| Request for Quotation (rfq) for the Installation of 11kv Phase Wires and the Associated Components Between Mamelodi Gardens and Green View Station on a Once off Basis. |
RE-10362351 B |
2025-11-28 11:00 |
2025-12-05 10:00 |
| Supply, Install and Commission Change Over Yard Mod Rods and Switches at Pyramid South Yard |
ERACTK-KDS-56514 |
2025-10-30 11:00 |
2025-11-06 10:00 |
| Supply, Install and Commission Change Over Yard Mod Rods and Switches at Pyramid South Yard |
TFR/2025/10/0007/109681/RFQ |
2025-10-30 11:00 |
2025-11-06 10:00 |
| Supply, Install and Commission Change Over Yard Mod Rods and Switches at Pyramid South Yard |
ERACTK-KDS-56514 |
2025-10-30 11:00 |
2025-11-06 10:00 |
| For the Supply and Delivery of F4 Concrete Sleepers (tie Railroad Conc;f4, Plastic Fist) at Polokwane Depot |
ERACET-POE-56443 |
2025-10-22 10:00 |
2025-10-29 10:00 |
| For the Repairs and Service of Hydraulic Track Maintenance Tools on an “as and When” Required Basis Over a Period of 2 Years |
ERACES KDS 53329 |
- |
2025-10-28 10:00 |
| Once-off Supply, Installation, Testing and Commissioning of Four Lifting Coach Jacks at Tfrs Railway Technology Development Center in Koedoespoort, Including the Provision of Training of Operators and Maintenance Services for the Four Lifting Coach Jacks |
HOAC-HO-50115 CIDB |
2025-09-02 11:00 |
2025-09-23 12:00 |
| Once-off Supply, Installation, Testing and Commissioning of Four Lifting Coach Jacks at Tfrs Railway Technology Development Center in Koedoespoort, Including the Provision of Training of Operators and Maintenance Services for the Four Lifting Coach Jacks |
HOAC-HO-50115 CIDB |
2025-09-02 11:00 |
2025-09-16 12:00 |
| Maintenance of Railway Track with Ontrack Overhead Track Equipment Heavy Machines |
TFR/2025/06/0024/99830/RFP |
- |
2025-07-04 10:00 |
| Rfq for the Establishment of the Rolling Stock Leasing Company (leaseco) for Transnet Soc Ltd Operating as Transnet Corporate Centre |
TCC/2025/03/0001/92339/RFQ |
2025-05-06 11:00 |
2025-08-04 16:00 |
| Supply, Testing and Commissioning of Breakdown Recovery Equipment for Capecor Locomotive Maintenance Depots; Wentworth Diesel Depot; Germiston Locomotives Maintenance Depot and Krugersdorp Locomotives Maintenance Depot. |
TE/2024/12/0002/85574/RFQ |
2025-01-20 09:00 |
2025-01-31 11:00 |
| Supply, Installation and Commissioning of Three Cross Overs at Pretoria North Station for Metrorail Gauteng Province |
10352495 |
2024-09-05 11:00 |
2024-09-12 10:00 |
| For the Supply and Delivery of Mk5 Side Frames (bogies) for Transnet Engineering,nationally, on an “as and When” Required Basis for a Period of Five (5) Years |
TE24-GMX-9AA-09048 |
2024-05-06 11:00 |
2024-05-31 12:00 |
| Request for Quotation (rfq) for the Appointment of a Service Provider for the Supply and Delivery of Track Mounted Rail and Flange Lubricators in the Gauteng Region on an “as and when Required Basis” for a Period of 12 Months. |
10348797 |
- |
2024-04-12 10:00 |
| Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation Between Olifantsfontein and Irene Station for a Period of Eight (8) Months |
55/03/2024 Gau-(PER) |
2024-04-12 10:00 |
2024-05-03 12:00 |
| Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation Between Pierneefsrus and Queenswood Station for a Period of Eight (8) Months |
54/03/2024 Gau-(PER) |
2024-04-12 10:00 |
2024-05-03 12:00 |
| Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation Between Gezina and Deerness Station for a Period of Eight (8) Months |
53/03/2024 Gau-(PER) |
2024-05-03 10:00 |
2024-05-03 12:00 |
| Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation Between Centurion and Irene Station for a Period of Eight (8) Months |
52/03/2024 Gau-(PER) |
2024-04-12 10:00 |
2024-05-03 12:00 |
| Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation Between Hercules and Belle Ombre Station for a Period of Eight (8) Months |
51/03/2024 Gau-(PER) |
2024-04-12 10:00 |
2024-05-03 12:00 |
| Bid Specification - Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation Between Pretoria North and Wolmerton Station for a Period of Eight (8) Months |
50/03/2024 Gau-(PER) |
2024-04-12 10:00 |
2024-05-03 12:00 |
| Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation at Pienaarspoort Area for a Period of Eight (8) Months |
49/03/2024 Gau-(PER) |
2024-04-12 10:00 |
2024-05-03 12:00 |
| Appointment of a Service Provider for Turnkey (design and Construction) Service for Drainage System Upgrade, Embankment, Stream Works, and Railway Works with Formation Rehabilitation Between Kopanong and Soshanguve Station for a Period of Eight (8) Months |
48/03/2024 Gau-(PER) |
2024-04-12 10:00 |
2024-05-03 12:00 |