| Appointment of a Contractor for the Procurement, Engineering, Supply, Install, Test and Commission Including Maintenance of 1000-kwp Photovoltaic Solar Rooftop at Durban Station |
HO/CRES/DBN/ENERGY/2/8/2024 |
2024-09-17 10:00 |
2024-10-04 12:00 |
| Supply, Delivery and Off-loading of Outdoor
11kv Drop-out Fuse Assemblies, 11kv Single
Phase Isolating Switches and 11kv Gang
Operated Link Switches During a 36-month
Period |
30018(5E) |
- |
2024-10-11 11:00 |
| To Supply, Delivery, Replacement, Installation of 10 Electrical Panels For
Heating/bake Out Ovens (including Installation of Siemens S7 Plc Program),
Testing and Commisioning. at Transnet Engineering Once off Period. |
TE-2024-05-0012-66589-RFQ |
2024-09-04 10:00 |
2024-09-13 14:00 |
| Supply and Delivery of Railway Signaling Cables Elements on the Reunion-clairwood |
TECH-HO-10350821-08-2024 |
- |
2024-08-28 10:00 |
| Supply and Delivery of Cables for Recovery of Railway Signaling Elements on the Durban - Avoca |
TECH-HO-10350823-08-2024 |
- |
2024-08-26 10:00 |
| Supply, Delivery and Off-loading of Consumer
Distribution Units (consisting of Frames,
Weatherproof Covers and Locking Pins) and
Pilot Cable Pillar Boxes During a 36-month
Period |
29928 (5E) |
- |
2024-09-27 11:00 |
| Request for Quotation (rfq): the Appointment of a Service Provider for the Replacement of Electrical Equipment in Durban Substation for Prasa Rail Kzn |
KZN/RAIL/08/2024/03/Q |
2024-08-27 10:00 |
2024-09-03 12:00 |
| National Department of Public Works & Infrastructure: Durban Regional Office: Workshops: Supply of Electrical Materials to Workshop for a Period of 36 Months Term Contract. |
DBN24/08/01 |
2024-08-20 11:00 |
2024-09-02 11:00 |
| Design, Manufacture, Supply, Delivery,
Erection, Installation, Testing, Commissioning
And Handover of Protective Structure
Enclosure for a Period of 36 Months |
27710 (5E) |
- |
2024-09-13 11:00 |
| Appointment of a Service Provider to Supply and Install Fluorescent Tubes and Starters |
RFQ 2024/25/13 |
2024-07-19 10:00 |
2024-07-22 16:00 |
| Appointment of Engineering, Procurement and Construction (epc) Service Provider for a 4.4 Mw Ground Mounted Solar Photovoltaic Power Plant; and Operation & Maintenance for a Three-year Period at the Dube Tradeport |
DTP/RFP/07/IFR/06/2023 |
2024-07-15 13:00 |
2024-08-30 11:00 |
| Supply, Delivery, Installation and Commissioning of Solar Systems at Cc Kwadukuza, Cc Metro and Cc Port Shepstone |
ZNB02385/00000/00/DUR/INF/24/T |
2024-07-15 10:00 |
2024-08-01 11:00 |
| Rfq/24/25/51/ln - Supply and Delivery of Lights Bulbs for Durban, 290 Dr Pixley Kaserne, Durban - Kzn Regional Office
Closing Date and Time 2024/06/28 @ 11h00
Submission to the Hand Delivered To: Corner James Dr and Moreleta Street, Silverton, Pretoria, 0184 |
RFQ/24/25/51/LN |
- |
2024-06-28 11:00 |
| For the Supply and Delivery of Electrical Components and Maintenance Material for the Stores at Power Supplies and Services Depot in the Port of Durban on an “as and when Required” Basis for a Period of Thirty-six (36) Months |
TNPA/2024/02/0030/55660/RFP |
2024-06-21 10:00 |
2024-07-09 01:00 |
| Supply, Delivery, Installation and Testing of
Outdoor 132kv and 275kv Switchgear and
Associated Equipment for a Period of 36
Months for Various Substations |
27040-5E |
- |
2024-06-28 11:00 |
| Supply, Delivery and Offloading of Low Voltage Distribution Assemblies During a 36-
Month Period |
28619(5E) |
- |
2024-06-21 11:00 |
| For the Design, Supply, Install & Commission of Twenty (20) New Dual 11/6.6 Kv Mini Substations in Various Areas in the Port of Durban For
A Period of Fifteen (15) Months |
TNPA/2023/07/0002/34490/RFP |
2024-05-08 10:00 |
2024-06-03 12:00 |
| Supply, Delivery and Offloading of Earth Rods, Clamps, Couplers and Galvanised Steel Conduit for Earth Down Wires During a 36-month Period |
29035(5E) |
- |
2024-05-31 11:00 |
| Supply, Delivery and Offloading of Staywires and Associated Components During a 36-month Period |
29023(5E) |
- |
2024-05-31 11:00 |
| The Establishment of an Enabling Agreement with a Maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “big Five” Material Which Include Meters, Poles/cross Arms, Transformers, Cable and Conductor), Transport (as it Will Be Required and Authorised) for Electrification of New Household Connections (above R3 000 000,00 Per Project) for a Period of Thirty (30) Months (twenty-four (24) Months for Allocation of Task Orders and Six (6) Months for the Close-out of Projects and Finalisation of the Payment Process) for Distribution Division in the Kzn Operating Unit, Central East Cluster as and when Required. |
KZN132 |
2024-05-07 09:00 |
2024-05-31 10:00 |
| Supply, Delivery and Offloading of
Photoelectric Control Units and Associated
Items During a 36-month Period |
26969(5E) |
- |
2024-05-17 11:00 |
| Supply and Delivery of Light Bulbs at Our Regional Office Kzn |
RFQ No.23/24/81 BN/KZN |
- |
2024-03-06 11:00 |
| Supply and Delivery of Traffic Signal Vandal
Resistant Head Assembles for 36 Months |
1T-27245 |
- |
2024-03-22 11:00 |
| Supply, Delivery and Offloading of 132kv and
275kv Silicon Composite Insulators During a
36-month Period |
27888-5E |
- |
2024-03-22 11:00 |
| Request for Tender: Replacement and Upgrade of Booth 3kv Dc Traction Substation: Kwa-zulu Natal Region |
HO/PT/SI/E/242/01/2024 |
2024-02-13 11:00 |
2024-03-05 12:00 |
| Request for the Appointment of a Service Provider: to Supply and Deliver Consumables and Spares for Maintenance of Telecommunication Systems at Prasa Rail in Kwazulu Natal Region (kzn) |
KZN/RAIL/2024/01/03/Q |
- |
2024-02-09 12:00 |
| Emergency Supply, Delivery and Off-loading of Current Transformer Driven and Whole Current Electricity Meters |
27931 (5E) |
2024-02-02 10:00 |
2024-02-09 11:00 |
| Request for Proposal for :the Appointment of a Service Provider for the Supply, Installation and Commissioning of Signalling Cables and Equipment Between Rossburgh and Pinetown Stations (including Durban Ctc) for the Signal Department in the Kzn Region for a Period of Ten (10) Months |
DBN/CAP(BAC 022/1) |
2024-01-25 10:00 |
2024-02-19 12:00 |