2025-04-11 11:00 |
| Enquiry for the Repair to Stormwater Inlets
As and when Required in the West Central
Region of Ethekwini Municipality for 24
Months |
30756-1M |
2025-01-31 09:00 |
2025-02-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets
As and when Required in the North Central
Region of Ethekwini Municipality for 24
Months |
30757-1M |
2025-01-31 09:00 |
2025-02-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets as and when Required in the North Central Region of Ethekwini Municipality for 24 Months. |
30757-1M |
- |
2025-02-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets as and when Required in the South Central Region of Ethekwini Municipality for 24 Months. |
30755-1M |
- |
2025-01-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets as and when Required in the West Central Region of Ethekwini Municipality for 24 Months. |
30756-1M |
- |
2025-02-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets
As and when Required in the South Central
Region of Ethekwini Municipality for 24
Months |
30755-1M |
2025-01-31 09:00 |
2025-02-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets
As and when Required in the South Central
Region of Ethekwini Municipality for 24
Months |
30755-1M |
- |
2025-02-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets
As and when Required in the North Central
Region of Ethekwini Municipality for 24
Months |
30757-1M |
- |
2025-02-28 11:00 |
| Enquiry for the Repair to Stormwater Inlets
As and when Required in the West Central
Region of Ethekwini Municipality for 24
Months |
30756-1M |
- |
2025-02-28 11:00 |
| For the Provision of Stormwater Management Study Within the Port of Richards Bay |
TPT/2025/01/0041/86719/RFI |
2025-01-31 11:00 |
2025-02-21 11:00 |
| Supply and Delivery of Stormwater Pipes (re-advert) |
PWBS-B0020/24/25 |
- |
2025-02-27 12:00 |
| Tender Section for Znb02571/00000/00/pmr/inf/24/t the Construction of Earthworks, Layerworks, Surfacing and Drainage Structures on Main Road P165, Phase 3 (km 38+295 Km 46+595) in the Pietermaritzburg Region.
Closing Date: 22 January 2025 2025 |
ZNB02571/00000/00/PMR/INF/24/T |
2024-12-11 10:00:00 |
2025-01-22 11:00 |
| Erratum Advert - Tender Mn: 151/2024 Panel of Contractors for Stormwater Improvement for 3 Years Per |
ERRATUM ADVERT: TENDER MN:151/2024 |
- |
2025-01-24 12:00:00 |
| Re-gravelling of Existing Gravel Roads and the Preparation of Gravel Roads to Be Upgraded to Black Top in the South Region of Ethekwini Municipality for 36 Months. |
30681.1M |
- |
2025-01-31 11:00 |
| Re-gravelling of Existing Gravel Roads and the Preparation of Gravel Roads to Be Upgraded to Black Top in the North Region of Ethekwini Municipality for 36 Months. |
30678.1M |
- |
2025-01-31 11:00 |
| Framework Agreement for Appointment of Professional Service Providers: Provision of Consulting Engineering Services: Infrastructure Projects: Roads and Stormwater Service. |
MISA/FC/022/2024/25 |
- |
2024-12-12 11:00 |
| The Construction of Earthworks, Layerworks, Surfacing and Drainage Structures on Main Road 165, Phase 3 (km38+295 to Km46+595) in the Pietermaritzburg Region |
ZNB02571-00000-00-PMR-INF-24-T |
2024-12-11 10:00 |
2025-01-22 11:00 |
| Panel of Contractors for Stormwater Improvement for a Period of 3 Years |
TENDER NO. MN 151/2024 |
- |
- |
| Storm Water for Sundumbili Chc |
SUN591.24.25.pdf |
2024-11-18 10:00 |
2024-11-22 11:00 |
| Provision of the Howick Manifold Bund Floor, Drainage & Ht Yard Rehabilitation |
TPL/2024/07/0003/71648/RFQ |
2024-11-27 10:00 |
2024-12-06 16:00 |
| Tender No Mn 151/2024 Panel of Contractors for Stormwater Improvement for a Period of 3 Years |
TENDER NO MN 151/2024 |
2024-11-28 10:00 |
2025-01-25 12:00 |
| Itrump Area Based Management (abm), Durban Point Waterfront and Maydon Wharft Area Maintenance Repairs of Roads and Stormwater Infrastructure as and when Required Within Ethekwini Muncipality for 36 Months. |
30044.1M |
2024-10-18 09:00 |
2024-11-15 11:00 |
| The Construction of Civil Infrastructure for
The Klaarwater Station Housing Project
(phase 1c), in Ward 16 |
30700-2V |
2024-10-18 10:00 |
2024-11-01 11:00 |
| Itrump Area-based Management (abm),
Durban Point Waterfront and Maydon
Wharf Area Maintenance Repairs of Roads
And Stormwater Infrastructure as and when
Required Within Ethekwini Municipality for
36 Months |
30044-1M |
2024-10-18 09:00 |
2024-11-15 11:00 |
| Itrump Area-based Management (abm), Durban Point Waterfront and Maydon Wharf Area Maintenance Repairs of Roads and Stormwater Infrastructure as and when Required Within Ethekwini Municipality for 36 Months |
30044-1M |
2024-10-18 09:00 |
2024-11-15 11:00 |
| Professional Services Contract for the
Provision of Engineering Services to
Informal Settlements Within the Ethekwini
Municipality Incremental Services
Programme - Roads, Footpaths and
Stormwater (rfs) |
2V-30428 |
- |
2024-11-08 11:00 |
| Stormwater Repair: Ithuba Avenue
Stormwater Repairs and Gabion Protection –
Ward 24 |
1D-30058 |
2024-09-23 09:00 |
2024-10-04 11:00 |
| Stormwater Repair: 33 School Road, Ottawa -
Ward 102 |
1D-30057 |
2024-09-23 11:00 |
2024-10-04 11:00 |
| The Replacement of the Storm Water Pipe and Parking in the New Germany Office Complex, Kwa-zulu Natal Operating Unit, Central East Cluster |
KZN154 |
2024-09-06 10:00 |
2024-10-03 10:00 |
| Cscm Framework Contract for the Repair and
Rehabilitation of Civil and Structural Works
Related to River, Coastal and Stormwater
Infrastructure |
F21 – CSCM FRAMEWORK CONTRACT |
- |
2024-10-04 11:00 |
| Construction of Stormwater Headwalls |
PWBS-B026/24/25 |
2024-08-19 10:00 |
2024-08-29 12:00 |
| Sourcing of a Turnkey Contractor (engineer, Procure and Construct) for the Rehabilitation of Surfaced Roads, Drainage, and Ancillary Works on District Road D893 from Km0.000 to Km2.415 in the Maphumulo Local Municipality, Durban Region - Grade 7ce or Higher |
ZNB02439/00000/00/DUR/INF/24/T |
2024-08-01 10:00 |
2024-08-26 11:00 |