| Supply Various Items to Durban Container Terminal Pier 2 |
TPT/2025/02/0020/89113/RFQ |
- |
2025-02-20 15:00 |
| Supply Various Items to Durban Container Terminal Pier 2 |
TPT/2025/02/0022/89119/RFQ |
- |
2025-02-20 15:00 |
| Design, Supply, Install, Commission
And Maintain Three (3) Solar Pv Plants,
Each at or Tambo International Airport, Cape Town International Airport and King Shaka International Airport |
COR7739/2025/RFP |
2025-02-24 11:00 |
2025-05-05 12:00 |
| For the Provision Of: Supply and Delivery of Couplers |
TPT/2025/02/0047/88135/RFQ |
- |
2025-02-11 12:00 |
| Supply, Delivery, Removal, Installation, Testing and Commissioning to Repair the Ring Main Unit Located at Teakwood Road Substation for Transnet Engineering |
TE/2025/02/0004/87864/RFQ |
2025-02-14 11:00 |
2025-02-21 11:00 |
| For the Supply, Delivery, Removal, Installation, Testing and Commissioning to Repair the Ring Main Unit Located at Teakwood Road Substation for Transnet Engineering. |
TE/2025/02/0004/87864/RFQ |
- |
2025-02-21 11:00 |
| For the Supply of Power Supply, 400v Ac, 50hz-24v Dc, 20a to Durban Container Terminal Pier 2 |
TPT/2025/01/0011/86236/RFQ |
- |
2025-01-23 12:00 |
| Repairing a Buchholz Relay, Oil Top Up, Testing and Purification of a 3kv Dc Traction Substation, at Transnet Freight Rail Ladysmith Depot, for a Period of One (01) Month |
TFR/2025/01/0009/86253/RFQ |
2025-01-30 10:00 |
2025-02-11 10:00 |
| Supply and Delivery of Maintenance and Technical Spares for Alrode, Durban and Ladysmith Stores Over a Once off Period |
TPL/2025/01/0002/85989/RFQ |
- |
2025-01-30 12:00 |
| Supply of Various Items to Pier One Stores. |
TPT/2025/01/0044/85796/RFQ |
- |
2025-01-17 12:00 |
| Supply and Delivery of Ferrule Comprsn;conex,id:15 Mm,brs |
TPT/2024/12/0040/85310/RFQ |
- |
2024-12-13 12:00 |
| Supply and Delivery of Technical Spares for Alrode and Pinetown Stores Over a Once off Period |
TPL/2024/12/0002/85260/RFQ |
- |
2024-12-13 15:00 |
| Contractor Appointment for Supply, Delivery, Offload, Installation, and Commissioning of 18 Dry- Type Transformers for a Period of 2 Years at King Shaka International Airport. |
KSIA7595/2024/RFP |
2025-01-23 10:00 |
2025-02-28 11:00 |
| Supply and Delivery of Electrical Stock Consumables for Pinetown and Ladysmith Stores Over a Once off Period |
TPL/2024/11/0003/84085/RFQ |
- |
2024-12-04 12:00 |
| Replacement of Existing 150kva Generator with a New 350kva Generator and New Distribution Panel at 202 Anton Lembede Street |
TPL/2024/02/0003/56566/RFP |
2024-12-03 10:00 |
2025-01-24 12:00 |
| Re-advert request for supply, installation and commissioning of solar PV system at NHLS Public Health Laboratory. |
RFQ KZN 1173735 |
- |
2024-12-03 11:00 |
| Re-advert request for supply, installation and commissioning of solar back up system at NHLS Northdale Laboratory. |
RFQ KZN 009085 |
- |
2024-12-03 11:00 |
| Re-advert request for supply, installation and commissioning of solar back up system at NHLS Edendale Laboratory. |
RFQ KZN 0034602 |
- |
2024-12-03 11:00 |
| For the Supply and Delivery of Earth Cable Spares for Rotary Machines Business Durban for a Once off Period |
TE-2024-11-0002-81853-RFP |
- |
2024-11-29 10:00 |
| Supply, Delivery and Off-loading of Low
Voltage Cable Joint and Termination Kits,
Heat Shrink Tubes and Cable End Caps for a
Period of 36 Months |
30355(5E) |
- |
2024-12-13 11:00 |
| The Supply, Maintenance and Repair of Medium Voltage and Low Voltage Substations and Medium and Low Voltage Overhead and Underground Mains for Mv/lv Operations During a Thirty-six Month Period Fixed Team. |
30150-5E |
- |
2024-12-13 11:00 |
| Supply, Delivery, Off-Loading, Installation and Testing of 11 Kv and 33 KV Metal Enclosed Double Busbar Fixed Pattern Switchgear for a Fixed Period of Thirty-Six Months |
27648-5E |
- |
2024-12-13 11:00 |
| Supply, Delivery, Off-loading, Installation
And Testing of 11kv and 33kv Metal
Enclosed Double Busbar Fixed Pattern
Switchgear for a Fixed Period of 36 Months |
27648(5E) |
- |
2024-12-13 11:00 |
| For the Supply of Fixture Lighting;rled-2 ,phoenix;led to Durban Container Terminal Pier 2 |
TPT/2024/11/0009/82186/RFQ |
- |
2024-11-11 12:00 |
| Supply and Delivery of Hardware Materials for Transnet Soc Limited (reg No. 1990/000900/30) Operating as Transnet Port Terminals (tpt) at Durban Break Bulk Cargo Terminals for Period of Thirty-six (36) Months |
TPT/2024/11/0021/82055/RFQ |
- |
2024-11-18 12:00 |
| Straddles Workshop Circuit Breakers (purchasing) |
TPT/2024/11/0045/81949/RFQ |
- |
2024-11-07 12:00 |
| Appointment of Service Providers for Supply and Delivery of 4 Colour Signal Torch - 4 X Led Cree Xpg: White, Red, Yellow, Green for Prasa Rail Kzn. |
KZN/RAIL/11/2024/02-Q |
- |
2024-11-11 12:00 |
| Supply and Delivery of Battery Chargers and
Associated Vented Nickel Cadmium Battery
Banks During 36-month Period |
30645 (5E) |
- |
2024-12-06 11:00 |
| Supply, Delivery and Off-loading of High and
Medium Voltage Xlpe, Oil-filled and Paper
Insulated Lead Covered (pilc) Cable
Accessories for a 36-month Period |
30628 (5E) |
- |
2024-12-06 11:00 |
| Supply and Delivery of Cable Oil for 33kv and
132kv Fluid-filled Underground Power
Cables During a 36-month Period |
30625 (5E) |
- |
2024-12-06 11:00 |
| Supply, Delivery and Off-loading of
Compression Terminal Lugs and Joint Ferrules
For Aluminium and Copper Conductors
During a 36-month Period |
30534 (5E) |
- |
2024-12-06 11:00 |
| Supply, Delivery and Offloading of High and Medium Voltage Xlpe, Oil-filled and Paper Insulated Lead Covered (pilc) Cable Accessories for a 36 Month Period. |
30628-5E |
- |
2024-12-06 11:00 |
| Supply and Delivery of Battery Chargers and Associated Vented Nickel Cadmium Battery Banks During a Thirty-six-month Period. |
30645.5E |
- |
2024-12-06 11:00 |
| Supply, Delivery and Off-loading of Compression Terminal Lugs and Joint Ferrules for Aluminium and Copper Conductors During a 36-month Period. |
30534.5E |
- |
2024-12-06 11:00 |
| Supply and Delivery of Cable Oil for 33 Kv and 132 Kv Fluid-filled Underground Power Cables During a Thirty-six Month Period. |
30625.5E |
- |
2024-12-06 11:00 |
| Applications Are Hereby Invited from New Entrants Wishing to Be Placed on Transnet Pipelines Standing Approved List as Suppliers / Manufacturers for Technical Spares for Repairs and Maintenance as Set Out in "annexure A" |
TPL/2024/10/0003/79096/RFP |
- |
2024-11-15 16:00 |
| Provision of Rmg01 Energy Chain Installation at Durban Container Terminal Pier 1 (once Off) |
TPT/2024/10/0037/81028/RFQ |
2024-10-25 10:00 |
2024-10-31 14:00 |
| Supply, Delivery and Off-loading of 11 Kv Pole-mounted Auto-reclosers and Sectionalisers During a Thirty Six Month Period. |
30042.5E |
- |
2024-11-15 11:00 |
| Supply, Delivery, Off-loading, Installation, Testing and Commissioning of 11 Kv Fixed-pattern Switchgear Panels During a 36-month Period. |
30547.5E |
- |
2024-11-15 11:00 |
| Supply and Delivery of Meter Cards and Seals for Electricity Energy Dispensers During a Thirty-six Month Period |
27723.5E |
- |
2024-11-15 11:00 |
| Supply, Delivery, Off-loading, Installation,
Testing and Commissioning of 11kv Fixedpattern Switchgear Panels During a 36-
Month Period |
30547 (5E) |
- |
2024-11-15 11:00 |
| Supply, Delivery and Off-loading 11kv Polemounted Auto-reclosers and Sectionalisers
During a 36-month Period |
30042(5E) |
- |
2024-11-15 11:00 |
| Supply, and Delivery of Meter Cards and
Seals for Electricity Energy Dispensers
During a 36-month Period |
27723 (5E) |
- |
2024-11-15 11:00 |
| For the Supply of Relay;3sk1211-1bw20, to Durban Contaner Terminal Pier 2 |
TPT/2024/10/0019/79568/RFQ |
- |
2024-10-14 12:00 |
| For the Provision Of: Supply and Delivery of Step-down Transformer and
Accessory Electrical Components for Delvillewood-durban |
TFR/2024/10/0012/78800/RFQ |
- |
2024-10-21 10:00 |
| For the Provision of Remove and Replace Db’s at Ees Hauler Workshop Required at Durban Container Terminal Pier 1 (once Off) |
TPT/2024/10/0028/78676/RFQ |
2024-10-04 10:00 |
2024-10-10 14:00 |
| For the Provision Of: Supply and Delivery of Step-down Transformer and
Accessory Electrical Components for Delvillewood-durban
For a Period Of: Once-off |
CRAC DNR 48469 |
- |
2024-10-15 10:00 |
| Supply, Delivery and Off-loading of Remote
Terminal Units for Use on Ethekwini
Electricity’ Electrical Network During a 24-
Month Period |
26458(5E) |
- |
2024-10-25 11:00 |
| Appointment of a Service Provider to Supply and Install Fluorescent Tubes, Starters and Fluorescent Tube Holders |
RFQ 2024/25/40 |
- |
2024-09-16 12:00 |
| For the Supply and Delivery of Electrical Tools, Materials, Spares and Consumables on an “as and When” Basis to Various Transnet Sites Within the Kzn Region for a Period of 36 (thirty -six) Months. |
TP/2024/07/0010/72927/RFP |
2024-09-13 11:00 |
2024-10-14 12:00 |